• Title/Summary/Keyword: settlement project

Search Result 184, Processing Time 0.028 seconds

A Study on the Revitalization of the Private Subsidy for Environmentally Friendly Aquaculture (친환경양식어업육성 민간보조사업의 활성화 방안)

  • Kim, Kuk-Ju
    • The Journal of Fisheries Business Administration
    • /
    • v.50 no.4
    • /
    • pp.45-57
    • /
    • 2019
  • Effective implementation of private subsidy projects requires comprehensive expertise in the aquaculture and construction sectors to be provided to private subsidy operators, local government officials and others involved in budget execution and settlement. Due to the strengthening of laws and systems related to the execution of state subsidies since 2015, the efficient implementation of private-sector grant projects has been difficult for delays in projects, cancellations, and conflicts with local governments from lack of prior awareness and understanding of related regulations. It is expected that the government will be able to activate the project by analyzing the current status and problems of each phase of project implementation for improving quality internalization of the project effects, as well as quantitative growth of the private sector subsidy project for environmentally friendly aquaculture development projects.

Case studies on construction and design in Colombo port, Sri Lanka (스리랑카 콜롬보항만 시공 및 설계사례 (ELIPO 및 COLPO 현장))

  • Lee, Seung-Won;Chung, Yoon-Young;Lee, Gab-Yeol;Park, Kyoung-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.44-57
    • /
    • 2010
  • The purpose of this paper is to introduce case studies on 2 projects for the construction of port facilities in Colombo, Sri lanka. In Queen Elizabeth quay development project in 2000, the damage at the bottom of steel tubular piles were occurred when piles were driven into subsoil for piled wharf structure in Stage 1. In order to prevent same incident in Stage 2 & 3, the pile driveability analysis were executed by dynamic formulas, analysis program, test driving and pile load tests. Through pile driveability analysis, prevention plans were proposed. In Colombo port expansion project in 2008, the mv method was applied to predict a primary consolidation settlement of a subsoil under a breakwater in the calculation stage. The $m_v$ was estimated from results of cone penetration tests and the final settlement by consolidation was calculated with it.

  • PDF

Evaluation of performance of piled-raft foundations on soft clay: A case study

  • Khanmohammadi, Mohammadreza;Fakharian, Kazem
    • Geomechanics and Engineering
    • /
    • v.14 no.1
    • /
    • pp.43-50
    • /
    • 2018
  • Applicability of constructing piled raft foundations on soft clay has been given attention in recent years. Lack of sufficient stiffness for soil and thus excessive settlements to allow higher contribution of piles is the major concern in this regard. This paper presents a numerical investigation of performance of piled-raft foundations on soft clay with focusing on a case study. A 3D FEM numerical model is developed using ABAQUS. The model was calibrated by comparing physical and numerical modeling results of other researchers. Then the possibility of using piled-raft system in construction of foundation for a water storage tank in Sarbandar, Iran is assessed. Soil strength parameters in the numerical model were calibrated using the instrumentation data of a heavily instrumented preloading project at the construction site. The results indicate that choosing the proper combination of length and spacing for piles can lead to acceptable differential and total settlements while a high percentage of total bearing capacity of piles can be mobilized, which is an efficient solution for the project. Overall, the construction of piled-rafts on soft clays is promising as long as the total settlement of the structure is not imposing restrictions such as the common 25 mm allowable settlement. But instead, if higher allowable settlements are adopted, for example in the case of rigid steel tanks, the method shall be applicable with considerable cost savings.

Damage assessment of structures according to the excavation methods (굴착방법에 따른 구조물의 손상도 평가)

  • Jeon, Jae-Hyun;Park, Jong-Deok;Lim, Young-Duck;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.161-173
    • /
    • 2013
  • When the ground is excavated near the pre-existing structures due to the region restricted condition such as urban area, the ground will be released by the excavation and the temporary wall will be deformed depending on the earth pressure. In this case, issues can be created in terms of stability of pre-existing structures. Firstly, the laboratory model tests were carried out to investigate the ground surface settlement due to the ground excavation according to the excavation methods in this study. Using the ground surface settlement results from model tests, numerical analyses were carried out to study the structure deformation due to the ground excavation according to the excavation methods. Finally, using the structure deformation results from numerical analysis, the damage assessment of structures was carried out by using the strain damage estimation criterion.

Bounded Rationality under Analysis of Relative Priorities on Multi-cultural Policy (제한된 합리성 하에서 다문화 정책에 대한 상대적 우선순위 분석)

  • Jung, Seok-Hwan
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.11
    • /
    • pp.317-326
    • /
    • 2018
  • The purpose of this study is to develop an AHP model to evaluate the relative importance and priorities of multi-cultural policies under bounded Rationality. The results of the study are as follows. First, in the evaluation elements for each measurement area, the following are the stable social settlement support policy (1rank), social capability development policy of multi-cultural family second generation (2rank), socio-economic activity policy (3rank), collaborative governance policy enforcement(4rank). Second, the priority of the measurement element is as follows. social settlement service target expansion policy was proved to be the top priority project stable social settlement support policy aspect and social capacity development policies of the second generation of multi-cultural families, social support policy was most important evaluated. Active economic activity support policy was as the top priority project socio-economic activity policy, and construct cooperation system of policy practice main agents was proved to be the top priority collaborative governance policy enforcement. These results will contribute to explain the reality of multi-cultural policy.

