KSCE Journal of Civil and Environmental Engineering Research
/
v.32
no.5D
/
pp.463-472
/
2012
Exemplary contracts of construction management (CM) including highway projects have been carried out in the civil engineering area over the past ten years. However, practical and administrative challenges as transitional circumstances have been revealed in the different participants of supervision, inspection and construction management. Thus, it is important to internally overcome problems and negative perception encountered in civil engineering, and to promote the efficiencies in construction cost and quality. In addition, external efforts should be put to market opening, globalization, and technology development for competitiveness and high value industry. While it is critical to establish the concrete CM system by collaborating with various participants, proven architecture and system have not been provided because of incorrect measurement of CM accomplishment, overlap of responsibility between CM and supervision, and slow deployment in construction field. This paper analyzed the current CM practices and business environments, and presented the possible solutions for strategy improvement of CM in the owner's view point.
Korean Journal of Construction Engineering and Management
/
v.13
no.4
/
pp.16-24
/
2012
The objective of this paper is to suggest the improvement of estimating system for construction management (CM) service fee through the analysis of the previous literatures and criteria and case study. In order to do this, this paper considered the relevance of existing criteria to estimate the CM service fee, the condition of input ratio of engineering resources in the real cases, and current utilization strategy of nonresident technical engineers. Based on the analysis, the following problems were identified; a) the different estimating system for CM fee and construction supervision fee, b) impractical estimating system for the CM fee, and c) inappropriate allocation of human resources for CM. Consequently, this paper suggested the following 4 items for the improvement of the existing system; (1) modification of the current structure of CM fee calculation, (2) rationalization of current level of the CM fee which is required to be raised approximately 5.4 percent compared to design or supervision fee, (3) securement of elasticity of the input ratio of engineering resources from the inception phase, and (4) development of the utilization strategy of nonresident engineers based on the technical requirement of the jobsite. Thus, it is anticipated that this research would affect the compensation package of CM in order to make the estimation process of CM service fee more efficient and to revitalize CM as business.
Kim, Dongsu;Kwon, Soo Hyun;Chung, Seol Hee;Ahn, Bo Ryung;Lim, Byungmook
Journal of Society of Preventive Korean Medicine
/
v.20
no.2
/
pp.27-38
/
2016
Backgrounds : Taiwan has similar national health insurance (NHI) system for traditional medicine with South Korea. Recently, new quality improvement policies for traditional medicine is being attempted in Taiwan. Objectives : This study aimed to review the Taiwanese NHI system for Chinese Medicine (CM) and introduce quality improvement policies. Methods : Research articles, reports, government publications and year books which handled traditional medicine system and NHI system in Taiwan were searched and collected. The authors analyzed and summarized the contents in a qualitative manner. Results : In Taiwanese NHI system, CM procedures and medication for outpatients are reimbursed through a mix of fee-for-service and global budget payment system. CM shares 4% of total expenditure of NHI in Taiwan. Mostly, the expenses for procedures are reimbursed regardless of disease type, however, in the specialized program for quality improvement, CM doctors have to comply with standard operating procedures (SOPs). Conclusions : Taiwanese NHI system implemented SOP-based new reimbursement system for CM. Yet, the scientific evidences for SOPs are not sufficient, it can be useful references when we develope disease related reimbursement system for Korean Medicine in South Korea.
Magazine of the Korean Society of Agricultural Engineers
/
v.45
no.4
/
pp.98-106
/
2003
In order to set up structural improvement strategy against meteorological disasters of the shading structures in ginseng fields, structural safety analyses as well as some case studies of structural damage patterns were carried out. According to the results of structural safety analysis, allowable safe snow depth for type B(wood frame with single span) was 25.9 cm, and those for type A(wood frame with multi span) and type C and D (steel frame with multi span) were 17.6 cm, 25.8 cm, and 20.0 cm respectively. So types of shading structures should be selected according to the regional design snow depth. An experiential example study on meteorological disasters indicated that a strong wind damage was experienced once every 20 years, and a heavy snow damage once every 9.5 years. The most serious disasters were caused by heavy snow and it was found that a half break and complete collapse of structures were experienced by about 70% of snow damage. In addition to maintenance, repair and reinforcement, it is also recommended that improved model of shading structures for ginseng cultivation should be developed as a long term countermeasures against meteorological disasters.
Korean Journal of Construction Engineering and Management
/
v.17
no.3
/
pp.23-31
/
2016
The domestic market of CM at Risk has not been activated yet. It was analyzed duo to the fact that construction owners didn't have confidence in CM at Risk, because of the concerns regarding CM firms reliability, service, specialty, system and feasibility. Therefore, this study analyzed the problems to find the reason for declines in orders through a business diagnosis based on the Business Model Canvas(BMC) and set up the direction of business model improvement with one on one expert interviews. Additionally, we suggested the sub-activities for the business model improvements of CM at Risk service that are divided into 9 building blocks. Through this method, we determined that we would need preceding innovation activities such as good communication with customers, reinforcement of subcontract and excellence in project operations to convert the successful practice and settlement of the CM business model based in BMC. It is expected that the business model suggested from this study would contribute to improvement of CM at Risk competition and the differentiation strategy when compared with other firms. Also, it would be used a basis data to develop CM at Risk business model in the future.
