• Title/Summary/Keyword: rough construction cost

Search Result 23, Processing Time 0.023 seconds

Efficient Evaluation Method of Operation Cost for Wastewater Treatment Plant by BTL Contract Type (하수처리시설 BTL사업의 합리적인 운영비 산정방안)

  • Kang, Leen Seok;Yoon, Sun MI;Kwon, Joong Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5D
    • /
    • pp.627-634
    • /
    • 2009
  • The BTL (Build-Transfer-Lease) contract of construction project serves as a part for early establishment of industrial foundation for social overhead capital. However, project cost of BTL contract is focused on initial construction cost. Accordingly, operation cost is lowly evaluated because there is no standard criterion for estimating maintenance cost for the facility. The low operation cost can be a factor that reduces service quality of facility operation. This study suggests a resonable method for estimating cost and manpower in the operation phase by using the existing practical data for wastewater treatment plant by BTL contract. The results of the study can be used for evaluating rough operation cost and manpower of similar plant project by facility size.

A study on the method for the Integrated Cost Estimate based on Project(ICEP) of program management with typical model (기준모델을 사용한 종합사업관리용역비 산정방법(ICEP) 연구)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.119-128
    • /
    • 2015
  • Domestic dominant method in subcontract cost estimate for comprehensive program management is estimation by referencing similar cases or relying on the experience and expertise of the engaged. However, this method is not reliable due to lack of accuracy, making it harder for clients to plan and budget the program. Since budget itself is roughly estimated, it becomes a source of cost rise in the course of management due to design modifications. Therefore, the client and service providers shall calculate more accurate service cost by applying objective and scientific method in order to minimize cost rise and cost related dispute. Traditional cases, in estimating program management cost, took Top-Down approach based on precedents and experience. On the contrary, this study will categorize management structure into phases and activities, issue WBS for each phase to estimated schedule and cost for each code, and take Bottom-UP approach. By taking this approach named ICEP (Integrated Cost Estimate based on Project), Set project typical model will be developed for service cost estimating, calculate cost by applying project-specific factors. Also, by analyzing progress data and allocated management cost to complement them, more efficient construction management will take shape based on program management cost standards which reflect project-specific features.

A Study on Railway Transportation Business Cost Estimation & Decision Supporting Methods using Simulation Data (시뮬레이션을 활용한 철도교통사업 비용 추산 및 의사결정 지원 방법 연구)

  • Chang, Suk;Nam, Do Woo;Sim, Jeong Hwan;Kim, Dong Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.29 no.4
    • /
    • pp.85-94
    • /
    • 2020
  • In determining the feasibility of planning and launching railway transportation projects, various decision-making processes are essentially required. LCC(Life Cycle Cost) value including total construction cost and operation cost is estimated in approximation Model with rough guideline. In this study, modeling and simulation-based analysis method is proposed to support the decision making process of railroad transportation and derivation of LCC. Firstly, cost analysis model was constructed by collecting various existing rail transportation business data to enable analyze based on numerical data, and the result were analyzed by DOE(Design Of Experiments) and RSM (Response Surface Method) simulation. Professional commercial software tools were used for effective model construction and simulation. In order to verify the research results, the actual railroad transportation projects were selected, and the results of the analysis were compared.

Automatic Inference of Standard BOQ(Bill of Quantities) Items using BIM and Ontology (BIM과 온톨로지를 활용한 표준내역항목 추론 자동화)

  • Lee, Seul-Ki;Kim, Ka-Ram;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.99-108
    • /
    • 2012
  • The rough design information is only available from BIM(Building Information Model) based schematic design. So, it is difficult to obtain sufficient information for generating BOQ. Like 2D design, there are some problems that the results are depend on what the choice of cost estimator. However, the most research of BIM based cost estimation are focus on quantity takeoff, the consideration of work item for generating BOQ is insufficient. Therefore, this paper present automatic inference process of work items in a BOQ using ontology. The proposed process and ontology is validated through applying tiling construction. If the proposed process is utilized, it is expected the basis of developing generation method for consistent BOQ by resolving intervention of cost estimator's arbitrary decision.

