• Title/Summary/Keyword: standard of cost estimation

Search Result 220, Processing Time 0.022 seconds

Design of Navigation Filter for Underwater Glider (수중글라이더용 항법필터 설계)

  • Yoo, Tae Suk;Cha, Ae Ri;Park, Ho Gyu;Kim, Moon Hwan
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.26 no.12
    • /
    • pp.1890-1897
    • /
    • 2022
  • In this paper, we design a navigation filter for an underwater glider. Underwater gliders are low-cost, reusable, and can be used for a long time. Two types of filters are designed considering characteristics such as small size, low cost, and low power. The navigation filter estimates the reference velocity of the underwater glider's body frame based on the minimum sensor output. The sensor configuration of the first filter consists of an accelerometer, a magnetometer, and a depth sensor. the second filter include extra a gyroscope in the same configuration. The estimated velocity is fused with the attitude, converted into the velocity of the navigation frame and finally the position is estimated. To analyze the performance of the proposed filter, analysis was performed using Monte Carlo numerical analysis method, and the results were analyzed with standard deviation (1σ). Standard deviations of each filter's position error are 334.34m, 125.91m.

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

A Study on Improvement Methods of Cost Estimation in Order for the Proper Management of Street Trees (도시 가로수 관리 품셈 개선에 관한 연구)

  • Do, Yoon-Taek;Han, Bong-Ho;Park, Seok-Cheol
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.20-36
    • /
    • 2022
  • This study aims to provide basic data for high-quality street tree management by setting reasonable management items and appropriate unit prices by reviewing the adequacy of current street tree management. Currently, street tree management items, except for street tree pruning, use general landscape tree quantity per unit for the street tree management quantity per unit. KEPCO (Korea Electric Power Corporation) applied pruning items from standard electric production infrastructure and carried out the activities at an average unit price of 51% lower for heavy pruning and 39% lower for light pruning than the standard estimate. This was judged to be a level that could not maintain or increase the quality of street tree management. It was determined that an appropriate standard unit price for street tree management was necessary. To improve the quantity per unit for the proper management of street trees, it was necessary to review costs in the field. However, due to the absence of data on actual construction costs in the domestic landscape field, detailed items of the US RSMeans Building Construction Cost Data (RSMeans) were reviewed, and the actual construction costs were calculated by applying personal domestic expenses. As a result, the standard of the estimated unit showed a good ratio of 107% for heavy pruning of street tree pruning compared to the actual construction cost, but light pruning was underestimated with a 59% ratio. Shrub pruning was 82%, weeding was 92%, tree fertilization was 87%, and windbreak wall installation was 91% under-engineered. In addition, it was also confirmed that the watering by sprinkler trucks and chemical spraying were over-designed compared to the actual construction cost at the rates of 118% and 124%, respectively. Due to the specificity of the street trees, the increase in personal expenses and the input cost of equipment, such as road safety controls, were judged to be the main cause of the underestimation of items. Therefore, it is necessary to add items related to street trees and general landscape trees to the landscape maintenance items of the standard of the estimated unit.

A Study on the Work Crew Based for the Estimation from Construction Analysis of Cement Liquid Waterproofing in Apartment House (공동주택 시멘트 액체방수 공사의 현장분석을 통한 작업조 기반 품셈에 관한 연구)

  • Ha, Gee-Joo;Ha, Min-Su
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.121-128
    • /
    • 2010
  • This study aims to make improvements to the standard estimation process used to estimate reasonable costs for construction work, and to suggest a work crew based estimation using a new cost estimation model. In addition, work crew shift combination and construction process were systematically organized in order to improve the estimation technique and the construction capability of the cement liquid waterproofing work for apartment buildings. In addition, in terms of manpower and productivity, analyses were performed on the cement liquid waterproofing work for apartment buildings with net areas between $84-85m^2$ and $125-184m^2$, and the results were then compared with those calculated using the conventional work-crew based estimation method. Through this study, when the results of this study and those calculated by the conventional method were compared, for apartments with the net area of $84-85m^2$, the differences between specialists were shown to be 1.91 times to 2.13 times on average, while they were 8.82 times to 9.52 times between normal workers on average. For apartments with the net area of $125-184m^2$, the differences betweenspecialists were shownto be 1.89 times to 2.07 times on average, and 8.57 times to 9.38 times on average between normal workers.

