• Title/Summary/Keyword: supply pipe

Search Result 387, Processing Time 0.039 seconds

Development of the Pipe Construction Robot for Rehabilitation Work Process of the Water Pipe Lines (상수도 배관의 갱생 공정을 위한 배관 건설 로봇 개발)

  • Jeong, Myeong-Su;Lee, Jaeyoul;Hong, Sung-Ho;Jang, Minwoo;Shin, Dongho;Hahm, Jehun;Seo, Kap-Ho;Seo, Jin-Ho
    • The Journal of Korea Robotics Society
    • /
    • v.16 no.3
    • /
    • pp.223-231
    • /
    • 2021
  • In this paper describes the research and development of a pipe robot for pipe rehabilitation construction of old water pipes. After the water supply pipe construction, the pipe is leaking, damaged, and aging due to corrosion. Eventually, resistance to the flow of water in lower supply efficiency and contaminated water such as rusty water, finally in various consumer complaints. In order to solve this problem, rehabilitation construction robot technology is required to secure the construction quality of pipe rehabilitation construction and restore the function of the initial construction period. The developed pipe rehabilitation construction robot required a hydraulic actuator for high traction and was equipped with a small hydraulic supply device. In addition, we have developed a hydraulic cylinder and a link system that supports the pipe inner diameter to develop a single pipe robot corresponding to 500 to 800mm pipe diameter. The analysis and experimental verification of the driving performance and unit function of the developed pipe reconstruction robot are explained, and the result of the integrated performance test of the pipe reconstruction robot at the water supply pipe network site is explained.

Hydraulic Adequacy of Connection Pipes in Water Supply Systems for Contingencies (비상시 용수공급을 위한 상수도 연계관로의 수리적 적정성 평가)

  • Han, Wanseob;Jung, Kwansoo;Kim, Juhwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.6
    • /
    • pp.679-687
    • /
    • 2013
  • Although stable and safe drinking water supply to the customers is a basic function of multi-regional water supply systems in Korea, most systems have their vulnerabilities in emergency time due to the branch-type. Application of connections from the other water supply system can provide a solutions for these tentative problems. This paper describes reduction planning of water supply accidents that can minimize a service interruption to customers in multi-regional water supply system by connecting pipe lines between local water supply systems in Mokpo city areas. The result of this study shows that Juam dam multi-regional water supply systems can cover all of the water shortage in southern parts of Jeonnam multi-regional water supply systems by transmitting water through connected pipes between local networks. This can be effective to supply water interactively in various contingencies, when a pipe line accident occurs in southern area of Jeonnam multi-regional water supply systems. On the contrary, southern area of Jeonnam multi-regional water supply systems can cover 99.5 %($62,500m^3/day$) of the water shortage of Juam dam multi-regional water supply systems when service interruptions caused by various pipe accidents occur in the system.

Improvement of Manufacturing Process for Fuel Oil Supply Pipe using Large Vessel (대형선박용 연료공급관 가공공정 개선)

  • Jeon, Eon-Chan;Han, Min-Sik;Kim, Nam-Hun;Min, Jung-Oh
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.9 no.5
    • /
    • pp.64-69
    • /
    • 2010
  • This study is the machining of fuel supply pipe used in large vessels. The fuel supply pipe of large vessels have effects to reduce engine exhaust because of common rail system and show excellent fuel efficiency so it is in the limelight as a vessel engine of next generation. At present, the shape of fuel supply pipe of common rail used for huge two-stroke & low-speed vessels is like a peanut hole so the second machining is necessary after the first machining. There is high error rate for machining and the materials waste caused by machining error is serious. Also, in this time the request for increasing the length of fuel supply pipe is suggested in the world market, it's judged that current methods will show higher error rate for machining. Therefore, the purpose of this study is to improve the machining process used originally. For that, the system controlling the process was developed as well as surface roughness and straightness which are evaluation items of fuel supply pipe were measured so that improved process can be observed in real time.

The Freezing Process of the Water Supply Pipe in an Exterior Wall (외벽측 급수관의 동결 과정에 관한 연구)

  • Kang, Han-Gi;Lee, Jae-Heon
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.11
    • /
    • pp.782-788
    • /
    • 2007
  • In this paper, the freezing process of the water supply pipe in the exterior wall of an apartment house was analyzed by numerical method. The thickness of the pipe insulation and the percentage of insulation damage were considered as parameters in this paper. In the cases of the 0%, 8% and 20% damaged of the 5mm thickness insulation, the freezing was completed after 13 hours, 10 hours and 7 hours respectively. And in cases of the 10mm thickness insulation, the freezing was completed after 18 hours, 10.5 hours and 8 hours respectively. As a result, it is predicted that the water freezing would occurred when the water supply pipe with 8% or 20% damaged insulation are installed in the exterior wall. However, the water freezing would not occurred when the water supply pipe with 10mm thickness insulation of 0% damage is installed in the exterior wall.

The Replacement Plans for Aged Public Water Supply Pipes in Apartment Buildings : Especially Apartment Buildings in Bucheon (공동주택의 노후 급수관 개선방안에 관한 연구 : 부천시 공동주택을 중심으로)

  • Lee, Yong-Hwa;Heo, Yong-Chul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.4
    • /
    • pp.228-232
    • /
    • 2015
  • The water supply galvanized steel pipes of apartment buildings in Bucheon city constructed with building permission before 1994 have many problems such as leaks, the water containing rust, and low water pressure due to corrosion. Therefore, this study aims to find a way to renew the water supply pipes under investigation through a survey. As a result, when replacing the galvanized steel pipe with the corrosion-resistant pipe, the water supply system should also be changed from the gravity tank system to the booster pump system and the hygienic water storage tank. It is necessary to redraft the long-term repair plan including the replacement of the water supply system. Also, it is necessary to save the allowance reserve according to the modified long-term repair plan.

