• Title/Summary/Keyword: sub-standard construction

Search Result 108, Processing Time 0.03 seconds

A Proposal of Life Cycle CO2 Assessment Techniques for Building in Construction Stage by BIM LOD (건설단계 BIM을 이용한 건축물의 전 과정 CO2 평가 기법 제안에 관한 연구)

  • Bang, Jun-Sik;Tae, Sung-Ho;Roh, Seung-Jun;Keum, Won-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.53-54
    • /
    • 2012
  • This study is aimed at utilizing LCA processor with BIM LOD, eliciting the problems of the existing environmental assessment by constructing the database for environmental values of green buildings. For these objects, environmental load database of BIM construction material and evaluation process are presented, after matching BIM family based environmental load database which is available during evaluation stage, input-output tables and Korea LCI database to standard item code of public procurement service. It is a important factor in environmental assessment of building to develop database unit of standard item code for BIM and construction material. Thus, the results of this study are expected to provide basic data for improving effectiveness of construction through BIM based environmental load evaluation database. Furthermore, the provided environmental load database unit for construction material is considered to be available as basic information for BIM study by suggesting a processor connecting BIM with LCA and along with this, continuous examination on the connection process is needed.

  • PDF

Template database development for evaluation of CO2 emissions from building using BIM (건축물 CO2 배출량 평가를 위한 BIM Template DB 구축에 관한 연구)

  • Bang, Jun-Sik;Tae, Sung-Ho;Keum, Won-Seok;Kim, Tae-Hyoung;Roh, Seung-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.147-148
    • /
    • 2012
  • With the rise of BIM application and green building assessment, studies on assessment of CO2 emissions from buildings using BIM are needed. In accordance with the requirements, this study aims at developing BIM Template database, as a part of development of CO2 assessment technology using BIM. Based on the research of construction materials, this study develops database by applying Procurement Agency Item Code to BIM Template. The results of this research makes it possible to assess CO2 emissions of materials with BIM Template and building data modeling implementation.

  • PDF

The Analysis CO2 Emission and Economic Efficiency of High-rise Apartment Houses (초고층 공동주택의 CO2 배출량과 경제성 분석에 관한 연구)

  • Roh, Seung-Jun;Tae, Sung-Ho;Kim, Tae-Hyoung;Keum, Won-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.47-48
    • /
    • 2012
  • In this study, the CO2 emission and economic efficiency of high-rise apartment houses were evaluated, and were analyzed as a way to establish database on the evaluation of environment-friendliness of high-rise buildings. To that end, standard of buildings to be evaluated were proposed through analysis of the designing guideline for high-rise apartment houses proposed by Seoul city, and CO2 emission of the subject buildings were evaluated based on the characteristics of materials admitted into each building and the amounts of energy consumed during lifecycle period. In addition, the initial costs in construction stage and annual costs in operation stage were set as analysis parameters, and along with calculation of direct cost by the consumption of construction materials and energy, the costs of CO2 emission were evaluated and analyzed. As a result, the CO2 emission and economic efficiencies of high-rise apartment houses by construction stage and operation stage could be analyzed quantitatively.

  • PDF

Deriving Key Risk Sub-Clauses of FIDIC Conditions of Standard Subcontract -Based on FIDIC Conditions of Subcontract for Construction, edition 2011- (FIDIC 표준하도급 계약조건 핵심 리스크 세부조항 도출)

  • Hong, Seong Yeoll;Jei, Jae Yong;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.3
    • /
    • pp.439-448
    • /
    • 2022
  • Recently, domestic small and medium-sized subcontractors participating in the overseas construction market are suffering from the continuous loss and damage due to the insufficient recognition of the importance of risk Sub-Clauses among conditions of subcontracts. Therefore, the need to derive risk Sub-Clauses for conditions of the subcontract has been raised, but until now, previous studies have been conducted focusing on deriving risk Sub-Clauses for standard conditions of contract for construction between the Employer and the Contractor. In this study, 52 risk Sub-Clauses were derived on the basis of the influence size of the Sub-Clauses through the Delphi technique targeting 94 Sub-Clauses of conditions of standard subcontract for construction edition 2011, issued by the International Federation of Consulting Engineers (FIDIC) and In addition, 33 key risk Sub-Clauses were finally derived through the PI Risk Matrix by Probability and Impact. The results of this study provide will useful information on key risk Sub-Clauses that need to be reviewed in advance to minimize contractual risks at the stage of bidding and signing contracts for overseas subcontract construction projects.

