• Title/Summary/Keyword: small building project

Search Result 124, Processing Time 0.023 seconds

A Study on the System Improvement Plan for an Efficient Market Maintenance Project (시장정비사업의 효율적 실시를 위한 제도개선방안 연구)

  • Kim, Seung-Hee;Kim, Young-Ki
    • Journal of Distribution Science
    • /
    • v.11 no.4
    • /
    • pp.23-35
    • /
    • 2013
  • Purpose - This paper attempts to identify the problems and limitations of a market maintenance project conducted according to the 「Special Act for the Development of Traditional Markets and Shopping Street」 and to present a revised direction for the special law and lay the groundwork for market maintenance projects to be promoted smoothly. Research design, data, and methodology - The revised direction for the legislation and the proposal were written based on an investigation of the problems and the legal system, and proposed measures for market maintenance operation and system improvements to derive the improvements needed for market maintenance projects. Results - A market maintenance project has been conducted as a means to reinvigorate traditional markets that are economically depressed, and to revive the local economy. It was largely conducted in the form of reconstruction and redevelopment and represents the interests of landowners and merchants. Thus, it is most likely to contribute to the gradual disappearance of traditional markets. First, as part of a market maintenance project, many companies are building multipurpose buildings or high-rise residential buildings to increase profits. In these high-rise buildings, they can raise rents, which may not be affordable for some existing small businesses. To solve such problems, the large-scale store registration requirement needs to be relaxed or abolished once the market maintenance project is completed. If the large-scale store registration requirement is to be abolished, the term 'large retail store' should be changed in the 「Special Act for the Development of Traditional Markets and Shopping Street」. After registration, the Small and Medium Business Administration should train merchants, offer consultations, and support events, to the extent that the existing traditional market management modernization project permits, and further continue to manage and support its ongoing activities. However, unless large-scale store registration is abolished, adding an exception clause in the special law to relax large-scale store registration criteria, and permitting changes to building use is another option. At the end of a market maintenance project, empty stores should be purchased by the Small and Medium Business Administration, and local government, etc., at the actual construction cost, to utilize them as public rental shopping areas, which in turn may be re-utilized as a temporary market for another market maintenance project. The second problem in market maintenance projects is merchant-protection. Currently, the special law prescribes that a temporary market be created for merchants to conduct business during the rental period of a market maintenance project. Conclusions - In reality, a market maintenance project is conducted usually in big metropolitan cities with 500,000 residents or more. The main building type created under these projects is a multipurpose building. For this reason, it is very difficult to secure a location for a temporary market in the surrounding area of such a project. To solve this problem, this study suggests 'public rental shopping areas' as mentioned above.

  • PDF

A Compensation Method and Comparative Analysis of Historical Unit Price Considering Work Types for Large and Small-Scale Projects (공종별 특성을 고려한 대·소규모 공사의 실적공사비 비교 및 보정방안)

  • Hong, Sung Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.293-303
    • /
    • 2014
  • Recent historical unit price is presented by the Korea Institute of Construction Technology (KICT) and it is analyzed by data from large-scale projects. Therefore it has problem applying to small-scale projects. To indicate the problem, the study compared historical unit price of large-case project and small-case project in the case of civil engineering work, building construction, and mechanical facility work. As a result, average historical unit price of small-scale project was 26.6% higher than large-scale project. On the other hand, difference on the labor cost was 18.4%, difference on material cost and overheads were 8.18%. Moreover, the study proposed compensation method to correct to apply recent historical unit price to small-scale project.

Combine Method of Small Unit Modules for Urban Regeneration Projects (도시재생을 위한 소형 유닛모듈 결합방법)

  • Kim, Kyoon-Tai;Jun, Young-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.243-244
    • /
    • 2018
  • This study focused on the fact that there are a lot of alleys in some areas of the Urban Renewal New Deal project. In this study, we proposed a method to construct a spatial module by combining small modules. It is expected that the combination of small modules developed in this way will help revitalize the New Deal of Urban Regeneration. In the future, additional joint details will be developed, structure review will be conducted.

  • PDF

Development and Application of Guideline for Construction Management of School Building Seismic Retrofit (학교 건축물 내진보강 시공현장 관리를 위한 가이드라인 개발 및 적용에 관한 연구)

  • Hwang, Eun-A;Lee, Byoung-Ho;Park, Ku-Byoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.36-37
    • /
    • 2020
  • The government seismic retrofit project for educational facilities is progressing more actively due to the 2018 Pohang earthquake. It is most important that seismic retrofit constructions are conformed to seismic design to achieve the desired purpose of the project as reduce direct damage caused by earthquake. However, the construction supervision system is not mandatory for the retrofit construction site of small buildings including school buildings according to applicable laws and regulations. The purpose of this study was to develop a guide for constructions management of school building seismic retrofit. In order to achieve this goal, the survey on the construction site was conducted and various problems related to the construction site of school building seismic retrofit was derived Additionally, the systematic checklist was presented according to the user and seismic reinforcement method.

  • PDF

Application of Data Dictionary to BIM for Small and Medium Project (중소규모 사업용 BIM을 위한 데이터 사전의 활용)

  • Lee, Hwan Woo;Lee, Kyung Sub;Kim, Kwang Yang
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.6
    • /
    • pp.431-438
    • /
    • 2013
  • The systemization of construction information is required over whole life cycle of facilities to improve productivity of construction industry. BIM(Building Information Modeling) is a technology to manage information based on 3D information model. It has been actively suggested as one of the alternatives. However, it may be currently concentrated on the large project while the small and medium project based on BIM are slightly treated in indifference. In the case of small and medium project, the loss of information has been occurred more seriously than large project. However, it is hard to introduce BIM to the small and medium companies due to the lack of investment resources. This study has been performed to set up information management system based on BIM considering characteristics of small and medium project without excessive investment. In this study, pseudo BIM is defined as BIM for small and medium project. The concept of pseudo BIM has been suggested. The PLIB of ISO and construction information classification system of MOLIT in Korea are used to construct data dictionary for pseudo BIM. A pilot test is performed to verify the effectiveness of pseudo BIM.

