• Title/Summary/Keyword: schedule model

Search Result 720, Processing Time 0.049 seconds

A Stay Detection Algorithm Using GPS Trajectory and Points of Interest Data

  • Eunchong Koh;Changhoon Lyu;Goya Choi;Kye-Dong Jung;Soonchul Kwon;Chigon Hwang
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.15 no.3
    • /
    • pp.176-184
    • /
    • 2023
  • Points of interest (POIs) are widely used in tourism recommendations and to provide information about areas of interest. Currently, situation judgement using POI and GPS data is mainly rule-based. However, this approach has the limitation that inferences can only be made using predefined POI information. In this study, we propose an algorithm that uses POI data, GPS data, and schedule information to calculate the current speed, location, schedule matching, movement trajectory, and POI coverage, and uses machine learning to determine whether to stay or go. Based on the input data, the clustered information is labelled by k-means algorithm as unsupervised learning. This result is trained as the input vector of the SVM model to calculate the probability of moving and staying. Therefore, in this study, we implemented an algorithm that can adjust the schedule using the travel schedule, POI data, and GPS information. The results show that the algorithm does not rely on predefined information, but can make judgements using GPS data and POI data in real time, which is more flexible and reliable than traditional rule-based approaches. Therefore, this study can optimize tourism scheduling. Therefore, the stay detection algorithm using GPS movement trajectories and POIs developed in this study provides important information for tourism schedule planning and is expected to provide much value for tourism services.

Pass Schedule Design to Inhibit Surface Cracks Generation on Workpiece in Groove Rolling Process (공형압연 공정에서 소재 표면흠 발생억제를 위한 패스 스케줄 설계)

  • Na, Doo-Hyun;Lee, Young-Seog
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.34 no.10
    • /
    • pp.1443-1453
    • /
    • 2010
  • We simulated the roughing train of the rod mill of SEAH BESTEEL Inc. using finite element method to inhibit surface cracks initiation on workpiece. We designed 2nd pass (square roll) and applied to this roll in the roughing train of the rod mill. Also, we proposed new pass schedule, which changed roll gap of 3rd and 4th groove by using finite element method. We used shear damage model, which is dependent on shear stress ratio and compared the number of damaged elements on workpiece. A damaged element means surface crack. Consequently, after 2nd pass (square roll) is changed, the error rate decreased by 1.43% when compare to that of the old groove. And the number of damaged elements in the new pass schedule decreased by 37.6%, which is less than present pass schedule.

A study on the relationship between design and construction information for the Integrated Construction Information System (통합 건설 정보 시스템 구축을 위한 설계-공정 정보의 연계 방안에 관한 연구)

  • Yun Seok-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.107-114
    • /
    • 2002
  • As many software tools are used for managing construction projects, integration of their data and information is gradually becoming critical. Focusing on the integration of design and scheduling data, a generic scheduling information model is designed through this research, with appropriate consideration for past research results on construction information model and also object oriented CAD technology. In order to test the practical usage of this model, a small prototype system which can derive schedule information from the design information is implemented.

  • PDF

A Risk Analysis Model Using VERT for R & D Project Management (R & D 프로젝트의 위험분석모형의 연구)

  • 황홍석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF

Work Management Model to Integrate Schedule and Bill of Quantity (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • Park, Hong-Tae;Park, Chan-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

A Heuristic Unloading Scheduling for the Raw-Material-Carrying Vessels (원료 하역순서(原料 荷役順序)의 결정(決定))

  • Seong, Deok-Hyeon;Lee, Yong-Hwang;Kim, Yun-Ho;Han, Jae-Ho;Kim, Jae-Yeon
    • IE interfaces
    • /
    • v.1 no.2
    • /
    • pp.35-44
    • /
    • 1988
  • The purpose of this paper is to prepare an unloading schedule of the raw-material-carrying vessels at Pohang port so as to minimize the total demurrages. A mixed integer programming(MIP) model was constructed, in which only three berths were considered. For the feasible application of the model an approximation approach was employed. The results of the test run of the model based on the past four-month's real data of P company revealed the company could have saved a considerable amount of demurrages, if the model had been applied during the same period. In addition, all the processes were computerized for the clerk-in-charge not only to utilize the results of this study easily but also to rearrange the schedule in quick response to any possible changes.

