• 제목/요약/키워드: system-level management

검색결과 4,968건 처리시간 0.032초

제조업 유통경로관리 특성과 개선방향

  • 박윤재
    • 한국유통학회지:유통연구
    • /
    • 제1권1호
    • /
    • pp.65-81
    • /
    • 1996
  • Despite the impressive economic growth over the past several decades, Korea's distribution sector has remained quite underdeveloped. Until recently, management of the marketing channels also has been staying at an unsophisticated level. The Korean marketing channel system is largely characterized by 1) undifferentiated channel types among the competing manufacturers, 2) dominance by the manufacturers over the other channel members, 3) high level of conflicts among the channel members, 4) inefficient marketing information system, and 5) lack of managers properly trained in channel operation and management. Currently, major change factors emerged and has begun to directly affect the Korean marketing channel system. The most salient changes surrounding the Korean marketing channel system are 1) complete opening of the marketing channels for the foreigners, 2) emergence and spread of new types of channels 3) adoption of advanced information technology by the various channel members, 4) increase in flexibility in production and supply systems, 5) shift of power toward the retailers away from the manufacturers, 6) growing trend for cooperation and alliance among the traditional marketing institutions. To these changes the manufacturers have been reacting, rather than proacting, mostly using defensive measures. The proactive measures that are recommended on behalf of the manufacturers include 1) installation of the strategic channel management system, 2) development of the skills for efficient interorganization management, 3) investing in efficient system for marketing information and logistics management, 4) more efficient management of brands, and 5) maintenance of price-competitiveness.

  • PDF

신뢰도 예측 기반 신뢰도 성장 관리 : 감시체계 사례 (Reliability Prediction Based Reliability Growth Management : Case Study of Surveillance System)

  • 김상부;박우재;유재우;이자경;용화영
    • 품질경영학회지
    • /
    • 제47권1호
    • /
    • pp.187-198
    • /
    • 2019
  • Purpose: In this study, a reliability prediction based reliability growth management is suggested especially for the early development phase of a system and the case study of surveillance system is given. Methods: The proposed reliability prediction based reliability growth management procedures consists of 7 Steps. In Step 1, the stages for reliability growth management are classified according to the major design changes. From Step 2 to Step 5, system reliability is predicted based on reliability structures and the predicted reliabilities of subsystems (Level 2) and modules (Level 3). At each stage, by comparing the predicted system reliability with that of the previous stage, the reliability growth of the system is checked in Step 6. In Step 7, when the predicted value of sustem reliability does not satisfy the reliability goal, some design alternatives are considered and suggested to improve the system reliability. Results: The proposed reliability prediction based reliability growth management can be an efficient alternative for managing reliability growth of a system in its early development phase. The case study shows that it is applicable to weapon system such as a surveillance system. Conclusion: In this study, the procedures for a reliability prediction based reliability growth management are proposed to satisfy the reliability goal of the system efficiently. And it is expected that the use of the proposed procedures would reduce, in the test and evaluation phase, the number of corrective actions and its cost as well.

GSIS를 이용한 교량관리체계(橋梁管理體系) 구축(構築) (The Construction of Bridges Management System Using GSIS)

  • 양인태;김동문;신계종
    • 산업기술연구
    • /
    • 제18권
    • /
    • pp.43-50
    • /
    • 1998
  • According to complexity and high level of society, the rapid and accurate information for landuse, environment and traffic etc., is required, but the information management by a drawing and a map is confronted with a complicated and sudden change of facilities such as bridge; electricities, city gases and networks. This paper is aim to build a bridge management system of road with GSIS. It operated personal computer will bring easy computing management system of bridge on road. To build this system, presented bridge management system and domestic method for bridge management of road are investigated, and also apply to bridge management system using GSIS for site and character of bridges. And with that, position and character apply to bridge management system using GSIS.

  • PDF

국내 소프트웨어 사업자의 프로세스 기반구조 구축 및 개선 방안 연구 (A Study on the Construction and Improvement of Software Process Infrastructure for Software Firms In Korea)

  • 안연식;문송철;김동수
    • Asia pacific journal of information systems
    • /
    • 제14권4호
    • /
    • pp.23-47
    • /
    • 2004
  • This study was tried for the improvement of software process ability of the software firms, and analyzed empirically the impact that a software process infrastructure level influences on the software process level and process performance. The questionnaire were developed and data were collected from the process improvement correspondences or project quality managers of the 78 software firms. The result was shown that management-organization infrastructure was composed of software process improvement organization's role and activity, process standard and education, management system and supporting, management guides and procedures. And organization's standard development procedure or criteria, process asset, process support tools were included in technical infrastructure. This study provides that some components of software process infrastructure had an significant influence on the process level, process infrastructure management level, and software process performance.

