Construction managers use scheduling methods to improve the outcome of their project. In spite of the many obvious advantages of the critical path method (CPM), its use in construction has been limited. Understanding the reasons why CPM is not used as extensively as expected could improve its level of acceptance in the construction industry. The link between construction scheduling methods and the capabilities of the scheduling staff has been an on-going concern in the construction industry. This study proposes a staffing-technology fit model to understand why CPM is not used as extensively as expected in construction scheduling. A staffing-technology fit model that aims to measure the extent to which a construction scheduling method matches the staff's experience, know-how and capabilities. The model that is proposed is an answer to the lack of proper instruments for evaluating the extent to which scheduling methods are used in the industry.
For the past several decades, personnel scheduling and rostering problem has been one of the most popular research topics in optimization area. Among the numerous applications, airline (aviation) industry has been given most attention due to the economic scale and impact. Most of the literatures about the staff scheduling problem in airline industry are dealing with the air crew, pilots and flight attendances, and the rest of the literatures are about the ground staff, by whom cleaning, maintenance, fueling of aircraft and handling luggage are done from landing to taking off. None of the literatures found by the authors are dealing with the airline ground crew. In this paper roster of airline ground crew, who is responsible for issuing boarding pass, checking baggage, etc, is introduced, formulated and solved using CPLEX. Some expressions of the mathematical formulations, which are not suitable input format of the CPLEX, were transformed. Numerical examples are presented for the validation of proposed scheduling system.
Staff scheduling is an important area, both from an academic and industrial point of view. It has become increasingly important as business becomes more service oriented and cost conscious in a global environment. There has been a lot of study to develop new and efficient staff scheduling models and methods. The purpose of this paper is not to develop new theoretical results but to develop a comprehensive user-friendly staffing model that can be applied to the real-world practice. The developed staffing software, OptStaff, provides the optimal configuration of the customer support center including the selection of customer support center locations, the allocation of staffs to each selected location, and schedules of staffs, so as to minimize the total cost while maximizing the customer satisfaction level. OptStaff also has capability to do scenario analysis by varying the levels of parameters and to create a variety of graphs and reports with user-friendly interfaces.
International conference on construction engineering and project management
/
2015.10a
/
pp.117-121
/
2015
Construction managers use scheduling methods to improve the outcome of their project. Despite the many obvious advantages of the critical path method (CPM), its use in construction has been limited. Understanding the reasons why CPM is not used as extensively as expected could improve its level of acceptance in the construction industry. The link between construction scheduling methods and the tasks expected to be performed by schedulers has been an on-going concern in the construction industry. This study proposes a task-technology fit model to understand why CPM is not used as extensively as expected in construction scheduling. A task-technology fit model that aims to measure the extent to which a construction scheduling method functionally matches the tasks expected to be performed by the scheduling staff. The model that is proposed is an answer to the lack of proper instruments for evaluating the extent to which scheduling methods are used in the industry.
Scheduling is an important tool for a manufacturing system, where it can have a major impact on the productivity of a production process. In manufacturing systems, the purpose of scheduling is to minimize the production time and costs, by assigning a production facility when to make, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation and reduce the costs. In order to find an optimal solution to manufacturing scheduling problems, it attempts to solve complex combinatorial optimization problems. Unfortunately, most of them fall into the class of NP-hard combinatorial problems. Genetic algorithm (GA) is one of the generic population-based metaheuristic optimization algorithms and the best one for finding a satisfactory solution in an acceptable time for the NP-hard scheduling problems. GA is the most popular type of evolutionary algorithm. In this survey paper, we address firstly multiobjective hybrid GA combined with adaptive fuzzy logic controller which gives fitness assignment mechanism and performance measures for solving multiple objective optimization problems, and four crucial issues in the manufacturing scheduling including a mathematical model, GA-based solution method and case study in flexible job-shop scheduling problem (fJSP), automatic guided vehicle (AGV) dispatching models in flexible manufacturing system (FMS) combined with priority-based GA, recent advanced planning and scheduling (APS) models and integrated systems for manufacturing.
This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek schedule currently being practiced by Afam power station maintenance line. The second alternative is to switch to a seven-day workweek schedule for the morning shift only. The third alternative is to use a seven-day workweek schedule for all three work shifts. The third alternative is chosen, as it is expected to save 11% of the maintenance labour cost.
