• Title/Summary/Keyword: steel wire

Search Result 612, Processing Time 0.026 seconds

Suggested Method for the Tunnel Instrumentation on the Lattice Girder from the Results of the Laboratory Test using Load Cells (로드셀 실내시험을 통한 터널 격자지보 계측 기법)

  • Kim, Hak-Joon;Park, Si-Hyun;Lee, Ki-Se
    • The Journal of Engineering Geology
    • /
    • v.19 no.3
    • /
    • pp.269-275
    • /
    • 2009
  • The use of lattice girder is increased at the tunnel site in Korea recently for the substitute of H-steel rib. However, field measurements at the lattice girder are rarely performed at the tunnel site and the method of the measurement is not well established. The use of the vibrating wire strain gauges used for the H-steel rib was proven to be not suitable for the strain measurements of the lattice girder according to the previous research. The credibility of the load cell was investigated using laboratory compression tests for load cells, specially manufactured for the lattice girder far this study, installed at the specimen of the lattice girder. The method of the tunnel instrumentation for the lattice girder using the load cell is given from the interpretation of the compression test results.

Safety Evalution of on the cable of Extra dosed bridges by fire (화재에 대한 Extra-dosed교 케이블의 안전성 평가)

  • Rhu, Bong-Jo;Song, Young-Sun;Park, Weon-Tae
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.5
    • /
    • pp.23-33
    • /
    • 2008
  • Extra dosed bridge among the Cabled-stayed bridges have been increasingly built in korea in recently. But such bridges were often damaged by fire due to car collison. In this study Extra dosed bridges among the cabled-supported bridges are selected to analysis model frequently to be designed and/or constructed in recent and furture in this study. COSMOS FloWorks 2007 software are used for Heat Transfer Analysis and Thermal Stress Analysis. The safety of wire, HDPE pipe and stainless steel pipe are investigated. In the case of the constant of the temperature of the heat source, the significant three variables for the analysis are selected for study : (1) the distance between the fire-proof bulk head and the heat source, (2) wind velocity, (3) the height of the end of Stainless steel pipe.

Applying the Ferrocement Concept in Construction of Concrete Beams Incorporating Reinforced Mortar Permanent Forms

  • Fahmy, Ezzat H.;Shaheen, Yousry B.I.;Abdelnaby, Ahmed Mahdy;Abou Zeid, Mohamed N.
    • International Journal of Concrete Structures and Materials
    • /
    • v.8 no.1
    • /
    • pp.83-97
    • /
    • 2014
  • This paper presents the results of an investigation aimed at developing reinforced concrete beams consisting of precast permanent U-shaped reinforced mortar forms filled with different types of core materials to be used as a viable alternative to the conventional reinforced concrete beam. To accomplish this objective, an experimental program was conducted and theoretical model was adopted. The experimental program comprised casting and testing of thirty beams of total dimensions $300{\times}150{\times}2,000mm$ consisting of permanent precast U-shaped reinforced mortar forms of thickness 25 mm filled with the core material. Three additional typical reinforced concrete beams of the same total dimensions were also cast to serve as control specimens. Two types of single-layer and double-layers steel meshes were used to reinforce the permanent U-shaped forms; namely welded wire mesh and X8 expanded steel mesh. Three types of core materials were investigated: conventional concrete, autoclaved aerated lightweight concrete brick, and recycled concrete. Two types of shear connections between the precast permanent reinforced mortar form and the core material were investigated namely; adhesive bonding layer between the two surfaces, and mechanical shear connectors. The test specimens were tested as simple beams under three-point loadings on a span of 1,800 mm. The behavior of the beams incorporating the permanent forms was compared to that of the control beams. The experimental results showed that better crack resistance, high serviceability and ultimate loads, and good energy absorption could be achieved by using the proposed beams which verifies the validity of using the proposed system. The theoretical results compared well with the experimental ones.

Tuberculous Mediastinitis Developed After Surgical Treatment of Giant Chondrosarcoma on Chest Wall-one case report- (흉부 거대 연골육종의 외과적 치료후 발생한 결핵성 종격동염-1례 보고-)

  • 이재훈;양수호;김혁;정원상;김영학;이철범;강정호;지행옥
    • Journal of Chest Surgery
    • /
    • v.30 no.3
    • /
    • pp.348-348
    • /
    • 1997
  • A 48 year old man, has been suffering from a growing chondrosarcoma of sternum which has deeply invading the anterior mediastinum: He underwent wide resection of the chest wall tumor including a 4 cm free margin of normal tissue on all portions. The tumor as 15 × 16× 10cm in size arising from sternum and include both proximal one third of the clavicle and the 1 st, 2nd, and 3rd coital cartilages. The resected skeletal defect in the anterior wall was very large after wide resection of the'tumor and reconstructed due to paradoxical chest wall movement with sandwich like method of double over lapping Marlex mesh and methylmethacreylate, and steel wires. The soft tissue reconstructive procedure was dont with myocutaneous flap transposition use of pectoralis muscle. But the patient go infected with tuberculosis in the mediastinum two months after the operation. We had removed all of previously inserted prosthetics and performed curettage and drainage. Recently we experienced a case with giant chondrosarcoma of the sternum associated with tuberculous mediastinitis. The patient had an uneventful postoperative course and was discharged with adjuvant treatment such as antituberculous medication for 1 year.

