• Title/Summary/Keyword: speedy construction

Search Result 42, Processing Time 0.022 seconds

A Study on the Impact to Safety Management and the Prevention Measure by the Speedy Construction Work (돌관공사가 안전관리에 미치는 영향 및 예방대책에 관한 연구)

  • Ha, Haeng-Bong;Bang, Myung-Seok;Lim, Kyu-Won
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.243-254
    • /
    • 2013
  • Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.

  • PDF

A Study on the Impact to Safety Management by the Speedy Construction Work and the Prevention Measure (돌관공사가 안전관리에 미치는 영향 및 예방대책에 관한 연구)

  • Ha, Haeng-Bong;Bang, Myung-Seok
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.2
    • /
    • pp.143-149
    • /
    • 2013
  • Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.

A study on effects of the prevention of rush work of construction sites on human accidents (건설 현장 강행공사 방지가 인적사고에 미치는 영향에 관한 연구)

  • Lee, Sung-Il;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.27-37
    • /
    • 2017
  • In the construction sites, rush (speedy construction) work have recently been overused because of budget reductions by reducing the construction duration after the long-term economic recession and construction business stagnation with institutional change including the instruction of the duration shortening bidding system and the introduction of the post-construction sales system by the Korea Research Institute for Human Settlements. Due to this, negligent accidents have frequently occurred by forcing manpower, equipment, finance, and material procurement and pressing ahead with impractical construction wok at night according to the reduction of construction schedules. Therefore, this paper has the necessity of this study to seek for alternatives to prevent negligent accidents by finding factors related to rush work in the reality that the importance for preventing negligent accidents is more emphasized while they have not been reduced in construction sites.

A Study on Speedy Water Content Measurement Method for Soils (흙의 급속 함수비 측정방법에 관한 연구)

  • Park, Sung-Sik;Kim, Ju-Young;Lee, Sae-Byeok
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.1
    • /
    • pp.57-65
    • /
    • 2017
  • During a construction of embankment, sub base, or retaining wall backfill, the speedy measurement of water content is necessary. In this study, a test method for field determination of water content of soil by the calcium carbide gas pressure (speedy water content measurement method) was evaluated for its reliability and accuracy. Dry oven and microwave oven methods were also used for water content measurement. In the test, weathered granite and Nakdong River sand in the site and kaolinite were used for water content measurement. The mass of 20, 22, 24, 26, 28, and 30 g of soil was respectively tested for 1, 3, and 5 min. The effect of each sample on water content was compared one another and analyzed. As the mass and testing time increased, the water content increased. The amount of soil was more important factor than testing time for the speedy water content measurement. In order to obtain similar result to that of dry oven method, 3 min of testing time with 24 g of soil was necessary for weathered granite classified as SM and 3 min with 30 g for Nakdong River sand classified as SP. For Nakdong River sand with 20-50% of kaolinite, the water content by speedy measurement increased as the clay content increased.

A Field Survey on the Development of Safety Management Information System in the Construction Management (건설사업관리(CM) 안전관리 정보시스템 개발에 관한 조사연구)

  • Kim, Young-Soo;Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.2
    • /
    • pp.75-87
    • /
    • 2004
  • This study suggests a safety management model for construction management (CM) suitable to domestic conditions so that inefficiency resulted from the operation of construction projects by public and private indtitutes according to different systems can be eliminated for the securing of systematic and efficient safety managment. Based on the suggested safety management model, this study also develops a safety management information system that can efficiently and consistently manage and maintain a large quantity of information, and give necessary supports in a speedy way in the managing of construction projects.

A Study on the Set up of Safety Management Model and Safety Management Information System in the Construction Management (건설사업관리(CM)에서의 안전관리모델과 안전관리정보시스템 구축에 관한 연구)

  • 김영수;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.4
    • /
    • pp.45-61
    • /
    • 2003
  • This study suggests a safety management model for construction management (CM) suitable to domestic conditions so that inefficiency resulted from the operation of construction projects by public and private institutes according to different systems can be eliminated for the securing of systematic and efficient safety management. Based on the suggested safety management model, this study also develops a safety management information system that can efficiently and consistently manage and maintain a large quantity of information, and give necessary supports in a speedy way in the managing of construction projects.

