• Title/Summary/Keyword: standard apartment construction cost

Search Result 43, Processing Time 0.032 seconds

Review on the Effectiveness of Apartments According to Insulation Reinforcement of Energy Saving Design Standard - Energy Cost Analysis of Space Heating and Domestic Hot Water - (에너지절약설계기준의 단열 변화에 따른 공동주택 실효성 검토 - 난방 및 급탕에너지 사용금액 분석 -)

  • Kim, Ji-hyeon;Lim, Hee-won;Lee, Hyun-seung;Shin, U-cheul
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.1
    • /
    • pp.173-178
    • /
    • 2020
  • In this study, we analyzed space heating and domestic hot water(DHW) charges from 2017 to 2018 for 151,206 households in 202 apartment complexes built from 1997 to 2016, in order to evaluate the effectiveness of Korea's insulation standards reinforcement. The applied insulation standards were revised three times(in 1987, 2001 and 2010). We used the Anderson-Darling test to review the normality of the space heating and DHW charges. As a result, each p-value was greater than 0.05 and it followed the normal distribution. The annual average space heating charges per unit area of apartments with the 1987 insulation standards were 5,237₩/㎡a in 2017 and 5,328₩/㎡a in 2018. The heating charges with the 2001 standards were 4,827₩/㎡a in 2017 and 4,817₩/㎡a in 2018. Compared to previous standards(1987 standards), heating charges decreased by 7.8% and 9.6%. Also the heating charges with the 2010 standards were 3,683₩/㎡a in 2017 and 3,734₩/㎡a in 2018. Compared to previous standards(2001 standards), heating charges decreased by 24.3% and 21.5%. On the other hand, compared to each previous standards, DHW charges were decreased by 12.2%, 13.6% or increased by 4.6%, 6.9%, which means there's no correlation between insulation standards reinforcement and DHW charges.

Method of Quantity Data Analysis for Building Construction Cost Estimation : Focusing on Finish Work of Public Apartment Project (공사비 예측을 위한 수량기반 데이터 분석방법 : 공공 아파트 수장공사 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Seong, Ki-Hoon;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.235-243
    • /
    • 2008
  • Construction projects have unique characteristics that these may be carried out by contractors thus, cost should be estimated before execution. The importance of cost estimation and cost check has become increasingly emphasized in all phases of construction project that would be performed numerously. It is needed that owner have to estimate reasonable budget, and contractor should predict the bid price. However, there are lack of standard cost estimation method before quantity takeoff, cost analysis method, and cost database thus, the method of area cost, such as square foot method, is as used as ever in Korea. Therefore, this research suggested standard cost database structure CUBE, and analysis method of item quantity per one household categorized by area type. Whereafter, database of all item quantity of finish work has been built with 90 building cost data, and validated it's availability. In this respect, the suggested method and the findings from this research are expected to help enhancing the efficiency and productivity of cost estimation in Korea.

A Study on the Repair Time of the Construction Type in the Apartment Housings (공동주택 공종별 수선시기 설정 연구)

  • Lee, Kang-Hee;Park, Geun-Soo;Chae, Chang-U
    • Journal of the Korean housing association
    • /
    • v.22 no.4
    • /
    • pp.83-92
    • /
    • 2011
  • Apartment is settled down as a main housing type and massive supply has been conducted since 1990's. The government has focused on the housing supply to improve the housing number and cut its price. On the contrary, the management of the housing has been neglected to get an early deterioration. Since 1995's, various ways have been made to improve and maintain the building function and performance. Among these, the long-term repair plan has played a main role to manage the housing condition and plan the repair schedule for preparing the massive cost of repair such as a roof proof, elevator change. The long-tern repair plan provides the repair time and repair rate according to various construction types. Most of the management agent apply the repair standard into the field area. But the repair time could not reflect the present condition and bring into the wrong maintenance. Therefore, the repair time for the long-term maintenance plan would be revised and reflected from the material and technology development. |n this study, it aimed at improvement for the repair time in various construction types which are provided in the long-term repair plan. For this, the 22 management agents are surveyed directly. This study shows that the repair time of the painting are correspondent to the repair time of the long-term plan irregardless of the painting materials. Most of other areas would correspondently similar to the long-term plan. This study could not include the building location, material and other haracteristics. Therefore, the further study would be needed to reflect the building and materials attributes to get the detailed repair time.