KSII Transactions on Internet and Information Systems (TIIS)
/
v.18
no.4
/
pp.843-859
/
2024
The university course scheduling problem (UCSP) aims at optimally arranging courses to corresponding rooms, faculties, students, and timeslots with constraints. Previously, the university staff solved this thorny problem by hand, which is very time-consuming and makes it easy to fall into chaos. Even some meta-heuristic algorithms are proposed to solve UCSP automatically, while most only utilize one single algorithm, so the scheduling results still need improvement. Besides, they lack an in-depth analysis of the inner algorithms. Therefore, this paper presents a novel and practical approach based on Tabu search and simulated annealing algorithms for solving USCP. Firstly, the initial solution of the UCSP instance is generated by one construction heuristic algorithm, the first fit algorithm. Secondly, we defined one union move selector to control the moves and provide diverse solutions from initial solutions, consisting of two changing move selectors. Thirdly, Tabu search and simulated annealing (SA) are combined to filter out unacceptable moves in a parallel mode. Then, the acceptable moves are selected by one adaptive decision algorithm, which is used as the next step to construct the final solving path. Benefits from the excellent design of the union move selector, parallel tabu search and SA, and adaptive decision algorithm, the proposed method could effectively solve UCSP since it fully uses Tabu and SA. We designed and tested the proposed algorithm in one real-world (PKNU-UCSP) and ten random UCSP instances. The experimental results confirmed its effectiveness. Besides, the in-depth analysis confirmed each component's effectiveness for solving UCSP.
Park, Jung-Ho;Park, Hyeoun-Ae;Cho, Hyon;Choi, Yong-Sun
Journal of Korean Academy of Nursing
/
v.26
no.2
/
pp.399-412
/
1996
Even though Korean medical law stipulates that number of patients attended by a nurse is 2.5 for hospitalization and 30 for ambulatory care, the number of patients cared by a nurse per day is much greater than the standard prescribed by the medical law. Current nursing productivity of nurses is not desirable unless the quality of care considered. Moreover. nursing manpower staffing based on neither current nurses' productivity nor standard of medical law cannot respond properly to dynamic situation of the medical services. As for the nurse scheduling, the critical problem of it in the hospital is determining the day-to-day shift assignments for each nurse for the specified period in a way that satisfies the given requirements of the hospital. Nurse scheduling, however, involves many factors and requirements, manual scheduling requires much time and effort to produce an adequate schedule. Under these backgrounds, the necessity of more efficient management of nursing manpower occupying 1/3 of total hospital workers has been recognized by many nursing administrators. This study was performed to develop a system computerizing nurse staffing and scheduling based on the patient classification. As a preliminary step for the system development, nursing workload in a secondary hospital was measured from Sep. to Oct. 1994. On the grounds of this result, computerization of nurse staffing and scheduling was proceeded with three options. First one is based on the current medical law. Second one is based on the assigned number of nursing staff. And the last is based on the request by patient classification. Computer languages used in this study were MS Visual Basic 3.0 for the staffing and Access 2.0 for the scheduling, respectively. Prospective users may operate this system easily because icons and mouse are used for easier graphic user interface and reducing the need for typing efforts. This system can help nurse administrators manage nursing manpower efficiently and nurses develop quick and easy schedule generation and allow more time for the patient care.
The purpose of this study is to propose the baseline data for -developing the occupational stress measurement tool for Psychiatric nurses Working in the hospital. 135 staff nurses in psychiatric unit of 11. hospital were participated during the period from August 1 to August 20, 1988. Though the pretest and literature review a questionnaire was coristructed with 88 stressors which were experienced by the psychiatric nurses in the hospital. Subjects were given instruction to rate 1~6 likert type scale according to the level of stress experienced by each stressor described. Reliability of the tool was tested by Cronbach's Alpha and the reasult was ${\alpha}=0.94871$. Factor analysis was applied to organize 88 items together: As the result, 14 factors were obtained. The factors were; 1) Administration problem 2) Work overload 3) Role conflict as a profession 4) Lack of professional knowledge and skill 5) Conflict with nurses 6) Conflict with other health teams 7) Conflict in nurse-clint relationship 8) Conflict with supervisor 9) Conflict with suborinate 10) Low reward 11) Scheduling probrem 12) Inappropriate physical environment 13) Staff inadequate 14) Inadequate of equipment.
Managing a call center is a complex and diverse challenge. Call center becomes a very important contact point and a data ware house for successful CRM. Improving performance of call center is critical and valuable for providing better service. In this study we applied forecasting technique to estimate incoming calls and ProModel based simulation model to enhance performance of a mobile telecommunication company's call center. The simulation study shows reduction in managing cost and better customer's satisfaction.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.