Integrating Order Process in Residential Building Construction (주거시설공사의 하도급 통합발주 프로세스 개발)

  • Kim, Yongl-Won;Park, Hyung-Jin;Jung, Jin-Hyun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.84-85
    • /
    • 2013
  • Integrating multi-trade works system helps to reduce to minimize the conflict of subcontract business and improve communication to increase productivity of construction. However it takes such a big risk if subcontract of integrating multi-trade works went bankrupt during the project so some of construction companies executed to only small project and it's not sufficient to adopt overall project. This paper suggested the improvement scheme of work classification integrating multi-trade works, which takes a consideration into work zoning in order to apply current work situation.

  • PDF

Derivation of BIM Project Properties Through an Analysis of On-Line BIM Project Cases (온라인 BIM(Building Information Modeling) 사례 분석을 통한 BIM 프로젝트 속성정보 도출)

  • Lee, Kyungha;Uhm, Miyoung;Lee, Hwayeon;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.194-195
    • /
    • 2015
  • When starting a new project, generally similar existing projet are searched. As Building Modeling Information(BIM) has short history and experience, the dependence on similar project is high. Small and medium sized design companies are depending on website search tool for information of BIM project besides companies maintaining the Database(DB) from lots of project experience. However, the information level and contents provided by websites differ drastically from each other which makes it difficult to utilize the information and apply cases. Furthermore, the different classification system of the sites makes the situation even worse. Therefore, we collected and analyzed over 100 BIM cases from 18 global websites, to develop a system for BIM case application. Result showed that over 90% of our subject pool provided basic information including the construction type, characteristics of the client (public/ private), location of the project, and detailed information such as primary usage. Moreover, the reasons for applying BIM where to solve problems of geometric design, building system like MEP and construction. Furthermore, there was a contrast between cases conducted only within Korea and cases conducted with other countries. While there was almost always helpful information regarding the administrative steps for Korean BIM cases, there was close to no information for projects carried out outside of Korea. These results could contribute to verifying the trend of information provision of the websites for BIM projects data, and this is believed to be helpful for developing an application system for BIM cases which have an organized information provision system and level as well as for bench marking.

  • PDF

A Case Study on the Application of Digital-Twin to Small-size Building Remodeling Processes (디지털 트윈을 적용한 소규모 건축물 대수선 프로세스 적용 사례 연구)

  • Park, Sung-Man;Kim, Yang-Gil;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.13 no.1
    • /
    • pp.1-12
    • /
    • 2023
  • The number of old buildings in Korea is increasing. According to a report from the Ministry of Land, Infrastructure and Transport, the proportion of old buildings increased from 29.0% in 2005 to 37.8% in 2009. However, the ratio of repairs to improve usability and improve the environment through problem improvement The proportion of old buildings was 72% in 2010, but decreased to 38% in 2020 and does not exceed 40%. The reason is that the difficulty of remodeling old buildings is more difficult than repairing new ones, and business estimates are difficult to predict. Accurately reflecting the current condition of a building in a repair project has a huge impact on time and budget. Accurate and detailed measurements are essential. Current repair methodologies require a lot of manpower, time and money to remodel an old building. Therefore, it is necessary to improve the remodeling methodology applied in the field. In this study proposed a Digital-Twin-based remodeling process that introduced various digital technologies such as 3D Scanning, BIM, Reverse Engineering, and Digital Fabrictation in consideration of the latest technologies used in recent construction projects. In addition, the process proposed in this study was applied to an actual small-scale building remodeling project and the results were analyzed. In addition, useful basic data were provided for the establishment of plans related to the repair process of buildings in the future.

A Study on Estimating the Contingency Cost of Small Construct Project (소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구)

  • 송진우;표영민;박성호;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

BIM-Based Generation of Free-form Building Panelization Model (BIM 기반 비정형 건축물 패널화 모델 생성 방법에 관한 연구)

  • Kim, Yang-Gil;Lee, Yun-Gu;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.19-31
    • /
    • 2022
  • With the development of 3D-based CAD (Computer Aided Design), attempts at freeform building design have expanded to small and medium-sized buildings in Korea. However, a standardized system for continuous utilization of shape data and BIM conversion process implemented with 3D-based NURBS is still immature. Without accurate review and management throughout the Freeform building project, interference between members occurs and the cost of the project increases. This is very detrimental to the project. To solve this problem, we proposed a continuous utilization process of 3D shape information based on BIM parameters. Our process includes algorithms such as Auto Split, Panel Optimization, Excel extraction based on shape information, BIM modeling through Adaptive Component, and BIM model utilization method using ID Code. The optimal cutting reference point was calculated and the optimal material specification was derived using the Panel Optimization algorithm. With the Adaptive Component design methodology, a BIM model conforming to the standard cross-section details and specifications was uniformly established. The automatic BIM conversion algorithm of shape data through Excel extraction created a BIM model without omission of data based on the optimized panel cutting reference point and cutting line. Finally, we analyzed how to use the BIM model built for automatic conversion. As a result of the analysis, in addition to the BIM utilization plan in the general construction stage such as visualization, interference review, quantity calculation, and construction simulation, an individual management plan for the unit panel was derived through ID data input. This study suggested an improvement process by linking the existing research on atypical panel optimization and the study of parameter-based BIM information management method. And it showed that it can solve the problems of existing Freeform building project.