Analysis of Supervisory Report for Performance Measurement in the Private Building Construction Sites (민간 건축현장 성과측정을 위한 감리보고서 활용성 분석)

  • Sung, Yookyung;Hur, Youn Kyoung;Lee, Seung Woo;Yoo, Wi Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.217-218
    • /
    • 2022
  • Supervision work deals with important data necessary for the performance management on building construction sites in accordance with the Building Act. Therefore, this study attempts to use the data from supervisory reports to measure the performance of private building projects. Performance measurement is important for systematic management. However, there are only a few cases in which performance measurement is performed because it requires strenuous efforts to collect data for measurement. First, this study derived 6 performance areas and 15 indicators through a few rounds of expert group discussions. Then, we confirmed the performance indicators with high feasibility of data collection through a survey of supervision experts. It is expected that the data of supervisory reports can measure systematically performance and assist in speedy diagnosis of private building construction sites.

  • PDF

Development of Tunnel Convergence Measuring System (터널의 내공변위 계측 시스템 개발)

  • 정성혁;박찬홍;이재기
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2004.03a
    • /
    • pp.607-612
    • /
    • 2004
  • Together with the requirements of tunnels, its construction methods and technologies have been pretty much developed, but frequent accidents happened under the constructions are just one of important problems which should be improved. To detect the potential hazardous factors in or ahead of time, speedy and accurate measurement are absolutely required, but currently surveying method using tapes, level and total station, has been generally taken in measuring of tunnel convergence and crown. The purpose of this study is, as using of 'Industrial photogrammetry' system which is supplying more accuracy and speedy in the measure of tunnel convergence, aimed at promotion of tunnel measurement technique and development in unmanned automatic measuring system in the future finally.e finally.

  • PDF

Tunnel Convergence and Crown Observation using Industrial Photogrammetry (산업사진측량을 이용한 터널의 천단 및 내공 변위 관측)

  • Jung Sung Hyuk;Lee Jae Kee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.22 no.3
    • /
    • pp.209-215
    • /
    • 2004
  • Together with the requirements of tunnels, its construction methods and technologies have been pretty much developed, but frequent accidents happened under the constructions are just one of important problems which should be improved. To detect the potential hazardous factors in or ahead of time, speedy and accurate observation are absolutely required, but currently surveying method using tapes, level and total station, has been generally taken in measuring of tunnel convergence and crown. The purpose of this study is, as using of industrial photogrammetry system which is supplying more accuracy and speedy in the measure of tunnel convergence and crown. From the result of this study, we have got up to 1/20,000 accuracy and totally 6 minutes, from picturing 5 sections by one person to data edition, has been taken except setting targets.

A Study on the Online Fault Detection System to construct the knowledge based Maintenance System of Intelligent Highway Information System (지능형 도로정보체계의 유지관리 지식기반 구축을 위한 온라인 고장검출 시스템 연구)

  • Ryu, Seung-Ki;Choi, Do-Hyuk;Choi, Tae-Soon;Moon, Hak-Yong;Kim, Young-Chun;Hong, Gyu-Jang
    • Proceedings of the KIEE Conference
    • /
    • 1999.07b
    • /
    • pp.677-679
    • /
    • 1999
  • This paper introduces a implementation of fault detection for national highway line 3. Fault detection system was installed and operated on national highway line 3, environmental elements caused by abnormal status or faults has often happened. Therefore, the function of fault detection system is to speedy notify fault site, cause as well as scale of fault to manager. Though the fault detection and diagnosis system has been imported in the field of process of water and electric power, it is just beginning step in the field of ITS(Intelligent Transportation Systems). In general, Maintenance system is performed the online/offline process of detection, diagnosis and measure. This paper is studied online detection process, which is realtime remote detection.

  • PDF