The Evaluation Analysis of the Local Fishing Port Construction Project in Connection with Fishery and Fishing Village (어장·어촌과 연계한 지방어항건설사업의 평가분석)

  • Shin, Seung-Sik;Park, Ju-Sam
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.20 no.3
    • /
    • pp.369-380
    • /
    • 2008
  • The government has promoted the local fishing port construction project since 1972 for conquest of the crisis of the fishing village by withering of a fishery, the improvement in fishermen's living environment and quality of life, and promotion of fisheries. In order to estimate the local fishing port construction project objective and synthetically, and to grope for the method proposal of system establishment of the project, the monitoring survey was carried out. The monitoring survey was classified into the program and the performance monitoring. The program monitoring was carried out in order to investigate the project fit for the inhabitants of a fishing village. The performance monitoring was carried out in order to investigate the development latent powers, fishery latent powers, tourism latent powers of a fishing village, rural settlement conditions, etc. using various statistical materials. Since investigating the measured value before executing a policy was not completed, the project effect was compared with the measured value of other areas. According to the local fishing port construction project, the development latent powers, fishery latent powers, and tourism latent powers of the fishing village where the project was undertaken improved greatly, and income of the fishing village increased greatly. As a result of comparing project fit in order to evaluate the project, the project fit of the local fishing port construction project area was higher than the non-project area. Desirable method proposal of monitoring survey was established and the method for raising the efficiency of monitoring survey was extracted.

A Study on ERP System for EVMS in Project-based Industry (프로젝트형 산업의 EVMS을 위한 ERP 시스템에 관한 연구)

  • Park, Je-Won;Lee, Chang-Ho
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.343-348
    • /
    • 2010
  • Earned Value Management System(EVMS) is a highly efficient tool in the project management, but it cannot easily determine the Actual Cost due to the indistinct criteria and extensive data. This study introduces a EVMS for project management and its actual case based on EVMS and ERP system which some additional modules are installed for performance measurement. It is expected that this new method enables a company to improve transparency by specifying expense items in detail and to switch quarterly settlement to monthly by reducing the time of calculation.

  • PDF

A Study to Promote the EC Collaboration of the South and North Korea based on the Preemptive Dispute Resolution Policies (남북한 전자상거래 추진에 따른 활성화 방안 -분쟁방지를 위한 사전조정 기능을 중심으로-)

  • Choi, Yong-Rok
    • Journal of Arbitration Studies
    • /
    • v.16 no.3
    • /
    • pp.191-216
    • /
    • 2006
  • It has been talked about the responsibility of the South-North Korean e-market place(e-MP) collaboration project every you since 2003. However, the feasibility as the business has not been dealt with in detail due to the uncertain environment as well as the complicated procedures of the project. The research focuses on the workable mechanism of the South-North Korean E-Market Place collaboration project. The feasibility of the project results from the newly installed fiber telecommunication network as well as the 1 billion dollars of the trading volume between South and North Korea. The research analyzes on the capabilities as well as willingness of the South and North Korea for the e-MP, and concludes with two paradigms of the future tasks. First, the unified but step-wise structure should be made to promote the project by the political committee (South and North Korea EC Committee) and the economical administration body (South and North Korea EC Corporation). Second, the market-oriented resolution system such as South and North Korea Arbitration Body should be involved to create legal environment. Above all, the discussion should be on the main body of e-MP settlement to abolish the psychological as well as practical barriers to enter the South-North Korean electronic commerce.

  • PDF

A Estimation Method of Settlement and The Behaviour Characteristics of Granular Compaction Pile Reinforced with Uniformly Graded Permissible Concrete (등입도 투수성 콘크리트 보강 조립토 다짐말뚝의 거동특성 및 침하량 평가기법)

  • Kim, Jeong-Ho;Hwang, Jung-Soon;Kim, Seung-Wook;Kim, Jong-Min;Kim, Hong-Taek
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.362-371
    • /
    • 2006
  • The behaviour characteristics of Granular Compaction Pile(GCP) are mainly governed by the lateral confining pressure mobilized in the matrix soft soil to restrain the bulging failure of the granular compaction pile. The GCP method is most effective in soft soil with untrained shear strength ranging from $15\sim50\;kPa$. However, the efficiency of this method is falling down in the more compressible soil conditions, which does not provide sufficient lateral confinement. In the present study, the GCP method reinforced with uniformly graded permissible concrete is suggested for the extension of application to the soft ground. Also, large triaxial compression tests are conducted on composite- reinforced soil samples for verification of availability of the suggested method and the settlement estimation method of the reinforced GCP is proposed. Further, for the verification of a validity of the proposed method, predicted settlements are compared with results of numerical analyses. Tn addition, parametric studies are performed together with detailed analyses of relevant design parameters.

  • PDF

Application of Pile Net Method to restrain the Soft Ground settlement in Concrete Track (콘크리트궤도 침하억제를 위한 파일네트공법 적용성 검토)

  • Lee, Il-Wha;Lee, Sung-Jin;Lee, Su-Hyung;Bang, Eui-Seok;Jung, Jang-Yong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1695-1704
    • /
    • 2008
  • The problems associated with constructing high-speed concrete track embankments over soft compressible soil has lead to the development and/or extensive use of many of the ground improvement techniques used today. Drains, surcharge loading, and geosynthetic reinforcement, have all been used to solve the settlement and embankment stability issues associated with construction on soft soils. However, when time constraints are critical to the success of the project, owners have resorted to another innovative approach. Especially, the design criteria of residual settlement is limited as 30mm for concrete track embankment, it is very difficult to satisfy this standard using the former construction method. Pile net method consist of vertical columns that are designed to transfer the load of the embankment through the soft compressible soil layer to a firm foundation and one or more layers of geosynthetic reinforcement placed between the top of the columns and the bottom of the embankment. This paper will present the guidelines for the design of pile net method to supported embankments. These guidelines were developed based on a review of current design methodologies and a parametric study of design variables using numerical modeling.

  • PDF