Optimal Design of Irrigation Pipe Network with Multiple Sources

  • Lyu, Heui-Jeong;Ahn, Tae-Jin
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.39 no.2
    • /
    • pp.9-18
    • /
    • 1997
  • Abstract This paper presents a heuristic method for optimal design of water distribution system with multiple sources and potential links. In multiple source pipe network, supply rate at each source node affects the total cost of the system because supply rates are not uniquely determined. The Linear Minimum Cost Flow (LMCF) model may be used to a large scale pipe network with multiple sources to determine supply rate at each source node. In this study the heuristic method based on the LMCF is suggested to determine supply rate at each source node and then to optimize the given layout. The heuristic method in turn perturbs links in the longest path of the network to obtain the supply rates which make the optimal design of the pipe network. Once the best tree network is obtained, the frequency count of reconnecting links by considering link failure is in turn applied to form loop to enhance the reliability of the best tree network. A sample pipe network is employed to test the proposed method. The results show that the proposed method can yield a lower cost design than the LMCF alone and that the proposed method can be efficiently used to design irrigation systems or rural water distribution systems.

  • PDF

Research of Corrosion Growth Degree According in Liquid Environment of Waterworks and Sewer Piping Material (상·하수 배관재의 수 환경에서 부식진전도 연구)

  • Park, Kyeong-Dong;Ki, Woo-Tae;Yu, Hyeong-Ju;Kim, Dong-Uk
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.5 no.4
    • /
    • pp.33-40
    • /
    • 2006
  • The quality of the supply water which is supplied to consumer is not the thing of water after filtrating but the thing of water from faucet through pipe. As a result, heavy metals and microorganism, that is the major materials, which cause the distrust of the supply water is generated by supply process. Especially, the heavy metal is generated by the corrosion of waterworks. Besides, rupture by corrosion of pipe becomes the factor of supply water's pollution in waterworks and the factor of pollution of the soil and environment in drain pipe. Therefore, this research examined the weight reduction electric potential measure to measure the corrosion degree of piping materials after testing the corrosion of piping materials(Copper Pipe, Galvanized Steel Pipe, Stainless Steel Pipe) which is generally used at the moment in various corrosion environments(subterranean water, supply water, 3.5% NaCl, 3.5% $HNO_3$). And let me show basic design data about problem occurrence such as leakage water, rust water, inside and outside corrosion from this.

  • PDF

Evaluation Method of Plastic Pipe for High-Strength Water Supply (고강도 수도용 PVC관의 성능평가 연구)

  • Park, Jong-II;Lee, Chang Suck
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.30 no.1
    • /
    • pp.44-49
    • /
    • 2018
  • High-strength plastic water supply pipe evaluation method was evaluated in this study. Up to date, high strength water supply pipes that we install are mostly ductile cast iron pipes. Sometimes, a few PVC pipes are installed. Metal pipes have rust problem on the surface, causing serious damage to metal pipes and reducing the expected life span of water piping system. Nowadays, depending on technology development, some companies have improved properties of general PVC pipe performance with remarkable properties that exceed KS and ASTM standard. Here, we suggest a new method of performance evaluation for high-strength water plastic pipes.

Study on the Physical Characteristics of Water Supply Steel Pipe according to Temperature Change (수도용 강관의 온도변화에 따른 물리적 특성에 대한 연구)

  • Kim, Woo-young;Jang, Am
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.12
    • /
    • pp.733-740
    • /
    • 2017
  • 'The facilities standards of water supply' issued by the Ministry of Environment in 2004 indicates that expansion joints cannot be used in welding water supply steel pipes. However, their reason is not clear and it is difficult to confirm the stability of the steel pipe for a water supply pipeline. The purpose of this study is to determine whether or not an expansion joint is necessary to improve the stability of water supply in steel pipe through a displacement analysis of the pipework. The test results are as follows. Firstly, it was found that expansion and contraction of the water supply steel pipe (D 2,400 mm) occur repeatedly in 4 cycles per year, and the maximum expansion and contraction amount of the pipe is 13.03 mm in 1.24 km pipelines. Secondly, the thermal stress caused by expansion and contraction of the steel pipe is $13.7{\sim}36.1kgf/cm^2$ according to the burial depth (0~4 m). The main comparison factors to determine the stability of the steel pipe (STWW 400) were the allowable tensile strength and the fatigue limit, which were computed to be $4,100kgf/cm^2$ and $1,840kgf/cm^2$, respectively. Finally, the thermal stress of the steel pipe is very small compared to the allowable tensile stress and fatigue stress. Therefore, thermal stress does not affect the stability of the steel pipe, although the expansion and contraction of the steel pipe occurs by temperature changes. In conclusion, the study demonstrated that expansion joints are not required in water supply steel pipelines.

Hydartion Heat Control with Closed Loop Pipe Cooling System (냉각수 순환 형태의 파이프 쿨링 공법을 이용한 매스콘크리트 수화열 제어)

  • 박찬규;손상현;이승훈;장기욱;정재홍;김명식
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.403-408
    • /
    • 2001
  • In order to control hydration heat in mass concrete, pipe cooling method has been widely used. However, open pipe cooling system cannot be applied to the mass concrete structures when cooling water supply is difficult. To control hydration heat of high strength mass foundation, closed loop pipe cooling system was developed to solve the cooling water supply. This paper reports the performance result of hydration heat control with closed loop pipe cooling system.

  • PDF