A Study on the Work Crew Based for the Estimation from Construction Analysis of Cement Liquid Waterproofing in Apartment House (공동주택 시멘트 액체방수 공사의 현장분석을 통한 작업조 기반 품셈에 관한 연구)

  • Ha, Gee-Joo;Ha, Min-Su
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.121-128
    • /
    • 2010
  • This study aims to make improvements to the standard estimation process used to estimate reasonable costs for construction work, and to suggest a work crew based estimation using a new cost estimation model. In addition, work crew shift combination and construction process were systematically organized in order to improve the estimation technique and the construction capability of the cement liquid waterproofing work for apartment buildings. In addition, in terms of manpower and productivity, analyses were performed on the cement liquid waterproofing work for apartment buildings with net areas between $84-85m^2$ and $125-184m^2$, and the results were then compared with those calculated using the conventional work-crew based estimation method. Through this study, when the results of this study and those calculated by the conventional method were compared, for apartments with the net area of $84-85m^2$, the differences between specialists were shown to be 1.91 times to 2.13 times on average, while they were 8.82 times to 9.52 times between normal workers on average. For apartments with the net area of $125-184m^2$, the differences betweenspecialists were shownto be 1.89 times to 2.07 times on average, and 8.57 times to 9.38 times on average between normal workers.

A study on the Assessment of Standard Wages for Constructing Luminaries for Landscope Lighting (경관조명기구의 설치에 대한 기준노임 산정에 관한 연구)

  • Yoo, Dong-Gil;Lee, Bok-Hee;Lee, Sok-Yeon
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.169-172
    • /
    • 2008
  • Recently, landscape lighting is more and more installing in many places such as park, cultural heritages, large-scale structures, bridges, apartment, and so on. However, there is no the government-set official estimation for standard wages constructing luminaries for landscape lighting. The cost of construction is estimated based on the standard wages of related-similar installations such as internal lighting fixtures or the designer's subjective decision. Sometimes, it is overestimated or underestimated. In this paper, the fundamental process for estimating the standard wages constructing luminaries for landscape lighting is studied. The estimation method of standard wages constructing lighting fixtures was examined on the basis of the type and capacities of luminaries, installation places, type and shapes of installation auxiliary materials, worker's skill, and etc. As a result, some results obtained in this work were significantly, different with the standard wages for internal electric wiring published by Korea Electric Association. In the future, to improve the accuracy of the estimation of the standard wages for constructing luminaries for landscope lighting, detailed factors related to the installation condition and dimensions and types of luminaries should be considered.

  • PDF

Proposing provisions of Standard Repair Method of Painting Work Defect by Lawsuit Case Study

  • Seo, Deokseok
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.16 no.2
    • /
    • pp.1-9
    • /
    • 2017
  • Defect dispute in apartment building has become a debating social issue. The system of defect lawsuit and the conciliation process are applicable to solve defect problems in South Korea. Among various defects, painting work defect is a critical issue because it requires large area works and entails a lot of cost. Accordingly, disputes on work procedure and cost calculation are argued oftenly between residents and housing providers. This study reviewed detailed main issues of painting work and propose relevant systems and standards. In this analysis, the main issues are categorized into pre-works, main work, and others. The most recent cases are compared and analyzed for each issue. After the analysis, following conclusions are obtained, (1) In defect lawsuit system, even though surface treatment work in pre-work step is part of main work, it has been separated and regarded as a separate work. (2) Although the main painting work are not significantly different from two systems, it is still necessary to achieve a consensus to close the gap in the methodology of painting area calculation and determining whole painting or partial painting. (3) In addition, unlike the profit rate of general construction works, that of painting work remained the maximum rate and additional charge rate for works carried out in higher place are different among cases. Therefore, it is determined that establishing consistent standards is urgent.

A Study on Application of MC Design Standardization Standard and Current Status in Ga-Yang Modular Housing (가양 모듈러 실증단지의 MC설계표준화 기준 적용 및 실태조사 연구)

