It is essential for geotechnical engineers to conduct studies and make predictions about the stability of slopes, since collapse of a slope may result in catastrophic events. The Gaussian process regression (GPR) approach was carried out for the purpose of predicting the factor of safety (FOS) of the slopes in the study that was presented here. The model makes use of a total of 327 slope cases from Iran, each of which has a unique combination of geometric and shear strength parameters that were analyzed by PLAXIS software in order to determine their FOS. The K-fold (K = 5) technique of cross-validation (CV) was used in order to conduct an analysis of the accuracy of the models' predictions. In conclusion, the GPR model showed excellent ability in the prediction of FOS of slope stability, with an R2 value of 0.8355, RMSE value of 0.1372, and MAPE value of 6.6389%, respectively. According to the results of the sensitivity analysis, the characteristics (friction angle) and (unit weight) are, in descending order, the most effective, the next most effective, and the least effective parameters for determining slope stability.
단일 기울기 ADC에 사용되는 램프 신호의 기울기는 공정과 주파수 변화에 민감하다. 이러한 변화는 ADC 이득 변화와 이미지 신호 프로세싱의 성능까지 영향을 준다. 본 논문에서는 자동 교정된 램프 신호를 이용한 단일 기울기 ADC를 이용하여 공정과 주파수 변화에 영향을 받지 않은 CMOS 이미지 센서를 제안하다. 본 논문에서 제안된 built-in-self-calibration (BISC) 구조는 공정과 주파수 변화에 상관없이 입력 조도별로 일정한 출력 값을 갖는 단일 기울기 ADC 동작을 가능하게 한다. 제안된 BISC를 탑재한 CMOS 이미지 센서는 $0.35{\mu}m$ 공정을 이용하여 제작하였다. 측정 결과는 제안된 구조가 공정이나 클럭 주파수의 변화에 따라 효과적으로 램프 기울기를 교정한다는 것을 보여준다. 칩 면적의 증가 정도는 $0.7\%$ 미미하였다.
Mt. Yokmang landscape design awarded first in [North container terminal site furtherance construction in Busan new port], design competition sponsoring in the Korea Container Terminal Authority in 2005. Design guideline was to propose the symbol of new port and to establish landscape plan in consideration of view and geological location. Because landscape plan required establishment of restoration plan for cutting slope, Mt. Yokmang became the major object. The purpose of planning are as follows. The first purpose is to minimize existent natural environment damage, and the second, to connect with ambit and create new image. The third is to provide place of rest and interchange for local resident. Reflecting stratum structure and landscape characteristics, cutting slope consisted of [utilization slope], [presentation slope], [landscape slope], and [ecological slope]. Vegetation design applied ecological restoration method through restoration of stratum, and eve environment-friendly afforestation, planned program that can connect area with existing ecosystem. In process that decides form of the cutting slope, analyze view structure and visual exposure in various access routes, sensitivity etc. was accomplished. Also, symbolic tower(Ocean Polaris) that presents in architecture and landscaping features, night landscape planning could gain synergy effect by keeping consistence with landscape and ecological planning. Passing through final design and construction process, I expect that the Mt. Yokmang will be a new landmark in Busan new port.
Dai, Ke;Huang, Wuhao;Wen, Ya;Xie, Yuru;Kim, Jung In
국제학술발표논문집
/
The 9th International Conference on Construction Engineering and Project Management
/
pp.1130-1137
/
2022
The Industry Foundation Classes (IFC) provides standardized product models for the building construction domain. However, the current IFC schema has limited representation for infrastructure. Several studies have examined the data schema for road and highway modeling, but not in a sufficiently comprehensive and robust manner to facilitate the overall integrated project delivery of road projects. Several discussions have focused on slope engineering for road projects, but no solution has been provided regarding the formalized parametric modeling up to now. Iterative design, analysis, and modification are observed during the process of slope design for road projects. The practitioners need to carry out the stability analysis to consider different road design alternatives, including horizontal, vertical, and cross-section designs. The procedure is neither formalized nor automated. Thus, there is a need to develop the formal representation of the product and process of slope analysis for road design. The objective of this research is to develop a formal representation (i.e., an IFC extension data schema) for slope analysis. It consists of comprehensive information required for slope analysis in a structured manner. The deliverable of this study contributes to both the formal representation of infrastructure development and, further, the automated process of slope design for road projects.
Numerous landslides had occurred in Kangwondo in July 2006 and several restoration works had been done. A-day-accumulative rainfalls from July 12 to July 13 and July 15 to July 16 were 176mm and 202mm respectively. Disaster sites at which slope failures were studied to main causes of slope failures by investigating characteristics of rainfall, geological formation, topography and ground surface exploration around the boundary of landslides. In this study, a series of slope restoration work process is presented for reference which about the landsliding area in Han-Gye-Ryeong to O-Saek in Kwangwon-do where one of the most severe damaged area in 2006. The slope restoration work process includes site investigation, analysis on affected factor, restoration or reinforcing method design, construction procedure and recent status of that area. Also several considering points are suggested while design and construction for the reference at the other restoration works.
