• Title/Summary/Keyword: supervision fee

Search Result 19, Processing Time 0.023 seconds

A Basic Study of the Construction Supervision Integration (건설감리 통합화를 위한 기초 연구)

  • Hwang, Eun-Kyoung;Kim, Soo-Am
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2006.11a
    • /
    • pp.223-226
    • /
    • 2006
  • Fields of domestic construction supervision are divided into architecture, electricity, information and communication and fire by the individual laws. Between each supervision are lack of relationship. So it bring about performance degradation, supervision fee increasing and dispute. The purpose of this basic research is to suggest the integration method of each supervision.

  • PDF

An Analysis of the Conditions for Construction Supervision Fee (책임감리 용역 대가의 실태 분석 연구)

  • Choi, Sun-Hee;Choi, Hye-Mi;Lee, Jae-Young;Kim, Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.283-288
    • /
    • 2007
  • As constructions are changing variously from the size and efficiency, the role of supervision services tend to reach beyond mere monitoring or supervision to prevent fraudulence, but tend to extend toward a system that manages all the stages of the construction industry. There are growing demand to improve government operated corporation systems to secure high quality public facilities, and reviews on construction supervision system and supervision services roles, function, responsibility and obligations have been the topics among advanced researchers. However, the circumstance is that researches on the construction supervision service compensation and supervision services assignment criteria that serve as basis of such construction supervision system improvement are insufficient, and for practical development of construction supervision system, researches on construction supervision service compensation and supervision services assignment criteria will need to precede. Hence, this research purports to propose improvement directions of construction supervision system by deducing problems through condition survey on the construction supervision services ordered by public organizations.

  • PDF

Improvement of estimating method for construction management service fee by case study (사례분석을 통한 건설사업관리 대가산정 방법 개선)

  • Lee, Ung-Kyun;Yoo, Wi-Sung;Kim, Dong-In;Kim, Tae-Hoon;Cha, Min-Soo;Cho, Hun-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.16-24
    • /
    • 2012
  • The objective of this paper is to suggest the improvement of estimating system for construction management (CM) service fee through the analysis of the previous literatures and criteria and case study. In order to do this, this paper considered the relevance of existing criteria to estimate the CM service fee, the condition of input ratio of engineering resources in the real cases, and current utilization strategy of nonresident technical engineers. Based on the analysis, the following problems were identified; a) the different estimating system for CM fee and construction supervision fee, b) impractical estimating system for the CM fee, and c) inappropriate allocation of human resources for CM. Consequently, this paper suggested the following 4 items for the improvement of the existing system; (1) modification of the current structure of CM fee calculation, (2) rationalization of current level of the CM fee which is required to be raised approximately 5.4 percent compared to design or supervision fee, (3) securement of elasticity of the input ratio of engineering resources from the inception phase, and (4) development of the utilization strategy of nonresident engineers based on the technical requirement of the jobsite. Thus, it is anticipated that this research would affect the compensation package of CM in order to make the estimation process of CM service fee more efficient and to revitalize CM as business.

A Criterion for Estimating Supervision Cost Considering the Change Factors by Construction Works (공사별 변동요인을 고려한 적정 감리대가의 산정기준 연구)

  • Lee, Bae Ho;Kang, Leen Seok;Lee, Yang Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.5
    • /
    • pp.1199-1208
    • /
    • 1994
  • In the country, supervision cost is being estimated by percentages of construction cost or cost plus a fixed fee without a reasonable standard. This type has no function for adjusting supervision cost according to variables, such as construction work complexity, extent of supervisory services, fluctuations in prices. In this study, an objective criterion to estimate supervision cost with improved supervisory services has been developed, in which adjusting functions as stated above should be properly considered. A comparative study of supervisory service systems in foreign countries and a survey through questionnaire were carried out for the study. An objective criterion from the results is proposed in the form of an expression or table.

  • PDF

A Study on Standardization of Supervision Cost by Investigating Supervision Workload in Cultural Heritage Repair Works (문화재수리공사의 감리업무량 조사를 통한 감리대가 기준 마련 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.32-42
    • /
    • 2013
  • The Korean Government introduced a cultural heritage supervision system in January 2010 to control quality and to prevent poor construction. However, cultural heritage related constructions that require supervision, a scope of supervision, supervision cost and placement of supervisors have not been standardized yet. For this reason, standards of supervision for repair works of cultural heritage that reflect the characteristics of small-scale repair works and restoration of cultural heritage are required. Accordingly, this study has suggested standards of supervision works and cost by analyzing the average construction period that is suitable for the characteristics of cultural heritage repair works. In other words, this study has suggested standards of full-time supervision costs by applying the fixed amount-added method (adding direct labor cost, direct expenses, overhead expenses, engineering fee, charges for additional works and VAT) which is the same as the method of calculating supervision costs for public construction projects because a supervisor has to work full time at a construction site to perform supervision if the project is a mid/large-scale cultural heritage repair work. Also, this study has suggested standards of part-time supervision costs for a small-scale cultural heritage repair work and the ways of supervising the construction projects by visiting the project site on important occasions. According to the result of the analysis by applying the forgoing standards of supervision costs for cultural heritage, a full-time supervision cost for cultural heritage repair works is approximately 98% compared to the construction supervision of a public construction project, and a part-time supervision is approximately 158% compared to architectural construction supervision. It is expected that the valuable cultural heritage of Korea will be preserved by controlling quality of cultural heritage repair works through the application of this study result - the standards of supervision costs for cultural heritage repair works - to an actual project.