Tuberculous Mediastinitis Developed After Surgical Treatment of Giant Chondrosarcoma on Chest Wall -one case report (흉부 거대 연골육종의 외과적 치료후 발생한 결핵성 종격동염 -1례 보고)

  • 이재훈;양수호
    • Journal of Chest Surgery
    • /
    • v.30 no.3
    • /
    • pp.248-252
    • /
    • 1997
  • A 48 year old man, has been suffering from a growing chondrosarcoma of sternum which has deeply invading the anterior mediastinum: He underwent wide resection of the chest wall tumor including a 4 cm free margin of normal tissue on all portions. The tumor as 15 $\times$ 16$\times$ 10cm in size arising from sternum and include both proximal one third of the clavicle and the 1 st, 2nd, and 3rd coital cartilages. The resected skeletal defect in the anterior wall was very large after wide resection of the'tumor and reconstructed due to paradoxical chest wall movement with sandwich like method of double over lapping Marlex mesh and methylmethacreylate, and steel wires. The soft tissue reconstructive procedure was dont with myocutaneous flap transposition use of pectoralis muscle. But the patient go infected with tuberculosis in the mediastinum two months after the operation. We had removed all of previously inserted prosthetics and performed curettage and drainage. Recently we experienced a case with giant chondrosarcoma of the sternum associated with tuberculous mediastinitis. The patient had an uneventful postoperative course and was discharged with adjuvant treatment such as antituberculous medication for 1 year.

  • PDF

A new precast wall connection subjected to monotonic loading

  • Vaghei, Ramin;Hejazi, Farzad;Taheri, Hafez;Jaafar, Mohd Saleh;Ali, Abang Abdullah Abang
    • Computers and Concrete
    • /
    • v.17 no.1
    • /
    • pp.1-27
    • /
    • 2016
  • Final construction project cost is significantly determined by construction rate. The Industrialized Building System (IBS) was promoted to enhance the importance of prefabrication technology rather than conventional methods in construction. Ensuring the stability of a building constructed by using IBS is a challenging issue. Accordingly, the connections in a prefabricated building have a basic, natural, and essential role in providing the best continuity among the members of the building. Deficiencies of conventional precast connections were observed when precast buildings experience a large induced load, such as earthquakes and other disasters. Thus, researchers aim to determine the behavior of precast concrete structure with a specific type of connection. To clarify this problem, this study investigates the capacity behavior of precast concrete panel connections for industrial buildings with a new type of precast wall-to-wall connection (i.e., U-shaped steel channel connection). This capacity behavior is compared with the capacity behavior of precast concrete panel connections for industrial buildings that used a common approach (i.e., loop connection), which is subjected to monotonic loading as in-plane and out-of-plane loading by developing a finite element model. The principal stress distribution, deformation of concrete panels and welded wire mesh (BRC) reinforcements, plastic strain trend in the concrete panels and connections, and crack propagations are investigated for the aforementioned connection. Pushover analysis revealed that loop connections have significant defects in terms of strength for in-plane and out-of-plane loads at three translational degrees of freedom compared with the U-shaped steel channel connection.

Effect of utilizing pressurized ring beam system in modern rock TBM: I. Numerical study (현대식 Rock TBM에서 가압형 링빔의 효과 연구: I. 수치해석적 연구)

  • Kwak, Yun-Suk;Kang, Gi-Don;Kim, Do-Hoon;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.1
    • /
    • pp.55-77
    • /
    • 2012
  • A Modern Rock TBM is a tunnel excavation method combining the conventional tunnelling method with the mechanized tunnelling method. It is a hybrid system that excavates a tunnel with TBM and supports the ground by ring beam, wire mesh, rock bolt, shotcrete, i.e., conventional tunnelling method. In the Modern Rock TBM, a ring beam is similar to a steel rib in NATM in the way that uses H-beam. But using a ring beam is more effective than a steel rib because it is installed in a closed-circle. Therefore, improving the performance of the ring beam is a key factor for achieving tunnel stability. In this respect, this study introduces a pressurized ring beam that might be functioning more effectively by confining convergence during tunnel excavation. In order to verify the effect of the pressurized ring beam, a three-dimensional numerical analysis was conducted. The numerical analysis confirms an increase in the minimum principal stress and reduction in the plastic strain that triggers excessive displacement. The analysis result also indicates a decrease in the relative displacement occurring after installing the ring beam, and expansion in spacing between the ring beams.

