Browse > Article
http://dx.doi.org/10.6106/KJCEM.2022.23.6.065

Development of Performance Indicators on Private Building Construction Sites using Supervisory Report  

Sung, Yookyung (Department of Engineering & Management, Construction & Economy Research Institute of Korea)
Hur, Youn Kyoung (Department of Construction Economic & Finance, CERIK, Construction & Economy Research Institute of Korea)
Lee, Seung Woo (Department of Construction Economic & Finance, CERIK, Construction & Economy Research Institute of Korea)
Yoo, Wi Sung (Department of Construction Economic & Finance, CERIK, Construction & Economy Research Institute of Korea)
Publication Information
Korean Journal of Construction Engineering and Management / v.23, no.6, 2022 , pp. 65-75 More about this Journal
Abstract
As performance measurement is important for systematic management, the key indicators for performance measurement have been consistently researched in the construction industry. However, there are only a few cases in which performance measurement is performed because it requires strenuous efforts to collect data for measurement. Unlike the public sector, which has been collecting project data through laws, the private sector has very little data to measure performance. In contrast, supervision work concerns important data necessary for the performance management on building construction sites in accordance with the Building Act. Therefore, in this study, we used the data from supervisory reports to measure the performance of private building projects. First, we derived 6 performance areas and 15 indicators through a few rounds of expert group discussions and 2 surveys. Then, we identified the performance indicators with high feasibility of data collection and computed their degree of significance via the analytic hierarchy process. It is expected that the performance indicators and their computational processes derived in this study can be used to systematically measure the performance and aid the speedy diagnosis of private building construction sites.
Keywords
Performance Indicators; Performance Measurement; Supervisory Report; Building Project;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Chan, A.P.C., Scott, D., and Chan, A.P.L. (2004). "Factors affecting the success of a construction project." Journal of Construction Engineering and Management, ASCE, 130(1), pp. 153-155.   DOI
2 Choi, J.H., Sohn, H.W., and Kim, S.K. (2011). "Key Performance Indicators of Building Project." Journal of the Korea Institute of Building Construction, JKIBC, 11(1), pp. 61-72.   DOI
3 Jang, D.C., Lee, Y.S., Kang, T.K., Chin, K.H., Oh, E.H., Lee, D.H., Jung, I.S., Kim, S., Kim, J.Y., and Park, W.Y. (2015). "Advanced Research on Strategies for Construction Management." KICT 2015-115, KICT.
4 Jeon, M.Y., and Yu, J.H. (2012). "A model for developing composite indicators for construction project performance evaluation." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 28(7), pp. 81-90.   DOI
5 Kim, W.S., Koo, K.J., and Hyun, C.T. (2003). "A study on the selection of post-evaluation factors for the building construction." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 19(12), pp. 171-178.
6 Lee, H.G., Lee, H.C., and Lee, D.E. (2015b). "Developing IoTbased construction progress measurement prototype." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 31(11), pp. 79-89.   DOI
7 Lee, K.W., Hong, H.U., Park, H., and Han, S.H. (2011). "Developing a program performance management framework for mixed-use development in urban regeneration projects." Korean Journal of Construction Engineering and Management, KICEM, 12(1), pp. 141-152.   DOI
8 Shin, Y.I., and Kim, H.S. (2004). "Performance measurement techniques and best practice in construction projects." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 20(3), pp. 109-116.
9 Yu, I.H., Kim, K.R., Jung, Y.S., and Chin, S.Y. (2005). "Key performance indicators for developing construction performance index." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 21(2), pp. 139-150.
10 Yu, I.H., Kim, K.R., Jung, Y.S., and Chin, S.Y. (2006). "Analysis of quantified characteristics of the performance indicators for construction companies." Korean Journal of Construction Engineering and Management, KICEM, 7(4), pp. 154-163.
11 Lee, D.E., Yi, C.Y., and Gwak, H.S. (2015a). "Multi-objective optimization system for time-cost-environmentquality trade-off in construction project." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 31(1), pp. 79-88.   DOI
12 Park, M., Kim, N., Lee, H.S., Ahn, C., and Lee, K.S. (2009). "Construction project performance management using BSC and data warehouse." Korean Journal of Construction Engineering and Management, KICEM, 10(2), pp. 14-25.
13 Cha, H.S., and Kim, T.K. (2008). "Developing measurement system for key performance indicators on building construction project." Korean Journal of Construction Engineering and Management, KICEM, 9(4), pp. 120-130.
14 Construction Industry Institute (2014). "CII 10-10 Program." The University of Texas at Austin, (Aug. 1, 2022).
15 Kang, W.S., and Sin, H.R., (2013). "The Strategies for Securing Payments and Equitability in Private Construction." Construction & Economy Research Institute of Korea.
16 Lee, D.H., Lee, K.S., Kim, K.H., and Lee, K.W. (2020). "The strategy establishment for post-construction evaluation and management center." KICT 2020-187, KICT.
17 Lim, W., Jung, J., and Lee, H. (2015). "Extraction of the key performance indicators of construction management using balanced score card." Korean Journal of Construction Engineering and Management, KICEM, 16(6), pp. 22-30.   DOI