The Effect of PCAOB on Auditing Fee (외국회계감독기구의 등록이 감사보수에 미치는 영향)

  • Yoon, Min;Lee, Jin-Soo
    • Journal of Digital Convergence
    • /
    • v.14 no.12
    • /
    • pp.111-120
    • /
    • 2016
  • PCAOB conducts the direct supervision for the PCAOB registered accounting firm. Therefore, if an accounting firm is registered with the PCAOB, it will thoroughly manage for their quality management systems. The registered auditor can be expected to have better quality of the audit. This study carried out the analysis using the audit fee which proxies for audit quality. The results of analysis are as follows. After controlling for foreign accounting firms affiliated status, company size, risky assets, leverage, ROA, and market-related variables, PCAOB is a significant explanatory variable for the audit fees. The results of this study support the hypothesis that PCAOB-registered auditors will provide a good audit quality.

A Study on the Attitude Toward the Periodic Health Screening for Workers in Korea -Attitude of Personnels in Health Screening Institutions and Enterprises- (근로자 일반건강진단에 대한 태도 조사연구 -건강진단기관과 대상 사업체를 중심으로-)

  • Seo, Dong-Yoon;Song, Dong-Bin
    • Journal of Preventive Medicine and Public Health
    • /
    • v.20 no.2 s.22
    • /
    • pp.270-279
    • /
    • 1987
  • In all enterprises of Korea employing workers more than five, employeers have a duty of conducting a periodic health screening for improvement and maintaining healthful living and working conditions of employees. The health screening is performed annually in line workers and biennially in table workers under the supervision of the government. But there are some argument to the health screening programme in view of effectiveness, efficiency, reliability and etc. In order to obtain basic reference materials for increasing the efficiency of peridoic health screening programme for workers and understand the attitude of health screening institutions and enterprises toward the periodic health screening, mail questionnaire survey was conducted in July 1987. The questionnaire sent to 950 health screening institutions. and 700 enterprises in whole land but they were returned from 254 health istitutions and 187 enterprises, which were analyzed. The results were as follows: 1) The attitude of the respondents toward the necessity and benefit of the periodic health screening was showed highly positive responses in both of screening institutions and enterprises, and it was more positive in screening institutions. The attitude toward the affirmative and the contentment was showed less positive than that of the necessity and benefit. 2) The respondent recognized may problems on regard to the screening programme. The health screening institutions lie in the state of competition with other institutions for undertaking the screening programme. 3) One of major complaints from enterprises was the lack of sincerity in performing the screening programme. They wanted more practical and reliable health screening examination rather than showy one. 4) Health screening institutions and enterprises showed some mutual contradictions in the matter of screening fee, and so the screening fee should be adjusted to the appropriate cost.

  • PDF

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.

  • PDF

Process Improvements for Reducing Apartment Defects after Completion (준공후 아파트 하자 저감을 위한 절차개선 방안 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.355-361
    • /
    • 2018
  • Many defects are occurring in apartments, the main residential area in Korea. This is due to a lack of construction skills and a lack of management. As many apartments are provided to buyers, the dispute over defects after completion is increasing rapidly. The Housing Act was amended so that local governments could order contractors to repair defects. However, even if defects are resolved after a defect is generated, it is not a fundamental solution that can be satisfied because buyers have to endure the pain caused by the defect. So, it is necessary to protect the interests of buyers by fundamentally reducing defects in apartments. Therefore, in this study, it was suggested that the asymmetry of the information about the apartment buyers should be resolved at the time of sale of the apartment, the final drawings should be a contract document, the review period of the apartment house supervision should be secured, the appropriate supervisory fee should be secured at the time of contract change and the payment procedure should be improved.

A Study on the Improvement of Engineering and Construction Supervision Guarantee System in Korea (국내 설계.감리 등 용역보증제도 현황 및 개선방안 연구)

  • Lee, Yong-Hee;Choi, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.53-61
    • /
    • 2011
  • After several collapse accidents of large structures in the early 1990s in Korea, the government enacted a law that architectural, engineering and construction firms are obliged to have insurance for projects over a certain size. Particularly, with regard to insurance in design and construction supervision works (i.e. engineering insurance), although several operation-based problems were pointed out from practitioners, still little research has been done on analyzing current regnlartory and operational state and suggesting policy alternatives. Hence, this study applies Delphi technique to solicit current operational problems and propose a series of improvements on engineering insurance based on interview surveys targeting major market participants: municipalities, engineering firms, and insurance companies. Key findings culminate in adopting guarantee limits based on credit evaluation, abrogating joint surety, covering a loss of life, increasing insurance entrance fee, extending time covered, and etc. Reaching a consensus on the proposed alternatives between the market participants will form the foundation for sound developments of construction design and engineering industry.