최종품질제약하의 병합공정을 갖는 생산라인의 최소비용 모형 (A Minimum Cost Model for Merging Production Process with Final Product Quality Constraints)

  • 이경록;박명규
    • 대한안전경영과학회지
    • /
    • 제5권4호
    • /
    • pp.169-185
    • /
    • 2003
  • Recently many researchers contributed to the understanding of Quality Control System, but the use of economics in the design of quality assurance system is limited in treatment of the relationship between the average incoming quality level (or average process quality level) of the incoming lot and the average outgoing quality level of this lot. In this study, a traditional concept of sampling inspection plan for the quality assurance system is extended to a consideration of economic aspects in total production system by representing and analyzing the effects between proceeding and succeeding production process including inspection process. This approach recognizes that the decision at each manufacturing process (or assembly process), is to be determined not only by the cost and the average outgoing quality level of that process, but also by the input parameters of the cost and the incoming quality to the succeeding process. By analyzing the effects of the average incoming and outgoing quality, manufacturing or assembly process quality level and sampling inspection plan on the production system, mathematical models and solution technique to minimize the total production cost for a general product manufacturing system with specified average outgoing quality limit are suggested.

CTI를 이용한 콜센터 시스템 개발 : 대리운전 시스템 (Development of a Call Center System using CTI : A Proxy Driving System)

  • 박상성;정원교;신영근;장동식
    • 산업공학
    • /
    • 제20권3호
    • /
    • pp.309-314
    • /
    • 2007
  • By an explosive increase of proxy driving, customers require the quick and correct services of call center. But because most call centers have an unsystematic management system, grievance of customers is continually increasing. To solve these problem, we constructed a call center system of proxy driving that is based on CTI (Computer Telephony Integration) in this paper. The proposed system is constructed using CID (Caller Identify Display) terminal, SMS (Short Message Service) and call center management program etc. Customer service level could be improved through efficient customer management by using the proposed system. Also it could be convenient and easy to implement customer management, order management, staff management, SMS and settlement of accounts.

건설공사 주체별의 품질관리제도 인식수준에 관한 연구 (A Study on the Perception Level of Quality Management System by Construction Subject )

  • 김성덕;조아영;이정석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.253-254
    • /
    • 2023
  • We this study investiged the level of perception such as construction quality-related systems according to the subject of construction work. The results of the recognition moisture survey showed a high response rate in the order of construction companies and supervisors. The result of the system's level of understanding was low at 3.6 points for the orderer and contractor. In addition, in recognition of the effectiveness of the quality management system, the contractor showed a somewhat negative perception than other targets.

  • PDF

수주생산에서의 설계정보 관리를 위한 부품분류와 코딩 (A Classification and Coding System for the Design Information Management in Make-to-Order Manufacturing)

  • 이규용;김재균;문치웅
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1998년도 추계학술대회 논문집
    • /
    • pp.166-170
    • /
    • 1998
  • Classification and Coding(C&C) systems as a core of design information management have been accomplished by many studies in terms of design and manufacturing attribute based on Group Technology. Those are very difficult to apply in make-to-order(MTO) manufacturing because the environment of MTO has various characteristics of product, many licensors, engineering change, insufficiency of integrated management system for codes and so on. This paper presents a suitable C&C system to MTO manufacturing which consider management level and drawing.

  • PDF

제품인도기간에 함수인 확률적 주문수준 재고정책에 관한 연구 (Stochastic Order Level Inventory System with Dependent Lead Times)

  • 김영민
    • 품질경영학회지
    • /
    • 제14권1호
    • /
    • pp.33-38
    • /
    • 1986
  • This paper deals with probabilistic order level inventory system which the quantity ordered at the end of the scheduling period is dependent on lead times. To find an optimal solution, pearson system of distributions is used to approximate the probability density function of the on-order quantity. An example is solved and sensitivity analysis is performed to examine the relation between lead times and the ordering quantity.

  • PDF

레벨횡단법의 확장에 대한 소고 (An Extension of the Level Crossing Technique)

  • 채경철;이승원
    • 한국경영과학회지
    • /
    • 제29권3호
    • /
    • pp.1-7
    • /
    • 2004
  • We demonstrate in this paper that the level crossing technique can be applied to such a system that not only the state vector is two-dimensional but Its two components are heterogeneous. As an example system, we use the GI-G/c/K queue whose state vector consists of the number of customers in the system and the total unfinished work.