Research for Construction of Landfills at Sea Disposal of Wastes to be Reclaimed in the Metropolitan Area in the Future (폐기물 해상매립장의 도입방안에 관한 연구 - 장래 수도권 지역의 매립폐기물 처리를 중심으로 -)

  • 정공일;김영수
    • Journal of Korea Port Economic Association
    • /
    • v.17 no.1
    • /
    • pp.159-180
    • /
    • 2001
  • The quantity of waste has been increased due to the increase in population and consumption after industrialization. Accordingly it caused the urban environmental problems, the lack of landfill and the pollution around the landfill. Thus, it is necessary to research the adequate alternative in the long-term. In case of Japan, areas and quantities of landfills at sea are more great than those of landfills in land. And investigating our condition, landfills of the metropolitan area in land are to be fully filled with wastes up to 2020 and be closed. In this research, construction of landfill sites at sea is suggested as the alternative waste disposal method and it is suggested that in our country, the suitable landfill sites of the metropolitan area are the regions around Jangbong-do Island and Muei-do Island. It is expected that the best way to transport wastes is to transport through Kyungin canal from the middle collection center to the lower Han River. Rough cost for construction of landfill at sea, if it is used for 50 years, is expected to be 2 trillion won and total time to construct the landfill is expected to be 10 years. Many studies concerning to this research proposal are to be performed so that construction of landfills familiar to environment are to be accomplished.

  • PDF

Estimation of Optimum Pile length Using Various Prediction (다양한 예측기법을 이용한 현장타설말뚝의 최적길이 산정)

  • Choi, Young-Seok;Iim, Hyung-Joon;Song, Myung-Jun;Jang, Hak-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.700-707
    • /
    • 2008
  • As plan connecting island to island or island to land is needed, a lot of long-span bridge is being designed lately in Southern part of Korea. With development of pile equipment, overhanging large-scaled concrete pile are adopted to foundation type of main tower or pylon. About the number of 15~30 group piles per tower foundation is designed to resist long-spaning super-structure load, but by restricted condition of site investigation cost, a few boring-hole tests are performed to identify sub-ground layers. Up to now, direct-curved method connecting two or three known boring logs and representative interval method are usually used to evaluate unknown depth and rock properties at locations where piles are constructed. Because this approach is not logical and so rough, much difference occurs between designed length of piles and real length of it. In this paper, using a lot of various prediction method(reciprocal distance method, inverse square distance method and kriging method etc.), we suggest optimum length of group piles.

  • PDF

Determination of Highway Design Speed Based on Reclassification of Highway Functions and Terrain Types (기능 재분류와 지형특성을 이용한 도로 설계속도 적정화 방안)

  • Shim, Kywan-Bho;Choi, Jai-Sung;Hwang, Kyung-Soo
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.6 s.84
    • /
    • pp.7-18
    • /
    • 2005
  • Currently, design speed selection is chosen by highway function, terrain type and area type. But some standards in classifing highway function let designer decide design speed in an arbitrary manner and too rough a highway function classification system leads to a road function which can not reflect road design, and some ambiguity of terrain type leads to a road which can not reflect land use pattern. Highway design based on traffic volume level without considering area type can result high construction cost. This research paper provides new highway design standards which are based on the refinement of highway design speed selection procedure. The new design speed is summarized to be determined by a more detailed highway function, terrain type, and area type that were made considering South Korean characteristics. The new highway function is established by adopting highway function reclassification and design volumes and rural town center reclassification and new design standards for terrain type selection are developed in this research by analyzing South Korean GIS Data Base obtained over the national government offices.