  • PDF

A Goal Programming Model for Guard Soldier Scheduling (목표계획법을 이용한 경계부대 근무편성에 관한 연구)

  • Kim, Hak-Young;Ryoo, Hong-Seo
    • Journal of the military operations research society of Korea
    • /
    • v.32 no.2
    • /
    • pp.21-39
    • /
    • 2006
  • This paper presents a mixed linear and integer goal programming (GP) model to aid in strategic planning and scheduling of guard soldiers. The proposed model is a general-purpose model, hence can be used to produce an optimal schedule with respect to any user-provided combination of guard post objectives and soldier preferences. We extensively test the usefulness of the model on a real-life dataset from a guard post in the ROK Army with using three objectives set by the guard post and three preferences provided by individual solders. Numerical results and analysis from these experiments show that the proposed guard scheduling model efficiently as well as effectively generates an optimal guard schedule and can also be used for an optimal revision of any existing schedule. In summary, these illustrate that the proposed model can be practically used for optimal planning and scheduling of guard soldiers in guard posts.

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

Additional Freight Train Schedule Generation Model (화물열차 증편일정 결정모형)

  • Kim, Young-Hoon;Rim, Suk-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.6
    • /
    • pp.3851-3857
    • /
    • 2014
  • Shippers' requests of freight trains vary with time, but generating an additional schedule of freight trains is not easy due to many considerations, such as the line capacity, operation rules, and conflicts with existing trains. On the other hand, an additional freight train schedule has been continuously requested and manually processed by domestic train operation companies using empirical method, which is time consuming. This paper proposes a model to determine the additional freight train schedule that assesses the feasibility of the added freight trains, and generates as many additional schedules as possible, while minimizing the delay of the existing schedules. The problem is presented using time-space network, modeled as multi-commodity flow problem, and solved using the column generation method. Three levels of experiment were conducted to show validity of the proposed model in the computation time.

Optimal Operation Schedule of Semi-Fixed PV System and Its Effect on PV Power Generation Efficiency (반고정식 PV 시스템의 운영 스케줄 도출 및 그에 따른 발전 효율 변화 고찰)

  • Kwak, In-Kyu;Mun, Sun-Hye;Huh, Jung-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.37 no.6
    • /
    • pp.69-77
    • /
    • 2017
  • The amount of solar irradiation obtained by a photovoltaic (PV) solar panel is the major factor determining the power generated by a PV system, and the array tilt angle is critical for maximizing panel radiation acquisition. There are three types of PV systems based on the manner of setting the array tilt angle: fixed, semi-fixed, and tracking systems. A fixed system cannot respond to seasonal solar altitude angle changes, and therefore cannot absorb the maximum available solar radiation. The tracking system continually adjusts the tilt angle to absorb the maximum available radiation, but requires additional cost for equipment, installation, operation, and maintenance. The semi-fixed system is only adjusted periodically (usually seasonally) to obtain more energy than a fixed system at an overall cost that is less than a tracking system. To maximize semi-fixed system efficiency, determining the optimal tilt angle adjustment schedule are required. In this research, we conducted a simulation to derive an optimal operation schedule for a semi-fixed system in Seoul, Korea (latitude $37.5^{\circ}$). We implemented a solar radiation acquisition model and PV genereation model on MATLAB. The optimal operation schedule was derived by changing the number of tilt angle adjustments throughout a year using a Dynamic Algorithm. The results show that adjusting the tilt angle 4 times a year was the most appropriate. and then, generation amount of PV system increased 2.80% compared with the fixed system. This corresponds to 99% compared to daily adjustment model. This increase would be quite valid as the PV system installation area increased.