Proceedings of the Korean Institute of Building Construction Conference
/
2018.05a
/
pp.66-67
/
2018
Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.
Early results from a field trail of Agathis loranthifolia are reported from a progeny test of 100 open-pollinated families in west Java, Indonesia. The average of height and diameter at root collar (DRC) was 40.18 cm and 0.52 cm at age 15 months. Family survival rate ranged from 86.5% at age 10 months to 81.7% at age 15 months. Family means of 10 best and 10 poorest families for each trait indicated that there was a large difference of growth performances among individual families. For height and DRC growth, the poorest groups had averages of 33.98 cm and 0.43 mm while the averages of the best groups were 47.35 cm and 0.62 mm at age 15 months as a difference of 39.36% and 43.65%, respectively. Differences between the best group and the test population mean, which is the selection differential, were implying that genetic gain from selection for the improvement of height and DRC growth would be achieved. The family variances of DRC and height were relatively small compared to replicate and residual variances. Family heritabilities for both studied traits were fluctuated, and the genetic coefficients of variation for DRC and height at age of 15 months were 7.19% and 5.22%, respectively.
Purpose: To examine and compare the perioperative outcomes of laparoscopic adrenalectomy (LA) and to determine its efficacy in patients with nonfunctioning adrenal adenomas (NFA) and subclinical Cushing syndrome (SCS). Materials and Methods: We retrospectively analyzed the clinical data obtained from 79 consecutive patients who underwent LA for the treatment of either NFA (n=35) or SCS (n=44) between 2011 and 2016. All patients had undergone computed tomography, as well as endocrinological tests to confirm the diagnosis prior to the adrenalectomy. The primary endpoint was improved metabolic parameters relating to diabetes, hypertension, dyslipidemia, and obesity. Results: Patients with SCS compared to those with NFA showed a higher occurrence of diabetes (29.5% vs. 11.4%), hypertension (59.1% vs. 34.3%), and dyslipidemia (43.2% vs. 14.3%). Patients with SCS showed a smaller median tumor size compared to those with NFA (2.5 cm vs. 5 cm). No significant perioperative complications ${\geq}$ Clavien-Dindo classification grade III were observed in any patient (SCS or NFA group). In terms of their metabolic profile, patients with SCS showed a significant postoperative improvement in hypertension (50.0%), diabetes (53.9%), dyslipidemia (31.6%), and obesity (29.2%). However, patients with NFA showed a postoperative improvement only in dyslipidemia (40.0%) and obesity (4.8%). Conclusions: Owing to absence of significant perioperative complications and the marked postoperative improvement in metabolic impairment, LA is a useful treatment strategy in patients diagnosed with SCS. In contrast, LA was not observed to show beneficial effects in correcting/improving the metabolic profile in patients presenting with NFA.
Korean Journal of Construction Engineering and Management
/
v.14
no.2
/
pp.87-95
/
2013
The number of construction management firms has been increased as construction management delivery system has been active in Korean construction market. the capability of leading construction management professional, who is responsible for managing project administration, is important for commissioning construction management contracts. The quality of project proposal and the capability of leading construction management professional, which are assessed by the board of contract awarding committee, are the major contributors for commissioning the public construction management projects administered by the Korean public procurement service for contracting. Therefore, employing a very competent leading construction management professional is the critical strategy for awarding contract to the construction management firms' part. That is why the firms should secure a fixed number of leading construction management professional in a waiting list to proceed the contract commissioning process for expectant candidate projects, even if there is no project assignable to the leading construction management professionals. However, a measure that makes effectively use of the leading construction management professional in a waiting list has not been systematically implemented in the firms. In turn, the firm suffers considerable loss in a project personnel supply and demand plan. Expert opinions were obtained by the survey questionaries administered to top management of the construction management firms which are engaged in the construction management contracts for commissioning the public construction management projects administered by the Korean public procurement service either as principal or co-principal deliverer. This paper presents the findings obtained by investigating the actual employment state of the leading construction management professional in the waiting list and by analyzing the issues involved in mobilizing and demobilizing them. It contributes to implement a practical guide for searching effective solutions to the issues.
Purpose: This study demonstrated a postural alignment exercise as conservative management strategy for a woman with excessive thoracic kyphosis presenting decreased chest function, and reports its results. Methods: A 21-year-old woman with thoracic kyphosis presenting limited chest function. The exercise program underwent for 30 min in the intervention phase, which consisted of exercises to improve the strength of back extensor and to stretch anterior chest region. Outcome measures comprised the severity of thoracic kyphosis and chest function (vital capacity [VC], forced expiratory volume in a second [FEV1], and chest expansion length). Results: The thoracic kyphotic angle decreased by 23.6% ($9.38^{\circ}$) and 25.4% ($10.58^{\circ}$) in the intervention and follow-up phases respectively. Also, chest function was improved in the intervention (VC: 3.7% [$0.10{\ell}$], FEV1: 17.1% [$0.39{\ell}$], and chest expansion length: 17.1% [0.96 cm]), and the improvement was maintained during the follow-up phase (VC: 4.8% [$0.13{\ell}$], FEV1: 17.1% [$0.39{\ell}$], and chest expansion length: 64.3% [1.81 cm]). Conclusion: These findings suggest that the postural alignment exercise was favorable for improving chest function of a woman with thoracic kyphosis.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.