• 제목/요약/키워드: scheduling method

검색결과 1,389건 처리시간 0.029초

네트워크를 이용한 제어 시스템의 안정도 및 스케줄링에 관한 연구 (Stability and a scheduling method for network-based control systems)

  • 김용호;권욱현;박홍성
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 한국자동제어학술회의논문집(국내학술편); 포항공과대학교, 포항; 24-26 Oct. 1996
    • /
    • pp.1432-1435
    • /
    • 1996
  • This paper obtains maximum allowable delay bounds for stability of network-based control systems and presents a network scheduling method which makes the network-induced delay be less than the maximum allowable delay bound. The maximum allowable delay bounds are obtained using the Lyapunov theorem. Using the network scheduling method, the bandwidth of a network can be allocated to each node and the sampling period of each sensor and controller can be determined. The presented method can handle three kinds of data (periodic, real-time asynchronous, and non real-time asynchronous data) and guarantee real-time transmissions of real-time synchronous data and periodic data, and possible transmissions of non real-time asynchronous data. The proposed method is shown to be useful by examples in two types of network protocols such as the token control and the central control.

  • PDF

상위수준 합성에서의 클록 선택 방법 (A method for Clock Selection in High-Level Synthesis)

  • 오주영
    • 한국정보전자통신기술학회논문지
    • /
    • 제4권2호
    • /
    • pp.83-87
    • /
    • 2011
  • 상위수준합성에서 클록 선택은 시스템의 성능과 설계의 질에 큰 영향을 미친다. 대부분의 시스템에서 클럭은 사전에 설계자에 의해 미리 명시되어야하지만, 최상의 클록은 상이한 스케줄의 결과를 평가한 후에 탐색이 가능하다. 본 연구에서는 체이닝이 가능한 연산 집합으로부터 클록을 선택하면서 동시에 스케줄링 하는 방법을 제안한다. 제안 스케줄링 알고리즘은 선택된 클록 주기에 기초하여 비트 단위 지연시간을 고려한 체이닝을 수행하며 리스트 스케줄링 방법으로 진행한다. 실험 결과는 제안 방법이 18%의 성능 개선이 있음을 보인다.

Adaptive Cross-Layer Packet Scheduling Method for Multimedia Services in Wireless Personal Area Networks

  • Kim Sung-Won;Kim Byung-Seo
    • Journal of Communications and Networks
    • /
    • 제8권3호
    • /
    • pp.297-305
    • /
    • 2006
  • High-rate wireless personal area network (HR-WPAN) has been standardized by the IEEE 802.15.3 task group (TG). To support multimedia services, the IEEE 802.15.3 TG adopts a time-slotted medium access control (MAC) protocol controlled by a central device. In the time division multiple access (TDMA)-based wireless packet networks, the packet scheduling algorithm plays a key role in quality of service (QoS) provisioning for multimedia services. In this paper, we propose an adaptive cross-layer packet scheduling method for the TDMA-based HR-WPAN. Physical channel conditions, MAC protocol, link layer status, random traffic arrival, and QoS requirement are taken into consideration by the proposed packet scheduling method. Performance evaluations are carried out through extensive simulations and significant performance enhancements are observed. Furthermore, the performance of the proposed scheme remains stable regardless of the variable system parameters such as the number of devices (DEVs) and delay bound.

유전 알고리즘을 이용한 선각 가공 작업일정계획 시스템의 개발에 관한 연구 (Operation Scheduling System for Hull Block Fabrication in Shipbuilding using Genetic Algorithm)

  • 조규갑;김영구;류광렬;황준하;최형림
    • 산업공학
    • /
    • 제11권3호
    • /
    • pp.115-128
    • /
    • 1998
  • This paper presents a development of operation scheduling and reactive operation scheduling system for hull fabrication. The methodology for implementing operation scheduling system is HHGA(Hierarchical Hybrid Genetic Algorithm) which exploits both the global perspective of the genetic algorithm and the rapid convergence of the heuristic search for operation scheduling. The methodology for the reactive operation scheduling is the revised HHGA which consists of manual schedule editor for occurrence of exceptional events and the revised scheduling method used in operation scheduling. As the results of experiment, it has been confirmed that HHGA is able to search good operation scheduling within reasonable time, and the revised HHGA is able to search load-balanced reactive operation scheduling with minimum changes of initial operation schedule within short period of time.