A comparative analysis of the simulation results of total window thermal transmittance(Uw) according to the evaluation method - Focused on comparison of the single window simulation results - (창세트 전체 열관류율(Uw) 평가 방법에 따른 시뮬레이션 결과 비교 분석 - 단창 창세트에 대한 시뮬레이션 결과 비교를 중심으로 -)

  • Lee, Yong-jun;Oh, Eun-joo;Kim, Sa-kyum;Choi, Hyun-jung;Kim, Yu-min
    • KIEAE Journal
    • /
    • v.16 no.3
    • /
    • pp.77-82
    • /
    • 2016
  • Purpose: The aim of this study is to calculate U-factor of the window using international standard methods and compare quantitative and tendency difference focused on ISO standard 15099 and ISO standard 10077. And the result of ISO standard calculation methods is verified using thermal performance experiment to evaluate applicability of domestic certification system. This study is utilized a basis for activation of domestic window certification system. Method: First, 16 cases are selected that is combined a variety of frame, Glazing, spacer, etc. The selected cases were simulated using WINDOW&THERM based on ISO 15099 and 10077 calculation method. Second, experiment was conducted based on Korean standard condition. Then, it was compared the error of experiment and simulation results. Through this process, ISO 15099 and 10077 calculation methods were evaluated accuracy and utilization. Result: The results show that the difference of ISO 15099 and ISO 10077-2 is maximum 5.4%. The results of comparing U-factor errors based on the Korea standard experiment test found 2.4%. Consequently, it will be possible to combination calculation methods of ISO 15099 and ISO 10077 for a single window.

Process of Cost Estimation in Feasibility Analysis Considering ratio of Renewable Portfolio Standard (신·재생에너지 공급의무화제도(RPS) 비율을 고려한 타당성 분석의 공사비 산정 프로세스)

  • Yang, Hyun-Ju;Kim, Jong-Hyeob;Han, Sangwon;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.44-45
    • /
    • 2014
  • Recently the Korean government also has strictly restricted a law such as GBCC(Green Building Certification Criteria)and RPS(Renewable Portfolio Standard) on the construction. Especially the government announced a obligation of renewable energy consumption over 12% for all the public buildings of total area over 1,000㎡ since 2014. Regarding to the policy, this study presented the economics of energy analysis of the public office buildings that supplies 12% renewable energy output in the early stage of construction project. This paper calculated on CO2 emission by the geothermal, solar heat, and solar photovoltaic system and estimated the saving cost. Reduced cost through the energy saving are predicted to influence on the total construction cost. As a result air pollution and energy saving cost are expected that renewable energy system would be saving total initial cost of construction on planning phase.

  • PDF

PROCESS OF COMMUNITY-BASED SUSTAINABLE CO2 MANAGEMENT

  • Jaehyun Park;Taehoon Hong
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.262-268
    • /
    • 2011
  • According to the United Nations Framework Convention on Climate Change (UNFCCC), many countries around the world have been concerned with reducing Greenhouse Gas (GHG) emissions. Reducing the level of building energy consumption is particularly important in bringing GHG down. Because of this, many countries including the US and the EU are enforcing energy-related policies. However, these policies are focused on management of single types of buildings such as public buildings and office buildings, instead of management on a national level. Thus, although various policies have been enforced in many countries, CO2 management on a national level is still not an area of focus. Therefore, this study proposed a community-based CO2 management process that allows government-led GHG management. The minimum unit of the community in this study is a plot, and the process consists of three steps. First, the current condition of the GHG emission was identified by plot. Second, based on the identified results, the GHG emission reduction target was distributed per plot by reflecting the weighted value according to (i) the target CO2 reduction in the buildings in the standard year, (ii) region, and (iii) building usage and size. Finally, to achieve the allocated target reduction, building energy management was executed according to the properties of the building located on each plot. It can be expected that the proposed community-based CO2 management process will enable government-level GHG management, through which environment-friendly building construction can be promoted.

