• Title/Summary/Keyword: software project planning

Search Result 97, Processing Time 0.031 seconds

CONSTRUCTION BUSINESS PROCESS AUTOMATION USING WORKFLOW TECHNOLOGY

  • Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.569-574
    • /
    • 2005
  • This paper presents the core technology of Construction Business Process Automation to model and automate construction business processes. Business Process Reengineering (BPR) and Automation (BPA) have been recognized as one of the important aspects in construction business management. However, BPR requires a lot of efforts to identify, document, implement, execute, maintain, and keep track thousands of business processes to deliver a project. Moreover, existing BPA technologies used in existing Enterprise Resource Planning (ERP) systems do not lend themselves to effective scalability for construction business process management. Application of Workflow and Object Technologies would be quite effective in implementing a scalable enterprise application for construction community. This paper present the technologies and methodologies for automating construction business processes by addressing how: 1) Automated construction management tasks are developed as software components, 2) The process modeling is facilitated by dragging-and dropping task components in a network, 3) Raising business requests and instantiating corresponding process instances are delivered, and 4) Business process instances are executed by using workflow technology based on real-time simulation engine. This paper presents how the construction business process automation is achieved by using equipment reservation and cancellation processes simplified intentionally.

  • PDF

Finite Element Analysis of Carbon Fiber Composite Sandwich Panels Subjected to Wind Debris Impacts

  • Zhang, Bi;Shanker, Ajay
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.436-442
    • /
    • 2022
  • Hurricanes and tornadoes are the most destructive natural disasters in some central and southern states. Thus, storm shelters, which can provide emergency protections for low-rise building residents, are becoming popular nowadays. Both FEMA and ICC have published a series of manuals on storm shelter design. However, the authors found that the materials for related products in the market are heavyweight and hard to deliver and install; renovations are necessary. The authors' previous studies found that lightweight and high-performance composite materials can withstand extreme wind pressure, but some building codes are designated in wind-borne debris areas. In these areas, wind debris can reach greater than 100 mph speed. In addition, the impact damage on the composite materials is an increasing safety issue in many engineering fields; some can cause catastrophic results. Therefore, studying composite structures subjected to wind debris impact is essential. The finite element models are set up using the software Abaqus 2.0 to conduct the simulations to observe the impact resistance behavior of the carbon fiber composite sandwich panels. The selected wood debris models meet the FEMA requirements. The outcome of this study is then employed in future lab tests and compared with other material models.

  • PDF

An Analysis of Risk Factors of a Construction Project through Execution Plan (실행분석을 통한 건설 프로젝트의 위험 요인 분석)

  • Park Young-Min;Kim Soo-Yong;Kim Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.139-149
    • /
    • 2005
  • The major purpose of construction project management is to meet defined targets(scope or quality) on schedule and budget. Korean construction industry is suuering from lower productivity as compared to other industry sectors. 'Management software' of the construction industry has not been developed as fast as hardware in the aftermath of compressed economic development following the Korean War. Therefore, this study is intended to compare project execution at planning phase and at completion phase and identifying the risk factor of construction projects. Construction projects are more extensive and long-winding than any other projects and stake holders of complex interests are often involved. In this study, we identified and analyzed risk factor for domestic building construction projects and outputs of this study will be conducive to the improvement of construction management processes in the future.

A Study on ERP Package Assessment Model in Business Firms

  • Lee, Sun-Kyu;Yim, Ki-Heung
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.11a
    • /
    • pp.343-358
    • /
    • 2004
  • Many IT specialists say that ERP (Enterprise Resource Planning) is the best way to manage resources in enterprise effectively. Actually lots of companies are using ERP solutions in the hope of getting competitiveness and employing global standard business practice. Wishing to take advantage of ERP S/W, companies have a preference for purchasing it and outsourcing ERP project. This paper is focusing on ERP Package assessment model in business firms. This paper finds out what differences there are in purchasing ERP S/W for organization characteristics and building characteristics, and suggests some guidelines of S/W development to venders. The results would be strong implications for ERP vendors. Especially this paper identify what the reasons and the checkpoints are when firms introduce ERP S/W. To do this, this paper used empirical data obtained from companies in South Korea and analyzed it using statistical software.

  • PDF

A Breakeven Analysis Using the Excel for an Engineering Project (Excel을 이용한 공학적 투자사업의 손익분기점분석)

  • Kim, Jin-Wook;Lee, Hyun-Ju;Kim, Jin
    • IE interfaces
    • /
    • v.15 no.3
    • /
    • pp.279-285
    • /
    • 2002
  • A break-even analysis is a method used widely for profit planning or decisions in most companies. It is useful tool in financial studies because it is simple and offers useful insights from a modest amount of data. Although it is widely used, it has some weaknesses. It is limited in particular to the analysis for a short term time horizon or one period. We suggest a new break-even procedure to analyze projects with a long term time horizon as keeping the simplicity of a conventional break-even analysis. We will make efforts doing to include actual data for a cost or an income as much as possible rather than developing a mathematical model to improve unreality of a traditional break-even analysis. Also, we will use the spreadsheet software to solve problems.

