• Title/Summary/Keyword: start date

Search Result 83, Processing Time 0.03 seconds

Pilot Study on Variation of Menstruating Women's Pulse Energy in Left and Right Chon, Kwan, Cheok (월경기 여성의 맥파 변화에 대한 예비 연구)

  • Lee, Ji-Yeon;Yoo, Jeong-Eun;Yun, Young-Jin
    • The Journal of Korean Obstetrics and Gynecology
    • /
    • v.26 no.4
    • /
    • pp.140-149
    • /
    • 2013
  • Purpose: The purpose of this study is to investigate the change and correlation of pulse energy in Left and Right Chon, Kwan, Cheok during menstruation, especially around menstruation start date. Methods: The subjects of this experiment were 8 healthy women whose menstruation periods are regular. We measured 3D Blood Pressure Pulse Analyzer (3D-MAC) tests before and after menstruation start date. Results: The results were as follows 1. The pulse energy of the Right Chon was significantly decreased and Left Kwan was comparatively increased during the next day of menstruation start date than previous day. 2. There was a negative correlation between Left Kwan and Left Cheok, Right Chon and Right Kwan pulse energy during the previous and menstruation start date. The negative correlation disappeared between Right Chon and Right Kwan at the next day of menstruation start date. Conclusions: The results suggest that Chon, Kwan, Cheok pulse energy changes are related to menstruation and reflect physiological mechanism of menstruating women. Further study will be needed.

Relationship between airborne pollen concentrations and meteorological parameters in Ulsan, Korea

  • Jung, In-Yong;Choi, Kee-Ryong
    • Journal of Ecology and Environment
    • /
    • v.36 no.1
    • /
    • pp.65-71
    • /
    • 2013
  • The concentration of airborne pollen is related to meteorological parameters. The main purpose of this study was to determine the correlation between airborne pollen and meteorological parameters in Ulsan based on sampling from 2010 to 2011. The primary factors of interest were differences in the pollen scattering start date, end date, and peak date, and the fluctuations in pollen concentration. The meteorological parameters that affected the start and peak dates of the pollen season were as follows. For Pinus and Alnus, the dates were correlated with sunshine and an increase in temperature, whereas for Quercus, the dates were correlated with increasing temperature. During the pollen season, Alnus peaked when the temperature was highest and Pinus peaked when the relative humidity was lowest. The concentration of airborne pollen was correlated with meteorological parameters during the sampling period as follows: Pinus, Alnus, and Humulus pollen concentrations were positively correlated with increasing temperature and negatively correlated with rainfall and relative humidity; Humulus pollen concentration was positively correlated with sunshine; and Quercus and Humulus pollen concentrations were positively correlated with wind speed.

A Study on the Investment Efficiency of BW Bond (신주인수권부사채의 투자효율성 연구)

  • Jung, Hee-Seog
    • Journal of Industrial Convergence
    • /
    • v.19 no.5
    • /
    • pp.21-34
    • /
    • 2021
  • The purpose of this study is to find out what the investment efficiency of BW is from an investor's point of view and to suggest an efficient investment plan to investors. The research method is to investigate the coupon interest rate, maturity interest rate, issuance date, right exercise start and end date, maturity date, exercise price, etc. for BW issued from 2014 to July 2021. By connecting them, it was attempted to quantitatively understand the efficiency of investment in BW and the effect of new stock acquisitions. As a result of the study, the ratio of the number of days in excess of the exercise price was 41.3% of the available days for new stocks, so it was analyzed that the investment efficiency of bonds with warrants was not high. The return on the exercise start date was 24.8% on average and the return on the end date was 52.6% on average, showing a positive return on average, so it was derived in line with investor expectations. The number of stocks with negative returns on the exercise start date was 1.47 times higher than the number of stocks with positive returns, and the number of stocks with negative returns on the end date was 1.16 times higher than the number of positive stocks.

Pricing Outside Barrier Options

  • Lee Hangsuck
    • Proceedings of the Korean Statistical Society Conference
    • /
    • 2004.11a
    • /
    • pp.165-170
    • /
    • 2004
  • This paper will derive explicit unified pricing formulas for eight types of outside barrier options, respectively. The monitoring periods of these options start at an arbitrary date and end at another arbitrary date before maturity. The eight types of barrier options are up-and-in, up-and-out, down-and-in and down-and-out call (or put) options.