  • Lim, Seok-Ho;Chung, Joon-Soo;Seol, Wook-Je;Baek, Cheong-Hoon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.5
    • /
    • pp.85-94
    • /
    • 2019
  • The modular apartment has been completed for the first time in Korea through the national research and development (R&D) project in December 2017, and 30 households moved in. Although conditions such as technicality and constructability have to be satisfied to adopt and spread the modular apartments in the future, economic feasibility is the most important factor among the conditions. The economic feasibility of modular apartments can be compared with that of existing reinforced concrete (RC) structure apartments. It is highly important to reduce the construction cost through standardization above all. The standardization refers to establishment of national design standards and principles, and it is important for manufacturers and building companies to comply with those standards and principles. The modular construction (MC) skill in Korea is at an early adoption stage and the MC market is not widely expanded yet. Thus, the application of the MC design, which is the basis of the standardization, has not been widely accepted. However, related R&D projects are now performing mainly by the Ministry of Land, Infrastructure, and Transport to promote modular apartments in recent years and the design standardization standard (draft) is now prepared to be notified as a result of the steady research. Furthermore, pilot complexes for demonstration purpose are under construction, starting from public rental apartments. Thus, MC method-applied public rental houses will be spread in near future. This study aims to investigate the current design status in the Ga-Yang Housing as a pilot modular complex to produce and supply more economical and efficient modular houses, and analyze the problems by comparing the design standardization standards with pre-notified design standardization standards and summarize the modifications between them thereby presenting foundational data for establishment of the design standardization in the modular business industry.

The feasibility study for the building integrated geothermal system using the horizontal heat exchanger (수평형 지중열교환기를 이용한 건물일체형 지열시스템의 도입타당성 분석)

  • Chae, Ho-Byung;Nam, Yujin;Yoon, Sung-Hoon
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.1
    • /
    • pp.81-87
    • /
    • 2015
  • Recently, in order to prevent increasing energy usages in the international community, many countries have attempted to develop the innovative renewable energy systems. Among the renewable energy systems, Ground source heat pump(GSHP) system which supply the heating, cooling and hot water in the building has been attracted by its stability of heat production and high efficiency. However, the initial drilling costs become very expensive and the construction period takes longer the other systems, because GSHP system needs more than 100 m depth drilling. In this study, in order to reduce initial costs of the GSHP, the building integrated geothermal system using the horizontal heat exchanger was developed. The heating and cooling load in the standard housing model was calculated by a simulation and the system design capacity in the high-rise apartment was decided by the total load. Based on the system design capacity, the high-rise apartments were applied to a BIGS and vertical GSHP system and there are analyzed about initial costs. In the result, the initial cost of BIGS could reduce 24% of the initial cost of the vertical GSHP system.

Application of Electronic Deck Charge Blasting Method to a Vertical Shaft Excavation (수직구 굴착시 전자뇌관을 이용한 Deck-Charge 발파 시공사례)

  • Kim, Jae-Hong;Kim, Hee-Do;Lee, Jun-Won;Kim, Gab-Soo;Son, Young-Bok;Kim, Jae-Hoon
    • Explosives and Blasting
    • /
    • v.31 no.1
    • /
    • pp.64-75
    • /
    • 2013
  • This case study deals with an excavation blasting carried out at "Sooseo-Pyeongtek ${\bigcirc}$-${\bigcirc}$ section construction site" in the vicinity of residential area. Originally, the sequential blasting (multi-stage blasting) using electric detonators was planed in this area. However, there was a concern that the sequential blasting method could increase the construction cost by delaying the construction period due to possible complaints from local residents. As an alternative, electronic deck blasting technique was taken in order to meet the ground vibration regulation (0.2cm/s, in apartment area) and to keep the construction schedule. The performance of the electronic deck charge blasting was two times better than the sequential blasting with electric detonators and the level of ground vibration was also within the regulatory value (0.2cm/s). In particular, it was shown that the use of electronic detonater eDevII, which was developed for tunnel, could provide more convenient and electrically safer working condition.

Measurement of Air Contaminants Emission from Interior Finish Material (실내 건축 마감자재의 공기오염물질 방출량 분석)

  • Kim, Yun-Deok;Lim, Soo-Young
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.1
    • /
    • pp.58-65
    • /
    • 2007
  • For the moderns who spend more than 80% of the time inside a building, interior environment became important since it directly affects their health. Recently as noxiousness of the air contaminants of the interior space stood out as well as the above trend, the Ministry of Environment enacted a lawto maintain the interior air quality at certain level of standard in the multi use facility and newly constructed apartment. To make the indoor air clean, removal technology of various contaminants should be developed and interior materials with chemical treatment should be restrained. In other words, selection of interior finish affects indoor air quality from the initial design stage to the construction stage. However, only limited contaminants emission data of building materials are supplied by related companies. There is no average contaminants emission data for overall materials. Moreover, high cost and equipments for one time measurement of VOCs emission of interior finish are the obstacles of active research and data measurement. Therefore, this paper searched the current condition of average VOCs & HCHO emission of various interior finish based on the study requested to research center from the building material company through Stands Test Method for Indoor Air Quality.