A Study on ERP package Assessment Model in Business Firms

  • Yim, Ki-Heung
    • Journal of Digital Convergence
    • /
    • v.2 no.2
    • /
    • pp.101-118
    • /
    • 2004
  • Many IT specialists say that ERP (Enterprise Resource Planning) is the best way to manage resources in enterprise effectively Lots of companies are using ERP solutions in the hope of getting competitiveness and employing global standard business practice. Wishing to take advantage of ERP S/W, companies have a preference for purchasing it and outsourcing ERP project. This paper focuses on ERP Package assessment model in business firms. This paper finds out what differences there are in purchasing ERP S/W for organization characteristics and building characteristics, and suggests some guidelines of S/W development to vendors. The results would be strong implications for ERP vendors. Especially this paper identifies what the reasons and the checkpoints are when firms introduce ERP S/W. To do this, this paper uses empirical data obtained from companies in South Korea and analyzes it using statistical software.

  • PDF

The Study on Equipment Qualification of Emergency Diesel Generator Excitation Control System for Nuclear Power Plant (I) (원전 디젤발전기 여자시스템 기기검증시험에 관한 연구(I))

  • Lee, Joo-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2007.04a
    • /
    • pp.143-145
    • /
    • 2007
  • The development of excitation control system (ECS) for emergency diesel generator in nuclear power plant is the replacement project of existing control system to resolve the maintenance problems caused by aging and obsolescence, The excitation control system is classified as a safety-related system. To guarantee the performance of developing excitation control system is equal to or higher than that of other systems, establishing the quality assurance scheme, doing software verification and validation activities, and planning equipment qualification. In this paper, we'd like to introduce the equipment qualification of excitation control system.

  • PDF

A Study on Purchasing an ERP S/W in Business Firms

  • Yim, Ki-Heung;John, Yong-Jean
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2003.12a
    • /
    • pp.433-449
    • /
    • 2003
  • Many IT specialists say that ERP (Enterprise Resource Planning) is the best way to manage resources in enterprise effectively. Actually lots of companies are using ERP solutions in the hope of getting competitiveness and employing global standard business practice. Wishing to take advantage of ERP S/W, companies have a preference for purchasing it and outsourcing ERP project. This paper is focusing on purchasing ERP S/W in business firms. This paper finds out what differences there are in purchasing ERP S/W for organization characteristics and building characteristics, and suggests some guidelines of S/W development to venders. The results would be strong implications for ERP vendors. Especially this paper identify what the reasons and the checkpoints are when firms introduce ERP S/W. To do this, this paper used empirical data obtained from companies in South Korea and analyzed it using statistical software.

  • PDF

A Software Manpower Profile for Software Development Life Cycle (소프트웨어 개발 라이프사이클 인력 프로파일)

  • Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.11D no.5
    • /
    • pp.1123-1132
    • /
    • 2004
  • Successful project planning relies on a good estimation of the manpower required to complete a project. The good estimation can be derived from Rutnam's Rayleigh Model or Phillai et al.'s Gamma Model. These models only can be applied for the projects which the need of manpower is increased exponentially and the highest of manpower is required at the end of development phase. However, in a practical project, most manpower is required during development phase and a small amount of manpower is assigned during maintenance phase. In addition, the Waterfall Model and Unified Process only can be adopted for development phase. So the current development environments cannot be adopted into the existing manpower distribution models which the highest manpower is required at the end of development phase. This paper suggests an appropriate model for development phase to solve this problem. First, the appropriate manpower distribution for development phase of the Waterfall model was derived from Putnam's manpower distribution and then manpower distribution of development phase was derived for Unified Process. After comparing the required manpower of two Processes, total manpower distribution is similar each other even though the required manpower and task is different for each point of development phase. From this result, a unified model is derived and it can be applied for both development processes.

A Proposal of the Usage Metering Functions on Cloud Computing-Based Building Information Modeling (BIM) and the Law for the Open BIM Ecosystem (열린 BIM 생태계 조성을 위한 클라우드 컴퓨팅 기반 BIM 서비스 환경의 사용량 측정 기술 및 법 규정 제안)

  • Kim, Byungkon;Kim, Jongsung
    • Journal of KIBIM
    • /
    • v.6 no.3
    • /
    • pp.49-56
    • /
    • 2016
  • As project opportunities for the Architecture, Engineering and Construction (AEC) industry have grown more complex and larger, the utilization of Building Information Modeling (BIM) technologies for three-dimensional (3D) design and simulation practices has been increasing significantly; the typical applications of the BIM technologies include clash detection and design alternative based on 3D planning, which have been expanded over to the technology of construction management in the AEC industry for virtual design and construction. As for now, commercial BIM software has been operated under a single-user environment, which is why initial costs for its introduction are very high. Cloud computing, one of the most promising next-generation Internet technologies, enables simple Internet devices to use services and resources provided with BIM software. Recently in Korea, studies to link between BIM and cloud computing technologies have been directed toward saving costs to build BIM-related infrastructure, and providing various BIM services for small- and medium-sized enterprises (SMEs). This study addressed development of the usage metering functions of BIM software under cloud computing architecture in order to archive and use BIM data and create an optimal revenue structure so that the BIM services may grow spontaneously, considering a demand for cloud resources. For the reason, we surveyed relevant cases, and then analyzed needs and requirements from AEC industry. Based on the relevant cases, customizing for cloud BIM and design for the development was performed. We also surveyed any related-law to support cloud computing-based BIM service. Finally, we proposed herein how to optimally design and develop the usage metering functions of cloud BIM software.