Analysis of Medical Use and Treatment Costs of Hepatocellular Carcinoma Patients Using National Patient Sample Data (환자표본자료를 이용한 간세포암종 환자의 의료이용 특성 및 치료별 의료비용 분석)

  • Oh, Byeong-Chan;Cho, Jeong-Yeon;Kwon, Sun-Hong;Lee, Eui-Kyung;Kim, Hye-Lin
    • Korean Journal of Clinical Pharmacy
    • /
    • v.31 no.2
    • /
    • pp.153-159
    • /
    • 2021
  • Background: With increasing economic evaluation studies on the treatment of or screening tools for liver diseases that cause hepatocellular carcinoma (HCC), interest in the analysis of the medical utilization and costs of HCC treatment is increasing. Therefore, we aimed to estimate the medical utilization and costs of HCC patients, and calculate the cost of main procedures for HCC treatment, including liver transplant (LT), hepatic resection (HR), radiofrequency ablation (RFA), and transarterial chemoembolization (TACE). Methods: We analyzed claim data from January to December 2018 from the Health Insurance and Review and Assessment Service-National Patient Sample (HIRA-NPS-2018) dataset, including data of patients diagnosed with HCC (Korean Standard Classification of Diseases code C22.0) who had at least one inpatient claim for HCC. Results: A total of 715 HCC patients were identified. In 2018, the yearly average medical cost per HCC patient was ₩18,460K (thousand), of which ₩14,870K was attributed to HCC. Among the total medical costs of HCC patients, the inpatient cost accounted for the largest portion of both the total medical and HCC-related costs. The major procedures of HCC treatment occurred most frequently in the order of TACE, RFA, HR, and LT. The average medical cost per treatment episode was the highest for LT (₩87,280K), followed by HR (₩10,026K), TACE (₩4,047K), and RFA (₩2,927K). Conclusion: By identifying the medical costs of HCC patients and the costs of the main procedures of HCC treatment, our results provide basic information that could be utilized for cost estimation in liver disease-related economic evaluation studies.

A Study on Dam Exterior Inspection and Cost Standards using Drones (드론을 활용한 댐 외관조사 및 대가기준에 대한 연구)

  • Kim, Tae-Hoon;Lee, Jai-Ho;Kim, Do-Seon;Lee, Suk-Bae
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.3
    • /
    • pp.608-616
    • /
    • 2021
  • Purpose: Safety inspections by existing personnel have been limited in evaluation and data securing due to concerns about the safety of technicians or difficulty in accessing them, and are becoming a bigger problem as the number of maintenance targets increases due to the aging of facilities. As drone technology develops, it is possible to ensure the safety of personnel, secure visual data, and diagnose quickly, and use it is increasing as safety inspection of facilities by drones was introduced recently. In order to further enhance utilization, it is considered necessary to base a consideration standard for facility appearance investigation by drones, and in this paper, research was conducted on dams. Method: To calculate the quality, existing domestic safety inspection and drone-related consideration standards were investigated, and procedures related to safety inspection using drones were compared and analyzed to review work procedures and construction types. In addition, empirical data were collected through drone photography and elevation image production for the actual dam. Result: Work types for safety inspection of facilities using drones were derived, and empirical survey results were collected for two dams according to work types. The existing guidelines were applied for the adjustment ratios for each structural type and standard of the facility, and if a meteorological reference point survey was necessary, the unmanned aerial vehicle survey of the construction work standard was applied. Conclusion: The finer the GSD in appearance investigation using drones, the greater the number of photographs taken, and the concept of adjustment cost was applied as a correction to calculate the consideration standard. In addition, it was found that the problem of maximum GSD indicating limitations should be considered in order to maintain the safe distance.

