Browse > Article

Suggested Method for the Tunnel Instrumentation on the Lattice Girder from the Results of the Laboratory Test using Load Cells  

Kim, Hak-Joon (Daejeon University, Dept. of Geotechnical Design Engineering)
Park, Si-Hyun (Korea Infrastructure Safety & Technology Corporation)
Lee, Ki-Se (Daejeon University, Dept. of Civil Engineering)
Publication Information
The Journal of Engineering Geology / v.19, no.3, 2009 , pp. 269-275 More about this Journal
Abstract
The use of lattice girder is increased at the tunnel site in Korea recently for the substitute of H-steel rib. However, field measurements at the lattice girder are rarely performed at the tunnel site and the method of the measurement is not well established. The use of the vibrating wire strain gauges used for the H-steel rib was proven to be not suitable for the strain measurements of the lattice girder according to the previous research. The credibility of the load cell was investigated using laboratory compression tests for load cells, specially manufactured for the lattice girder far this study, installed at the specimen of the lattice girder. The method of the tunnel instrumentation for the lattice girder using the load cell is given from the interpretation of the compression test results.
Keywords
lattice girder; load cell; tunnel instrumentation;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 김학준, 진수환, 박시현, 2008, 격자지보와 숏크리트 계측에 대한 현장실험 연구, 지질공학, 대한지질공학회논문집, 18(1), 93-102