• Title/Summary/Keyword: speedy construction

Search Result 42, Processing Time 0.02 seconds

Reliability-Based Assessment of Safety and Residual Carrying-Capacity of Steel-Box Pedestrian Bridges (신뢰성에 기초한 강상형 보도육교의 안전도 및 잔존 내하력평가)

  • 조효남;최영민;이은철
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1996.04a
    • /
    • pp.202-211
    • /
    • 1996
  • A number of typical type of steel-box pedestrian bridges are constructed in the metropolitan highway or heavy traffic urban area. Although it has the advantage of speedy construction because of its simple structural form and prefabricated erection method, it has been reported that many of these bridges are deteriorated or damaged and thus are in the state such that it would give unsafe and uncomfortable feeling to pedestrians. In the paper, for the realistic assessment of safety and residual earring-capacity of deteriorated and/or damaged steel box pedestrian bridges, an interactive non-linear limit state model are formulated based on the von Mises' combined stress yield criterion. It is demonstrated that the proposal model is effective for the reliability-based safety assessment and residual carrying-capacity evaluation of steel-box pedestrian bridges. In addition, this study suggests an effective and practical field load test method for pedestrian bridges.

  • PDF

Establishment Strategy of 3D Spatial Information from 2D Facility Drawing Related to Fire Fighting (2차원 소방대상 시설물도면의 3차원 공간정보 구축방안)

  • Lee, Yun;Kim, In-Hyun;Choi, Yun-Soo;Oh, Kyu-Shik
    • Spatial Information Research
    • /
    • v.18 no.5
    • /
    • pp.47-54
    • /
    • 2010
  • Until recently, GIS technology was mainly based on 2D for disaster management. Necessity of 3D spatial information came to the fore with a speedy and accurate response system in disaster management. However, most fire-fighting facilities presently use CAD with 2D formation, Image drawings, and conception of construction data's formation. It is not about the drawings in map production. It's about varieties of construction ways or contents. In this study, we are proposing the ways on analyzing the existing disaster management targets for 2D technology drawings, designing the 3D spatial information data model, and transforming the effective 3D spatial information into algorithm and dimension spatial information construction for easily building on mass 2D architectural drawings to 3D spatial information effectively in disaster management. We can maxim ize efficient construction time and expenses. Then what is proposed in this study about constructing 3D spatial information for manual work, and it's significance for improving decisive decisions and utilizing the tasks to prevent, prepare, respond and restore steps in disaster management.

A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure - (리모델링의 특성을 반영한 철거공사의 공정계획 수립방안 - 벽식구조 노후 공동주택을 대상으로 -)

  • Kang, Sa-Yil;Hwang, Young-Kyu;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.104-115
    • /
    • 2008
  • Currently, reconstruction and remodeling are conducted to improve the performance of aged housing. Recently reconstruction has caused many problems such as wastes generation, wasting resources and real estate speculation, remodeling is drawing attention. Accordingly, remodeling business for aged housings gradually increasing, but the use of scheduling method not considering characteristics of remodeling deters construction in some construction types. Especially, in case of dismantling construction, the dismantling is delayed since the scheduling method not considering characteristics of remodeling is used. In case of remodeling, dismantling construction is ahead of other processes, if the dismantling construction is delayed, whole construction will be delayed and if speedy construction is conducted, the costs for remodeling will increase. Furthermore, existing remodeling for aged housing has been for rahmen(crossbeam and pillar) structure apartments, but since most apartments to be remodeled are wall-slab structure where dismantling takes a lot of weight, it is highly possible the dismantling construction is delayed. Thus, this paper is to establish scheduling method for the dismantling construction reflecting characteristic of remodeling to prevent delay of dismantling construction for remodeling of aged housing with wall-slab structure.

Development of Performance Indicators on Private Building Construction Sites using Supervisory Report (감리데이터 기반의 민간 건축현장 성과지표 개발)

  • Sung, Yookyung;Hur, Youn Kyoung;Lee, Seung Woo;Yoo, Wi Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.65-75
    • /
    • 2022
  • As performance measurement is important for systematic management, the key indicators for performance measurement have been consistently researched in the construction industry. However, there are only a few cases in which performance measurement is performed because it requires strenuous efforts to collect data for measurement. Unlike the public sector, which has been collecting project data through laws, the private sector has very little data to measure performance. In contrast, supervision work concerns important data necessary for the performance management on building construction sites in accordance with the Building Act. Therefore, in this study, we used the data from supervisory reports to measure the performance of private building projects. First, we derived 6 performance areas and 15 indicators through a few rounds of expert group discussions and 2 surveys. Then, we identified the performance indicators with high feasibility of data collection and computed their degree of significance via the analytic hierarchy process. It is expected that the performance indicators and their computational processes derived in this study can be used to systematically measure the performance and aid the speedy diagnosis of private building construction sites.