This paper proposes a single slope A/D converter (SSADC) that is possible to process the signal of the ultraviolet, visible and infrared rays with a single chip. And the proposed SSADC is a type of single channel ADC. In the conventional SSADC, it is possible to process the only one signal with a kind of the sensor because the speed of the operating frequency and the slope of ramp signal generated by the ramp generator are fixed. In order to improve the disadvantages, a ramp generator which has variable slope in ramp function is designed and $3{\times}1$ MUX(multiplexer) is adopted so that we can change the speed of the operating frequency and the slope of ramp signal. Therefore, the multiple signal processing of the wanted sensors can be possible. The designed circuit is layout by the $0.35-{\mu}m$ CMOS 2-poly 4-metal technology process and is checked through DRC and LVS tools.
Since the cut slope has been big concern due to frequent failures, the government decided to include cut slopes in the“Act for Safety Control of Public Structures”. Based on the Act, the cut slope whose height is over 50m and length is over 200m should be inspected on the regular basis. According to the Act, KISTEC developed the objective evaluation method for the condition of cut slope. The evaluation method is divided into two categories: evaluation for damaged condition and evaluation for failure affecting factor. Based on the evaluation results, the cut slope is graded from A to E. In this study, the process to evaluate the cut slope condition and the evaluation criteria to divide the grade of cut slope are introduced.
Generally gneiss regions catagolized as metamorphic ground are very complicated and difficult for geotenical engineer to establish stability, this slopes include falt zone and many folding structures. therefore the slope in this study is very complicated and highly wheathered and framentation conditions are irregular by this study, we hope that geotechical engineers who are confronted with the same complicated slope as this slope are doing his job easily and they know which system are adequate to establish the slope stability in large-scale slope with complicated geological structure, and besides through our work flow and modeling process, we hope that our study can be useful for geotenical engineer who may work slope design and construct in complicated ground.
Heavy storms rainfall has caused many landslides and slope failures especially in the mountainous area of the world. Landslides and slope failures are common geologic hazards and posed serious threats and globally cause billions in monetary losses and thousands of casualies each year so that studies on slope stability and its failure mechanism under rainfall are being increasing attention of these days. Rainfall-induced slope failures are generally caused by the rise in ground water level, and increase in pore water pressures and seepage forces during periods of intense rainfall. The effective stress in the soil will be decreased due to the increased pore pressure, which thus reduces the soil shear strength, eventually resulting in slope failure. During the rainfall, a wetting front goes downward into the slope, resulting in a gradual increase of the water content and a decrease of the negative pore-water pressure. This negative pore-water pressure is referred to as matric suction when referenced to the pore air pressure that contributes to the stability of unsaturated soil slopes. Therefore, the importance is the study of saturated unsaturated soil behaviors in evaluation of slope stability under heavy rainfall condition. In an actual field, a series of failures may occur in a slope due to a rainfall event. So, this study attempts to develop a numerical model to investigate this failure mechanism. A two-dimensional seepage flow model coupled with a one-dimensional surface flow and erosion/deposition model is used for seepage analysis. It is necessary to identify either there is surface runoff produced or not in a soil slope during a rainfall event, while analyzing the seepage and stability of such slopes. Runoff produced by rainfall may result erosion/deposition process on the surface of the slope. The depth of runoff has vital role in the seepage process within the soil domain so that surface flow and erosion/deposition model computes the surface water head of the runoff produced by the rainfall, and erosion/deposition on the surface of the model slope. Pore water pressure and moisture content data obtained by the seepage flow model are then used to analyze the stability of the slope. Spencer method of slope stability analysis is incorporated into dynamic programming to locate the critical slip surface of a general slope.
강우에 의한 사면파괴의 초기단계 및 과정을 규명하기 위하여 실내 사면모델 시험결과를 분석하였다. 이 파괴 초기단계와 관련된 수리학적 상호관계를 파악하기 위해 인공강우 살포동안 사면모델 내 체적함수비 변화를 측정하는데 목적을 두었다. 사면파괴의 과정은 인공강우동안 사면 하단부의 유출면 발달에 의해 파괴를 발생시키는 요인으로 작용하였다. 따라서 국부적인 사면파괴를 예측하기 위해서는 강우에 의해 발생된 침투수의 침투특성에 대한 장기적인 계측이 매우 중요하다. 사면 내에서 강우에 의한 침윤선의 침투 및 지하수위 상승과 밀접한 연관성을 갖는 체적함수비 변화를 3가지의 침투변화(phase I, phase II, phase III로 나누어 사면파괴를 계측할 수 있는 수리학적 측면으로 접근하였다. 따라서 체적함수비가 급격히 증가하는 phase III 단계부터는 사면파괴 발생 가능성이 매우 증가함을 파악하였다. 그러므로 사면 내 체적함수비 변화를 연속적으로 계측함으로써 강우에 의한 사면파괴의 발생을 효율적이고 실질적으로 예측할 수 있을 것으로 판단된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.