Maintenance Staff Scheduling at Afam Power Station  

Alfares, H.K. (Mechanical Engineering Department King Fahd University of Petroleum and Minerals)
Lilly, M.T. (Mechanical Engineering Department Rivers State University of Science and Technology)
Emovon, I. (Mechanical Engineering Department Rivers State University of Science and Technology)
Publication Information
Industrial Engineering and Management Systems / v.6, no.1, 2007 , pp. 22-27 More about this Journal
Abstract
This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek schedule currently being practiced by Afam power station maintenance line. The second alternative is to switch to a seven-day workweek schedule for the morning shift only. The third alternative is to use a seven-day workweek schedule for all three work shifts. The third alternative is chosen, as it is expected to save 11% of the maintenance labour cost.
Keywords
Power Station; Maintenance; Optimization; Labour Scheduling;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Alfares, H. K. (1999), Aircraft Maintenance Workforce Scheduling, Journal of Quality in Maintenance Engineering, 5, 78-87.   DOI   ScienceOn
2 Alfares, H. K. (1998), An efficient two-phase algorithm for cyclic days-off scheduling. Computers & Operations Research, 25, 913-924.   DOI   ScienceOn
3 Duffuaa, S. O. and Al-Sultan, K. S. (1999), A stochastic programming model for scheduling maintenance personnel, Applied Mathematical Modelling, 23, 385-397.   DOI   ScienceOn
4 Emmons, H. and Fuh, D.-S. (1997), Sizing and scheduling a full-time and part-time workforce with offday and off-weekend constraints, Annals of Operations Research, 70, 473-492.   DOI
5 Roberts, S. M. and Escudero, L. F. (1983), Scheduling of plant maintenance personnel, Journal of Optimization Theory and Applications, 39, 323-343.   DOI   ScienceOn
6 Burns, R. N. and Carter, M. W. (1985), Workforce size and single-shift schedules with variable demands, Management Science, 31, 599-607.   DOI   ScienceOn
7 Caprara, A., Monaci, M., and Toth, P. (2003), Models and algorithms for a staff scheduling problem. Mathematical Programming, 98, 445-476.   DOI   ScienceOn
8 Ahire, S., Greenwood, G., Gupta, A., and Terwilliger, M. (2000), Workforce-constrained preventive maintenance scheduling using evolution strategies, Decision Sciences, 31, 833-859.   DOI
9 Ernst, A. T., Jiang, H., Krishnamoorthy, M., and Sier, D. (2004), Staff scheduling and rostering: a review of applications, methods, and models, European Journal of Operational Research, 153, 3-27.   DOI   ScienceOn
10 Alfares, H. K. (2001), Efficient optimization of cyclic labour days-off scheduling, OR Spectrum, 23, 283-294.   DOI
11 Brusco, M. J. and Johns, T. R. (1998), Staffing a multiskilled workforce with varying levels of productivity: An analysis of cross-training policies, Decision Sciences, 29, 499-515.   DOI   ScienceOn
12 Coleman, R. M. (1995), Cost effective shift schedules enhance utility operations, Power Engineering, 99, 27-29.
13 Hung, R. (2006), Using compressed workweeks to save labour cost, European Journal of Operational Research, 170, 319-322.   DOI   ScienceOn
14 Vohra, R. V. (1987), The cost of consecutivity in the (5,7) cyclic staffing problem, IIE Transactions, 29, 942-950.
15 Bard, J. F., Binici, C., and Desilva, A. H. (2003), Staff Scheduling at the United States Postal Service, Computers & Operations Research, 30, 745-771.   DOI   ScienceOn