  • PDF

라우터시스템의 Multicast 패킷 Scheduling 방법 (A Multicast Packet Scheduling for Router Systems)

  • 이형섭;이상연;이형호;김환우
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2001년도 하계종합학술대회 논문집(1)
    • /
    • pp.297-300
    • /
    • 2001
  • This paper proposes a sound multicast packet-switching method which can less affect QoS degradation. The method includes a switch fabric with extra switching paths dedicated for multicast packets. Presented also are both a buffering structure and a scheduling algorithm for the proposed method. Simulation analysis for the method shows that the switching delay of unicast packets is decreased even though arrival rate of multicast packets is increased.

  • PDF

동일하지 않는 병렬기계 시스템에서 지연작업수를 최소화하는 Tabu Search 방법 (Tabu Search methods to minimize the number of tardy jobs in nonidentical parallel machine scheduling problem)

  • 전태웅;강맹규
    • 경영과학
    • /
    • 제12권3호
    • /
    • pp.177-185
    • /
    • 1995
  • This paper presents a Tabu Search method to minimize a number of tardy jobs in the nonidentical parallel machine scheduling. The Tabu Search method employs a restricted neighborhood for the reduction of computation time. In this paper, we use two different types of method for a single machine scheduling. One is Moore's algorithm and the other is insertion method. We discuss computational experiments on more than 1000 test problems.

  • PDF

확장된 Petri-net을 이용한 FMS의 모델링 및 스케쥴링 (Modeling and scheduling for FMS using extended petri nets)

  • 안인석;서기성;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1991년도 한국자동제어학술회의논문집(국내학술편); KOEX, Seoul; 22-24 Oct. 1991
    • /
    • pp.488-492
    • /
    • 1991
  • This paper deals with modeling and scheduling for flexible manufacturing systems(FMS). In modeling extended Petri nets are used to describe various and complex properties. To resolve multiple conflict without predefined properties, such as part selection, machine selection, rule-based scheduling method is introduced. This structure have a capability of on-line scheduling with systematic modeling description.

  • PDF

자원 제약을 고려한 조선산업에서의 탑재 일정계획에 관한 연구 (A Study on the Erection Scheduling for Shipbuilding Considering Resource Constraints)

  • 김기동;우상복;한형상
    • 산업공학
    • /
    • 제14권3호
    • /
    • pp.218-226
    • /
    • 2001
  • Scheduling for shipbuilding processes has many alternative solutions since it has long time horizon and handles many jobs. This requests the scheduling system to generate and search feasible alternative solutions in short period of time. Among shipbuilding schedules, the ship erection schedule in a dock is the most important since the dock is the most critical resource in shipyard. In this research, we model the erection scheduling problem for shipbuilding and develop a new problem solving method using CST(Constraint Satisfaction Technique) and ILOG Scheduler. Experimental results show that the proposed scheduling method outperforms the existing manual scheduling methods in terms of schedule performance and required time.

  • PDF

A Divided Scheduling Method based on Structural Characteristics in Wireless

  • Yoshino, Yuriko;Hashimoto, Masafumi;Wakamiya, Naoki
    • Journal of Multimedia Information System
    • /
    • 제3권4호
    • /
    • pp.149-154
    • /
    • 2016
  • Wireless mesh networks (WMNs) are used for metropolitan area network that requires high network throughput for handling many users. TDMA-based access is a common solution for this problem and several scheduling methods have been proposed. However, existing heuristic methods have room for improvement at network throughput although they are low complexity. In this paper, we propose a novel divided scheduling method based on structural characteristics in order to improve network throughput in WMNs. It separately schedules neighbor links of gateways and that of the other links by different scheduling algorithms. Simulation-based evaluations show that our proposal improves up to 14% of network throughput compared with conventional scheduling algorithm script.

Total Tardiness 기준하(基準下)에서의 m- machine Flowshop Scheduling을 위한 발견적(發見的) 기법(技法)에 관한 연구(硏究) (A heuristic m-machine flowshop scheduling method under the total tardiness criterion)

  • 최용선;이성수;김성희
    • 대한산업공학회지
    • /
    • 제18권1호
    • /
    • pp.91-104
    • /
    • 1992
  • Flowshop scheduling problem is known to be NP-complete. Since the optimization apporach like branch-and-bound is limited by exponentially growing computation time, many heuristic methods have been developed. Total tardiness is one of the criteria that the researchers have recently considered in flowshop scheduling. There, however, are few literatures which studied the general (m machine)-flowshop scheduling under the total tardiness criterion. In this paper, a heuristic scheduling method to minimize total tardiness at the (m machine, n job)-flowshop is presented. A heuristic value function is proposed to be used as a dispatching criterion in initial schedule generation. And the schedule improving procedure, by pairwise interchange of tardy job with the job right ahead of it, is introduced. Illustrative examles and simulated results are presented.

  • PDF