  • PDF

Study on Growth and Flowering Characteristics in the Spring Sowing for Selection of Rapeseed (Brassica napus L.) Varieties (봄 파종에 적합한 유채(Brassica napus L.) 품종 선발을 위한 생육 및 개화특성에 관한 연구)

  • Kim, Kwang-Soo;Ha, Su-Ok;Lee, Yong-Hwa;Jang, Young-Seok;Choi, In-Hu
    • Korean Journal of Plant Resources
    • /
    • v.28 no.1
    • /
    • pp.111-118
    • /
    • 2015
  • The objective of this study was to determine the response of rapeseed (Brassica napus) to different planting date in the spring and varieties on growth and flowering characteristics. Eight rapeseed varieties were sowed at 10 day interval from 1st to 31th of March at Muan and Jeju in Korea. Significant planting dates and rapeseed varieties effects for growth, start of flowering and duration. As the planting date was being delayed, plant length and flower number were decreased, but branch number was increased. And, start of flowering date was retarded and flowering duration decreased with later planting date. Days from planting to flowering was shortened as seeding date was delayed and shortening degree was similar between experimental locations, Muan and Jeju. The days to flowering for rapeseed about 73~94 days for 1st March and then decreased to 57~71 days for the 31th March of planting date. 'Tammiyuchae' and 'Mokpo 111' seeded on each planting date come into blossom more earlier about 10 days as compared to 'Tamlayuchae' and 'Naehanyuchae'. The duration of flowering for the B. napus varieties was shortened as planting date was delayed. The results revealed that flowering characteristics of rapeseed can be greatly enhanced by planting as early as possible, and early flowering varieties i.e. 'Tammiyuchae' and 'Spring' were the most suitable varieties among the tested varieties for planting in the spring.

PRICING FLOATING-STRIKE LOOKBACK OPTIONS

  • Lee, Hang-Suck
    • Proceedings of the Korean Statistical Society Conference
    • /
    • 2005.11a
    • /
    • pp.153-158
    • /
    • 2005
  • A floating-strike lookback call option gives the holder the right to buy at the lowest price of the underlying asset. Similarly, a floating-strike lookback put option gives the holder the right to sell at the highest price. This paper will derive explicit pricing formulas for these floating-strike lookback options with flexible monitoring periods. The monitoring periods of these options start at an arbitrary date and end at another arbitrary date before maturity.

  • PDF

Study Due-date Promising system using CTP Algorithm in SCM Environment (공급망상에서 CTP 알고리즘을 이용한 납기확약 시스템에 관한 연구)

  • 박상민;남호기;최진;이종천
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.1
    • /
    • pp.97-108
    • /
    • 2004
  • This Study will introduce the concept of A TP(A vailable To Promise) and CTP(Capable to Promise) through the existing study, the process analysis of CTP, the modeling of algorithm and the embodiment of system. This research considers the environment of using Job-Shop method. The CTP algorithm models using LPST(Latest Possible Start Time) and EPST(Earliest Possible Start Time) method especially. It is important part of executing CTP systems. The CTP modeling and implementing develops to system which is capable to implement in the various business environment through additional and continuous research.

-CTP System Study for Customer Reliability Improvement through Due date Promising- (납기확약을 통해 고객 신뢰성 향상을 도모하기 위한 CTP 시스템에 관한 연구)

  • Oh Sung Hwan;Park Young Ki;Kang Kyong Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.3
    • /
    • pp.121-130
    • /
    • 2004
  • This Study will introduce the concept of CTP(Capable-to-Promise) Algorithm, CTP process, and the modeling of algorithm. This research is based on the environment of using Job-Shop method. CTP algorithm model use LPST(Latest Possible Start Time) and EPST(Earliest Possible Start Time) method especially. It is important part of executing CTP system. The CTP modeling and implementing develops to system which is able to implement in the various business environment through additional and continuous research.

Modeling Due-date Promising system using CTP Algorithm in SCM Environment (공급망상에세 CTP 알고리즘을 이용한 납기확약 시스템 모델링)

  • 최진;박상민;남호기;이종천
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.117-127
    • /
    • 2003
  • This Study will introduce the concept of ATP(Available To Promise) and CTP(Capable to Promise) through the existing study , the process analysis of CTP(Capable to Promise), the modeling of algorithm and the embodiment of system. This research considers the environment of using Job-Shop method. The CTP algorithm models espicially through using LPST(Latest Possible Start Time) and EPST(Earlist Possible Start Time) method. It is important part of executing CTP(Capable to Promise), The CTP(Capable to Promise) modeling and implementing system develops to system which is capable to implement in the various business environment through addational and continuous research.

  • PDF

A Progress-based Expert System for Quantitative Assessments of Project Delay

  • Yoo, Wi Sung
    • Architectural research
    • /
    • v.10 no.1
    • /
    • pp.41-48
    • /
    • 2008
  • Construction projects have frequently exceeded their schedule despite reliable estimates at the start of a project. This problem was attributed to unpredictable causes at the beginning and to shortage of proper tools to accurately predict project completion date. To supplement this difficulty, project managers need a comprehensive system that can be employed to monitor the progress of an ongoing project and to evaluate potential delay for achieving the goal on time. This paper proposed a progressive-based expert system for quantitative assessments of project delay at the early stages of the execution. Furthermore, the system is used to inspect the change of the uncertainty on completion date and its magnitude. The proposed expert system is helpful for furnishing project managers a warning signal as a project is going behind schedule and for tracking the changed uncertainty at a desired confidence level. The main objectives of this paper are to offer a new system to overcome the difficulties of conventional forecasting tools and to apply a construction project into the system to illustrate its effectiveness. This paper focuses on construction phase of project development and is intended for the use by project managers.