• 제목/요약/키워드: standard of cost estimation

검색결과 219건 처리시간 0.025초

소프트웨어 개발비 기준의 애플리케이션 유형과 품질 및 특성 보정요소 개선 (Improving the Application Type and Quality/Characteristics Adjustment Factors of the Korea Software Cost Estimation Standard)

  • 박찬규;김우제;서용원
    • 한국IT서비스학회지
    • /
    • 제8권2호
    • /
    • pp.43-70
    • /
    • 2009
  • As software development and maintenance cost increase quickly, information systems managers are more concerned about how to effectively manage software cost. To estimate the software development cost, most public institutes of Korea use the software cost estimation standard established by the government. Unfortunately, the accuracy of the estimation derived from the standard has not been satisfactory in spite of repetitive modifications made to improve it. One of the major reasons for the inaccuracy is that the standard has too small a number of cost adjustment factors to reflect the various characteristics of a software development project. To remedy this problem, we propose new cost adjustment factors which can be incorporated into the standard and are important to enhance the estimation accuracy, based on the analysis of several well-known software estimation models. Furthermore, by applying the proposed model to real world software projects, we show that the proposed model can produce more accurate estimates than the current standard.

시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석 (Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction)

  • 하기주;최민권;이동렬;하민수;하재훈;김외곤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

융합시대의 이러닝 콘텐츠 개발대가 산정기준의 실효성 제고 정책 (A Study on Policy for Actualizing the Development Cost Estimation Guidelines of e-Learning Contents in Era of Convergence)

  • 노규성;한태인
    • 디지털융복합연구
    • /
    • 제13권9호
    • /
    • pp.49-56
    • /
    • 2015
  • 최근 정부는 이러닝 콘텐츠 개발의 대가 기준에 대한 조사를 기반으로 명확한 대가 기준을 수립하고 이러닝 산업의 특성을 반영한 이러닝 콘텐츠 개발 대가 산정 가이드라인(기준)을 공개하였다. 그러나 제도적인 뒷받침이 없으면 제도가 취지와 목적을 달성하지 못하고 사문서화될 소지를 안고 있어 정책적 기반 마련이 필요하다 이에 본 연구는 대가기준 활용 활성화를 위해 이론적 배경 정리와 분석을 통해 대가기준의 단계적 적용 활성화, 대가기준의 제정 고시 및 정기적 조정, 대가기준운영위원회 운영, 이러닝산업 실태조사와의 연계성, 저작권 공동 소유 문화 확산, 개발과정의 체계적인 모니터링, 대가기준 적용 활성화 정책 연구, 표준계약서와 연동을 통한 정책 실효성 제고 등의 정책을 제언하게 되었다.

화공플랜트 견적 소프트웨어 개발에 관한 연구 (Development of the Estimation Software for a Petrochemical Plant)

  • 민봉기;이재헌
    • 플랜트 저널
    • /
    • 제8권1호
    • /
    • pp.50-59
    • /
    • 2012
  • The current dual-watchdog estimation system has individually calculated the construction, the engineering and the procurement cost. The dual-watchdog estimation system is inefficient and prolonged estimation period because of the lack of the interoperability and the difference of material unit cost and construction unit cost. In order to resolve this problem, new estimation software was developed. The estimation software is developed by making up for the weak points in existing estimation method. The cost data with the same standard is the key point. And this software enhanced accuracy and speed of the data search in stylized estimation standard. A summary of the construction, the engineering and the procurement cost was generated in this estimation software. The unit rate about the labor cost, equipment and expense through a sheet was handled. The developed estimation software has five categories on engineering cost, procurement cost, construction cost and subcontractor management sheet. In this study, the estimation software to supplement the faults of the existing estimation method was developed. And estimation software on petrochemical projects increases an efficiency of the estimation work.

  • PDF

스마트건설 공사비산정기준 사례조사 연구 - 일본사례를 중심으로 - (Case Study on the Cost Estimation standard for Smart Construction - Focused on Japan)

  • 송태석;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.171-172
    • /
    • 2020
  • Recently, the need for smart construction technologies related to the Fourth Industrial Revolution has been increasing in order to improve productivity of the construction industry. The Ministry of Land, Infrastructure and Transport has established Smart construction technology road map to commercialize the smart construction, and research and development is also underway. However, due to the lack of cost estimation standards for such smart construction technologies to be deployed to actual sites, smart construction technologies are not actively applied to construction sites. In particular, cost estimation standards are needed for construction machinery equipment with ICT technology that is currently available for commercialization. Therefore, as a preliminary study for the development of smart construction cost estimation standards, a case study was conducted on ICT construction estimation standards in Japan and present them as basic data for standards in Korea.