Analysis of Environmental and Social Problems Caused by Photovoltaic Complex and Wind Farm Construction and Countermeasures to Mitigate the Problems (태양광 및 풍력단지의 개발에 따른 환경적·사회적 문제 분석 및 대응방안)

  • Ahn, Sewoong;Lee, Hi Sun
    • Journal of Environmental Policy
    • /
    • v.10 no.3
    • /
    • pp.3-20
    • /
    • 2011
  • Through case studies of photovoltaic complex and wind farm construction and management, the causes of environmental and social conflicts were analyzed. Policies and measures to minimize conflicts and complement the institution were identified by analyzing successful construction and management case studies from both domestic and abroad. The causes of problems were haphazard damages to the regional environment, direct damages from power production facilities, lack of regional benefits from power production businesses, and loose environmental restrictions and management. The countermeasures to mitigate the problems at hand are to improve and strengthen the guidelines for power production businesses, secure residents' acceptability, strengthen regulations for business explanation, increase stakeholder's participation, find alternative sites, and ensure the speedy implementation of on-shore wind farms. Through these countermeasures, specific goals included in the New Renewable Energy Master Plan, such as target goals for photovoltaic and wind energy, preservation and protection of environment, and improvement of residents' acceptability, can be achieved.

  • PDF

Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM (이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 -)

  • Rho, Juhee;Park, Moonseo;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.11-19
    • /
    • 2020
  • A daily progress monitoring and further schedule management of a construction project have a significant impact on the construction manager's decision making in schedule change and controlling field operation. However, a current site monitoring method highly relies on the manually recorded daily-log book by the person in charge of the work. For this reason, it is difficult to take a detached view and sometimes human error such as omission of contents may occur. In order to resolve these problems, previous researches have developed automated site monitoring method with the object recognition-based visualization or BIM data creation. Despite of the research results along with the related technology development, there are limitations in application targeting the practical construction projects due to the constraints in the experimental methods that assume the fixed equipment at a specific location. To overcome these limitations, some smart devices carried by the field workers can be employed as a medium for data creation. Specifically, the extracted information from the site picture by object recognition technology of CNN model, and positional information by GIPS are applied to update 4D BIM data. A standard CNN model is developed and BIM data modification experiments are conducted with the collected data to validate the research suggestion. Based on the experimental results, it is confirmed that the methods and performance are applicable to the construction site management and further it is expected to contribute speedy and precise data creation with the application of automated progress monitoring methods.

Review on the Approaches and Issues in the field of Health Education in National Information Infrastructure (초고속정보통신망을 이용한 보건교육 활용방안)

  • 김은주
    • Korean Journal of Health Education and Promotion
    • /
    • v.13 no.1
    • /
    • pp.45-51
    • /
    • 1996
  • The Korea Information Infrastructure aims at the construction of an advanced national information infrastructure, consisting of communication networks, computers, databases and multimedia terminals. In the emerging information society, a well-established national information network plays a crucial role in enhancing economic efficiency and creating national wealth. Till 2015, government plans to construct an Information Superhighway Network and to provide a telecommunication service for speedy transmission of multi-media typed information and development of various applied programs, which help government's commitment to establish nationwide infrastructure to perform a leading role as a high level information society in the 21st century. In the field of health education, the research monograph contains three main parts: health education and information, acceptability of health education; development of health education management information system. In the most remote areas, it can bring high-quality health care where none is now available. In global health care, it can enhance and standardize the quality of medical care throughout the world. Before enlarging the establishment of the health education network system, the issues from this study should be considered to improve the health status through the introduction of information technology and applications in health care.

  • PDF

Analysis of Overhead Rigid Conductor Line for the Subway tunnel section (지하철 터널 구간 강체가선 방식의 특성분석)