Application of Electromagnetic Wave for Evaluating Necking Defects in Bored Piles (현장타설말뚝의 네킹 결함 평가를 위한 전자기파의 적용성 연구)

  • Lee, Jong-Sub;Song, Jung Wook;Yu, Jung-Doung
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.4
    • /
    • pp.27-35
    • /
    • 2018
  • The objective of this study is to demonstrate the suitability of electromagnetic waves for evaluating necking defects in bored piles using electromagnetic waves. Experiments are conducted with small-scaled defective model pile with diameter of 150 mm and length of 270 mm. Two necking defects are generated at the upper and lower positions on two different sides of the model pile, respectively. The other two necking defects are generated at the upper and lower positions on the same side of the model pile. Electrical wires are installed alongside the stainless steel wire of a steel cage to configure a two-conductor transmission line. A time-domain reflectometer is used to generate and defect electromagnetic waves. The experimental results show that electromagnetic waves are reflected at the necking defects and the end of the model pile. In addition, calculated defect locations are almost the same as actual defect locations. This study demonstrates that electromagnetic waves can be effective tool for evaluating necking defects in bored piles.

An Experimental Study on The Development of fly-ash Cement Mortal Permanent (플라이애쉬 시멘트 모르터를 사용한 비탈형 영구거푸집 개발에 관한 실험적연구)

  • 김형남;김우재;김성식;김영희;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.04a
    • /
    • pp.481-486
    • /
    • 1999
  • According to results of this research Fly-ash Cement permanent-form production was found to be possible by fly-ash mortal. The compress strength 350kg/$\textrm{cm}^2$, banding strength 120kg/$\textrm{cm}^2$ were possible material separting and bleeding by excessive W/C rate was decreased permanent-form made by polymer solved high price of polymer by fly-ash. Model material was made by result of first research. There were no minute-crack on beam form and out surface of form was very smooth, So filling degree seemed desirable length of form after steaming curing was maintained as expected. with these results production of form seemed possible. In the banding load test, fly-ash showed increase of maxim load 12% than RC. in the case of minute-crack, comparing with RC, fly-ash showed no crack at connect. at the first stage under continuing loading size of crack increased. These phenomena seemed to be based on contribution of stress of inner bars in permanent-form. in the test of defection, fly-ash shower about 10% beam load increase than RC. in the case of beam defection, RC showed sudden decrease of tolerance at maxim load and total breaking, but permanent-form showed breaking of bending maintaining defection with contribution of steel stress ($\Phi$6 wire-mash). There phenomenic seemed to be attributed to increase of surface and steel tolerance of form. According to construction explacemaion, it was guessed that each panel was constructed by conner-steels in form edge. so cohesiveness was small. on these bases. keeping width of horizontal band 30cm, form-panel of 20mm width was found to be of use. Permanent-form was found to be efficient in compressibleness, defection, safety and use of Fly-ash mortal.

  • PDF

Electron Discharge Machining (EDM) and Hole EDM of Cold Heat-treated Tool Steel Molds (STD11) by using Cu Electrodes (냉간 금형용 공구강의 Cu 전극을 이용한 방전 홀에 관한 연구)

  • Park, In-Soo;Lee, Eun-Ju;Kim, Hwa-Jeong;Wang, Deok-Hyun
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.17 no.4
    • /
    • pp.76-82
    • /
    • 2018
  • 3D formed Electrical Discharge Machining (EDM) and hole EDM were conducted for die and mold manufacturing with electrodes which were made by mechanical machining and wire EDM. It is difficult to machine the hardened material after heat treatment and quenching with traditional machining. The only method of machining hardened material is die-sinking EDM. In this research, hole EDM was conducted for heat-treated cold-worked tool steel (SKD11) for use as a die material. The EDM surfaces were analyzed by pulse-on time and peak current of EDM current, according to the machining conditions of EDM. The EDM surface profiles were affected by the peak current. The contribution of each factor is peak current (91.63%) and pulse-on time (0.93%). The best surface roughness was obtained with a $130{\mu}s$ pulse-on time and a 14.2 A peak current. With uniform EDM processing, the surface deteriorated with increasing pulse-on time and peak current. The thickness of the solidified layer induced by EDM was increased as the peak current, crater shapes, and erupted shapes of EDM surfaces were increased. Therefore, microcracking gaps induced by surface tension were increased.