1 |
K-water, Establishment of a plan for the stabilization project for the metropolitan and industrial water supply(2011).
|
2 |
Piping materials for drinking water from electric gazette of Republic of Korea (Announcement of the Ministry of Constructon, 1993-350), http://theme.archives.go.kr/next/gazette/viewGazetteDetail.do?gazetteEventId=0028297939&actionType=keyword, September(1993).
|
3 |
Yang, H. G., Measurement and Evaluation of Thermal Expansion Coefficient for Warpage analysis of Package Substrate, Transactions of the Korean Society of Mechanical Engineers-A38(10), pp. 1049-1056(2014).
|
4 |
Braja, M. D., Principles of Geotechnical Engineering, Fourth Edition, pp. 250-257(1998).
|
5 |
Korean Agency for Technology and Standards, Wrapped Steel Pipe for water supply KS D 3565, pp. 2-3(2014).
|
6 |
Lee, M. H., The friction force of surroundings of stake and computing of the friction coefficient, Korean society of civil engineers, pp. 428-431(1988).
|
7 |
Kishida, H. and Uesugi, M., Geotechnique, Tests of the interface between sand and steel in simple shear apparatus, 37(1), 45-52(1987).
DOI
|
8 |
Seo, S. G., "S-N curve introducing probabilistic measure of tiredness," The Korean Soc. Mechanical Eng. J. KSME., 49(12), 49-53(2009).
|
9 |
Korea water and wastewater works association, The standard of water supply installation, pp. 200-201(2004).
|