  • PDF

Novel construction of quasi-cyclic low-density parity-check codes with variable code rates for cloud data storage systems

  • Vairaperumal Bhuvaneshwari;Chandrapragasam Tharini
    • ETRI Journal
    • /
    • v.45 no.3
    • /
    • pp.404-417
    • /
    • 2023
  • This paper proposed a novel method for constructing quasi-cyclic low-density parity-check (QC-LDPC) codes of medium to high code rates that can be applied in cloud data storage systems, requiring better error correction capabilities. The novelty of this method lies in the construction of sparse base matrices, using a girth greater than 4 that can then be expanded with a lift factor to produce high code rate QC-LDPC codes. Investigations revealed that the proposed large-sized QC-LDPC codes with high code rates displayed low encoding complexities and provided a low bit error rate (BER) of 10-10 at 3.5 dB Eb/N0 than conventional LDPC codes, which showed a BER of 10-7 at 3 dB Eb/N0. Subsequently, implementation of the proposed QC-LDPC code in a softwaredefined radio, using the NI USRP 2920 hardware platform, was conducted. As a result, a BER of 10-6 at 4.2 dB Eb/N0 was achieved. Then, the performance of the proposed codes based on their encoding-decoding speeds and storage overhead was investigated when applied to a cloud data storage (GCP). Our results revealed that the proposed codes required much less time for encoding and decoding (of data files having a 10 MB size) and produced less storage overhead than the conventional LDPC and Reed-Solomon codes.

A Comparative Study on the Nominated Subcontractor (NSC) System of Building Construction Project in Asian Commonwealth of Nations - Focused on the NSC Clause Analysis of Standard Contract Forms - (아시아 지역 영연방국가의 지정하도급(NSC)제도에 관한 비교 연구 - 표준계약약관의 지정하도급자 항목분석을 중심으로 -)

  • Cho, Jaeyong;Kim, Junggon;Park, Hyeonggeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.12-22
    • /
    • 2014
  • In recent, many Korean contractors have tried to extend their business area into the overseas construction market, mainly as a result of a reduction in their domestic construction market. However in terms of risk, overseas construction projects are likely to face a number of unpredictable problems, many of which occur as a result of differences in contract cultures and construction environments between Korea and other countries. One key issue facing overseas construction projects in particular, is that of sub-contracting and control, and the way in which many countries of Commonwealth of Nations operate a unique subcontracting method well known as a nominated sub-contractor(NSC). This paper introduces the NSC system and differences as comparing among standard construction contract forms, such as JCT, SIA, HKIA and PAM. in UK and Asian Commonwealth of Nations. Also, we attempt to classify the type of the NSC system through the consideration of NSC clauses in accordance with the objection and termination of NSC contracting respectively.

Mianorm-based Logics with right and left n-potency axioms (좌 우, n-멱등 공리를 갖는 미아놈 논리)

  • Yang, Eunsuk
    • Korean Journal of Logic
    • /
    • v.23 no.1
    • /
    • pp.1-23
    • /
    • 2020
  • This paper deals with mianorm-based logics with right and left n-potency axioms and their fixpointed involutive extensions. For this, first, right and left n-potent logic systems based on mianorms, their corresponding algebraic structures, and their algebraic completeness results are discussed. Next, completeness with respect to algebras whose lattice reduct is [0, 1], known as standard completeness, is established for these systems via Yang's construction in the style of Jenei-Montagna. Finally, further standard completeness results are introduced for their fixpointed involutive extensions.