  • PDF

지하철골공사 공사비산정기준 마련을 위한 현장조사 연구 (A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey)

  • 송태석;한상준;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF

지식정보 구축 대가의 개발 : 국가직무표준(National Competency Standards)과의 통합 방안을 중심으로 (A Development of a Framework Cost Estimation Model for the Digital Document Database Construction Projects)

  • 김소정;서용원;손영호
    • 한국IT서비스학회지
    • /
    • 제16권3호
    • /
    • pp.47-65
    • /
    • 2017
  • The reference guide for the cost of establishing the digital documents has been used as a basis for establishing the budget for the construction of the knowledge information resource. However, due to the abolition of the nominal unit price notification in terms of IT projects, it is necessary to conduct research to convert the standard of the current labor force grade standard to the national incompetency standard (NCS). In this study, we investigate and revise the system and contents of the current knowledge information cost estimation model. In specific, i) we conducted gap analysis of cost estimation model and existing NCS model. As the contents conforming for the construction of the knowledge information resource were not adoptable, we define the description of the construction of the knowledge information resource and to identify the core elements of NCS prior to the improvement of the cost model. ⅱ) then we proposed improve the cost model considering integration with newly proposed NCS model for knowledge information construction job. In order to ensure the validity of the application of NCS development and cost estimation model, the experts reviewed relevant contents and made plans for improvement by using experts from supply and demand groups of various fields of national knowledge informatization projects.

도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구 (A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance)

  • 정대권;태용호;안방률;조윤호
    • 한국도로학회논문집
    • /
    • 제11권1호
    • /
    • pp.85-94
    • /
    • 2009
  • 실적공사비 적산방식은 품셈견적, 실측견적, 단가견적, 및 총액견적 등 매우 다양하다. 표준품셈은 공공기관 및 민간기관의 공사비 책정기준이 되는 자료이다. 본 논문에서는 도로공사에 이용되는 기존 품셈견적의 문제점을 개선하기 위해 현장조사를 실시하고 분석하였으며 그 결과로 각 공종에 대한 실측견적 방법을 통계적 방법을 통해 제시하였다. 또한, 기존 품셈과 실측품셈을 공사단위의 비교를 통해 제안된 품셈이 보다 간단한 견적 작성을 가능하게 하고 보다 현실적인 공사금액을 산출함을 알 수 있었다. 본 연구에서는 보조기층의 Case-Study를 통하여 각 방식별 장단점을 가시적으로 비교해 보았다. 실측품셈으로 적용하였을 경우, 계산과정은 기존품셈의 50%로 축소되었으며 1일 1장비 사용으로 기존의 1일미만 장비 사용에 대한 편차가 보완되었다. 또한 품셈만을 이용하여 공정의 시공내용을 짐작하고 이를 바탕으로 공정계획이나 인력투입계획 등을 수립할 수 있었다.

  • PDF

소프트웨어 사업대가기준 중장기 발전 방향에 관한 연구 (A Study on the Mid-Long Term Direction for Development of Software Cost Estimation Guidelines)

  • 김우제;권문주
    • 한국전자거래학회지
    • /
    • 제15권1호
    • /
    • pp.139-155
    • /
    • 2010
  • 본 논문의 목적은 소프트웨어 사업대가기준의 중장기 발전 방향을 도출하고 소프트웨어 사업대가기준의 프레임워크를 제시하는 것이다. 본 논문에서는 첫째, 소프트웨어 생명주기상의 모든 단계와 현재의 소프트웨어 사업대가기준과 모형들이 검토되고 분석되어졌다. 둘째, 소프트웨어 사업대가기준의 중장기적 발전 대안으로 단가와 지침을 분리하여 운영하고, 시장자율기능을 확대하는 방안을 도출하였다. 그리고 소프트웨어 사업대가기준의 중장기 발전대안의 선결과제로 비용 리포지토리의 구축, 소프트웨어 사업대가 지침화, 다양한 사업대가기준 모형화 및 인증제 도입, 사업대가 전문가제도 도입이 제시되었다. 마지막으로 소프트웨어 사업대가기준의 중장기 발전대안의 단계별 이행계획이 제시되었다.

건설공사 공사비 예측 및 관리기술 발전방향 : 호주 사례를 중심으로 (Direction for Improving Cost Estimation and Management of Construction Projects : Comparing to Australian System)

  • 지세현;박문서;이현수;윤유상
    • 한국건설관리학회논문집
    • /
    • 제9권2호
    • /
    • pp.170-181
    • /
    • 2008
  • 건설 프로젝트는 생산과정 이전에 설계도면을 바탕으로 예상되는 비용이 산정되며, 기획단계는 소요예산을 책정하고 설계단계는 예산에 합당한 효율적 대안을 찾으며, 정확한 입찰금액을 예측하기 위해 수차례 이루어진다. 특히, 물량산출 이전까지 예측되는 공사비의 정확도와 신뢰도는 매우 중요하다. 그러나, 국내의 경우 면적당 단가 방식 공사비 예측을 벗어나지 못할 뿐 아니라, 단계별 예측방법, 프로세스, 데이터 분석 및 관리기술 등이 표준화되어 체계적이고 종합적으로 관리되지 못하고 있다. 이에 국내 공사비 예측기술 및 관리기술 발전을 위하여 첫째, 표준화된 공사비 데이터베이스 구축과 국가차원의 종합적 관리가 필요하며, 구축 방법으로 다차원 공사비 데이터베이스 개념모델 CUBE를 제시하였다. 둘째 단계별 공사비 예측의 목적에 맞는 코스트 모델 적용이 필요하며, 코스트 모델의 방법론을 기획단계와 설계단계로 구분하여 제시하였다. 셋째, 이러한 두 가지 코스트 모델을 적용한 코스트 플래닝 프로세스를 제시하였고, 넷째, 공사비 예측 및 관리 전문인력 양성의 필요성을 제시하였다.