Evaluation of Visual Arts Policy during Kookmin Government Period (국민의 정부 시기 미술진흥정책의 성과와 한계)

  • Yang, Hyun-Mee
    • The Journal of Art Theory & Practice
    • /
    • no.1
    • /
    • pp.93-108
    • /
    • 2003
  • The aim of this thesis is to evaluate visual arts policy during Kookmin government period(1998-2002). In the beginning, many artists had expected president Kim Dae Jung to enlarge arts support But the evaluation of them was very negative because the government was only interested in the development of cultural industry. First, I analysed the government expenditure in the visual arts. Department of Culture and Tourism took the responsibility of visual arts policy. The budget of arts and culture increased to 1 % of total government expenditure in this period. But the main factor was the increasement of cultural industry and tourism expenditure. The budget of visual arts in 2002 was only 6,600million won. Second, I analysed visual arts support programs. (1) The government introduced studio programs for the first time. For 5 years, 2 national studios and 23 public studios were established. (2) The number of art museum was increased to 62. (3) It introduced alternative space support program and supported 200million won annually. (4) Percent for art scheme reduced from 1% to 0.7% of total construction cost, but still 27 public sculpture gardens were built. (5) Business support for visual arts reduced because of IMF. (6) Also arts market froze and many commercial galleries were closed. (7) In order to revitalize region through arts and to promote international exchange of culture, Gwangju Biennale was created. Third, I analysed Arts Plan 2002. It had a radical limitation because it was established in the last year of Kookmin government period. Also it showed special favors to some arts organizations. In general, I think that positive outcomes are the introductions of the studio program and the alternative space support program. Especially alternative space support program enforced the diversity of visual arts, and encouraged creative young artists. But policy of arts market failed because of IMF and visual artists had to go through rough times.

  • PDF

Current Status and future of Vermicomposting Industry in Korea (지렁이 퇴비화 운영사례 및 개선방향)

  • Kim, Jong-Oh;Lee, Chang-Ho;Choi, Hun-Gun
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.9 no.4
    • /
    • pp.89-98
    • /
    • 2001
  • Present vermicomposting technology needs the broad land. Because of the high land cost, the land saving technology such as multistage must be needed. And present operation practices are mostly based on human power, mechanization and automation is needed. Also, present control practices based on individual experience need the scientific base control system. Even though the rough estimation of organic waste treatment showed that vermicompostiong could obtain more benefits than costs. But, the estimation is based on an ideal case without considering the technical and market. Generally, vermicomposting is considered as the more expensive technology than composting. Therefore, the practical proof the economic factor would be the most important to the market increase. Vermicomposting as the recycling technology has better condition than incineration and landfill. Propagation and advocating focused on its environmentally sound aspects would be needed continuously. Especially, demonstration and distribution of household vermicomposting would be a good approach. Vermicomposting facilities area was becoming larger, and earthworm feeding materials were also expanding to various organic sludges. These trends showed that vermicomposting is being enlightened to treat and recycle the organic wastes.

  • PDF

A correlation method for high-frequency response of a cargo during dry transport in high seas

  • Vinayan, Vimal;Zou, Jun
    • Ocean Systems Engineering
    • /
    • v.6 no.2
    • /
    • pp.143-159
    • /
    • 2016
  • Cargo, such as a Tension Leg Platform (TLP), Semi-submersible platform (Semi), Spar or a circular Floating Production Storage and Offloading (FPSO), are frequently dry-transported on a Heavy Lift Vessel (HLV) from the point of construction to the point of installation. The voyage can span months and the overhanging portions of the hull can be subject to frequent wave slamming events in rough weather. Tie-downs or sea-fastening are usually provided to ensure the safety of the cargo during the voyage and to keep the extreme responses of the cargo, primarily for the installed equipment and facilities, within the design limits. The proper design of the tie-down is dependent on the accurate prediction of the wave slamming loads the cargo will experience during the voyage. This is a difficult task and model testing is a widely accepted and adopted method to obtain reliable sea-fastening loads and extreme accelerations. However, it is crucial to realize the difference in the inherent stiffness of the instrument that is used to measure the tri-axial sea fastening loads and the prototype design of the tie-downs. It is practically not possible to scale the tri-axial load measuring instrument stiffness to reflect the real tie-down stiffness during tests. A correlation method is required to systematically and consistently account for the stiffness differences and correct the measured results. Direct application of the measured load tends to be conservative and lead to over-design that can reflect on the overall cost and schedule of the project. The objective here is to employ the established correlation method to provide proper high-frequency responses to topsides and hull design teams. In addition, guidance for optimizing tie-down design to avoid damage to the installed equipment, facilities and structural members can be provided.