  • Yim Geum-Kwang;Chang Sang-Hoon;Kim Wang-Gon
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.493-499
    • /
    • 2003
  • Railroad, a superior mode of public transportation provides safe, efficient, speedy, comfortable and economical service, has fundamentally different characteristics from airplanes, ships and cars. Among the unique characteristics of a railroad is the fact that it operates on fixed track with multiple car trains. The subway system was first selected as the best solution to difficult automobile traffic conditions and environmental problems. Seoul subway no.1line (Jongno line) was opened for service on August 15, 1974. Seoul city has completed and now operates eight subway lines (286.7km) since 1974. At present the subways operate in Busan, Daegu and Incheon city, and are under construction in Gwangju and Daejeon city. The power source for subway trains has been electricity since 1896, and power supply systems are the third rail type and/or the catenary system. The typical catenary system is the rigid bar type. R-bar and T-bar are used in the rigid bar type of catenary system, and the two types of R-bar and T-bar are uesd in Korea also. R-bar is used only for AC 25kV power supply and T-bar for DC 1,500V. From 30 years of subway experience I would like to suggest the most economic catenary system to ensure of safety, reliability and expediency for the railway lines to be constructed and the forthcoming replacement due to the life cycle after studying and analysing the characteristics, advantages and disadvantages of R-bar and T-bar.

  • PDF

A Case Study of Quality Management System Computerization with SAP QM Module & Mobile Office Construction (품질경영 성과 향상을 위한 ERP QM모듈 및 모바일 오피스 기반의 품질경영시스템 구축에 관한 연구 - A사(社) 사례(事例)를 중심(中心)으로-)

  • Kwon, Oh-Hyun;Park, Yong-Tae
    • The Journal of Information Systems
    • /
    • v.23 no.2
    • /
    • pp.49-66
    • /
    • 2014
  • In today's competitive business environment it is a necessary condition for a company to produce high-quality product for its survival and growth. That is the case in the auto-part industry as well where the international standards, ISO/TS 16949 certification, are required by customers to adopt mandatory. This study presents a successful implementation of quality management system(QMS) in a major auto-part manufacturer in Korea, utilizing SAP's QM(qualaity management) module and a mobile office system. The QMS brought the company "A" a variety of benefits such as real-time availability of product-inspection data, speedy decision-making, reduction in time required for defect-handling, ease of vertical integration of business partners in supply chain, and ease of business process standardization between headquarters and overseas subsidiaries. It is expected that the findings of this study can be used as a useful guideline for companies to consider implementing ERP-based quality management systems successfully.

Application of In-Situ Mixing Hydration Accelerator on Polymer Modified Concrete for Bonded Concrete Overlay (접착식 콘크리트 덧씌우기를 위한 초속경화 첨가재 현장 혼합 폴리머 개질 콘크리트의 적용성 연구)

  • Kim, Young Kyu;Hong, Seong Jae;Lee, Seung Woo
    • International Journal of Highway Engineering
    • /
    • v.17 no.3
    • /
    • pp.85-95
    • /
    • 2015
  • PURPOSES : Recently, bonded concrete overlay has been used as an alternative solution in concrete pavement rehabilitation since its material properties are similar to those of the existing concrete pavements. Deteriorated concrete pavements need rapid rehabilitation in order to prevent traffic jams on Korean expressways. Moreover, speedy and effective repair methods are required. Therefore, the use of bonded concrete overlay with ultra-rapid hardening cement has increased in an effort to reopen promptly the expressways in Korea. However, mobile mixer is required for ultra-rapid hardening cement concrete mixing in the construction site. The use of mobile mixer causes various disadvantages aforementioned such as limitation of the construction supply, open-air storage of mixing materials, increase in construction cost, and etc. In this study, therefore, hydration accelerator in-situ mixing on polymer modified concrete produced in concrete plant is attempted in order to avoid the disadvantages of existing bonded concrete overlay method using ultra-rapid hardening cement. METHODS : Bonded concrete overlay materials using ultra-rapid hardening cement should be meet all the requirements including structural characteristics, compatibility, durability for field application. Therefore, This study aimed to evaluate the application of hydration accelerator in-situ mixing on polymer modified concrete by evaluating structural characteristics, compatibility, durability and economic efficiency for bonded concrete overlay. RESULTS : Test results of structural characteristics showed that the compressive, flexural strength and bond strength were exceed 21MPa, 3.15MPa and 1.4MPa, respectively, which are the target strengths of four hours age for the purpose of prompt traffic reopening. In addition, tests of compatibility, such as drying shrinkage, coefficient of thermal expansion and modulus of elasticity, and durability (chloride ions penetration resistance, freezing-thawing resistance, scaling resistance, abrasion resistance and crack resistance), showed that the hydration accelerator in-situ mixing on polymer modified concrete were satisfied the required criteria. CONCLUSIONS : It was known that the hydration accelerator in-situ mixing on polymer modified concrete overlay method was applicable for bonded concrete overlay and was a good alternative method to substitute the existing bonded concrete overlay method since structural characteristics, compatibility, durability were satisfied the criteria and its economic efficiency was excellent compare to the existing bonded concrete overlay methods.