Performance Improvement of a PMSM Sensorless Control Algorithm Using a Stator Resistance Error Compensator in the Low Speed Region

  • Park, Nung-Seo;Jang, Min-Ho;Lee, Jee-Sang;Hong, Keum-Shik;Kim, Jang-Mok
    • Journal of Power Electronics
    • /
    • v.10 no.5
    • /
    • pp.485-490
    • /
    • 2010
  • Sensorless control methods are generally used in motor control for home-appliances because of the material cost and manufactureing standard restrictions. The current model-based control algorithm is mainly used for PMSM sensorless control in the home-appliance industry. In this control method, the rotor position is estimated by using the d-axis and q-axis current errors between the real system and a motor model of the position estimator. As a result, the accuracy of the motor model parameters are critical in this control method. A mismatch of the PMSM parameters affects the speed and torque in low speed, steadystate responses. Rotor position errors are mainly caused by a mismatch of the stator resistance. In this paper, a stator resistance compensation algorithm is proposed to improve sensorless control performance. This algorithm is easy to implement and does not require a modification of the motor model or any special interruptions of the controller. The effectiveness of the proposed algorithm is verified through experimental results.

Rock/Soil proportion estimation using image processing technique (광학식 측정방법을 활용한 풍화지반 버럭의 암/토사 구성비율 추정방법)

  • Jin, Kyu-Nam;Jin, Kim-Young;Park, Sung-Wook;Cho, Gye-Choon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1425-1432
    • /
    • 2010
  • In large construction site, although soil conversion factor is so significant to preliminary design, operation design and calculating the cost of construction that it is important to take reasonable estimation and application, the standard of soil conversion factor for weathered ground doesn't clearly suggested yet. So in this study, at first we obtain the image using DSLR - high resolution camera and Laser scanner in the Haeng-Bok city constructin site, then analysis the ratio of soil and rock using various image processing method(Sobel method, Laplace method, Highpass filter, Hue and Saturation analysis). Mutual comparation with the result of image processing analysis and manual segmentation of 5case image in the cad. As a result, best image processing method was different for each case. In case of high propotion of rock, Laplace was best and in case of high propotion of soil, Highpass was best, and mixed case Laplace was best.

  • PDF

Study of CMM base Information Technology company level estimation (CMM 기반 정보기술 업체 수준평가에 관한 연구)

  • Kim Tai-Dal
    • Journal of Internet Computing and Services
    • /
    • v.5 no.1
    • /
    • pp.33-39
    • /
    • 2004
  • In this paper, so that government official in target extent of relevant shame capacitates CMM measuring achievement result by each process as quantitative because do standard, repeat and achieves gap analysis and estimation solidify knowledge management of information base enabling "Quality control, production management, cost control, integral management of knowledge", Solidify customer service through "high-quality, differentiation" of information. Establish administration and supervision item to reach 4 steps level in information ability measurement in formation to prove business efficiency through process optimization and improves formation maturity through voluntary effort of formation continuously. Suggested model who analyze and evaluates application in domestic SI specialty company.I specialty company.

  • PDF

Effects of Asset Diversification and Human Capital Efficiency on Bank Performance: Evidence from Asian Countries

  • BAWONO, Suryaning;SANUSI, Anwar;SUPRIADI, Bambang;TRIATMANTO, Boge;WIDARNI, Eny Lestari
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.10 no.1
    • /
    • pp.123-132
    • /
    • 2023
  • This study seeks to determine if the efficiency of bank human resources, as played by human capital, impacts the performance and diversification of banks. This study uses secondary data from data obtained from 385 commercial banks in 33 countries in Asia during the 2010-2020 period with the diversification analysis method. We use the Z-score to measure the amount of standard deviation that must be from earnings (ROAA). We examined it using the Tobit regression technique. According to the regression estimation results, human capital has a significant role in the performance and effective diversification of Asian banks. The human capital efficiency coefficient (HCE) is significantly negative with the cost-to-income ratio (CTIR) and significantly positive with Profitability, Financial Stability, and cost efficiency score. The level of efficiency of human resources has an effective role in increasing human capital which has an impact on bank diversification and performance. The development of human resources in a human capital framework plays an important role in the diversification and improvement of bank performance. Human capital has a significant role in the performance and effective diversification of Asian banks. The level of efficiency of human resources has an effective role in increasing human capital which has an impact on bank diversification and performance.