• Title/Summary/Keyword: road structure

Search Result 919, Processing Time 0.028 seconds

Development of the autnomous road vehicle (무인 자동차 개발 연구)

  • 최진욱;한민홍
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10a
    • /
    • pp.88-93
    • /
    • 1993
  • This paper introduces an ARV(Autonomous Road Vehicle) system which can run on orads without help of a driver by detecting road boundaries through computer vision. This vehicle can also detect obstacles in front through sonar sensors and infrared sensors. This system largely consists of a handle steering module and a braking module. From road boundaries, the steering module determines handle turn angle. The braking module stops or decelerates to avoid collision depending on the relative speeds and distance to the obstacles detected by different sensors. This ARV system has been implemented in a small jeep and can run 30-40 km/h city traffic. In this paper, we illustrate the structure of the ARV systems and its operation principle.

  • PDF

Establishment present of fish-road in Kangwondo and Study to apply fish-road is ice harbor 1-type (강원도 어도의 설치 현황 및 I형 아이스하버식 어도 적용성 연구)

  • Choi, Han-Kuy;Choi, Young-Soo;Jeon, Young-Soo
    • Journal of Industrial Technology
    • /
    • v.26 no.B
    • /
    • pp.63-71
    • /
    • 2006
  • The concerned object of the construction industry is environment. It is one of the main purposes of today's construction that human can live reasonably in nature. This study is about the fish-road connecting hydraulic structure in the river with nature. Chapter 2, starting with the general investigation about fish-road and helps comprehension for relatively general fish-road such as necessity, establishment purpose, history, study example, relating domestic law, design condition, consideration and form of fish-road. Chapter 3, containing the present condition of fish-road facilities in Gangwon-Do and thoughts of the problems and general countermeasures of existing fish-road. Chapter 4, Having Examined compatibility by amount of flowing water through hydraulic model test in the Ice harbor I-type model. chapter 5, Analyzation and arrangement to efficient establishment plan of fish-road and the result of the hydraulic model experiment to be beaconed a little in forward fish-road study. In the hydraulic model test result, when we suppose establishment of 1~3 in slope of 1/20, could know that applicable drought flow of the river is $0.06{\sim}3.0m^3/sec$ in case of Ice harbor I-type which transforming Ice harbor that was invented as studying project of the Ministry of Environment.

  • PDF

Landscape Changes Assessment of the National Road-Focused on the National Road in Suburb Areas- (국도의 경관변화 평가-교외지역 국도를 중심으로-)

  • 홍영록;권상준;조태동
    • Korean Journal of Environment and Ecology
    • /
    • v.18 no.1
    • /
    • pp.92-102
    • /
    • 2004
  • In this study, landscape changes were examined by periods through the analysis of visual quantity on the landscape components of national road including the mountains, the sky, road pavements, street trees, paddy fields and dry fields, billboard, telegraph pole, building, structure, slope, guard fence, soundproof wall, and median strip etc. For this, subject national road in suburb arreas was selected to grasp its landscape characteristics, and divisional criteria of landscape type of the national road were suggested to look into the trend of landscape changes by periods. Findings of this study are as follows:1.Divisional criteria of landscape type of the national road include location and geometry, structure, land use, perspective, and surrounding buildings of the national road. 2.The highest visual quantity was found in road pavements by periods among landscape components of the national road. It was found that this result has a thread of connection with previous study emphasizing the importance of road geometry as one of landscape components, and road geometry shall be regarded as a visually significant component in analyzing and evaluating landscape of the national road. 3.Most distinguished factors of landscape changes of the national road by periods were median strip(F=33.296) and street tree(F=32.881), and then the sky(F=24.735) and mountain(F=23.477) showed similar level of statistically significant difference. However, statistically significance difference was not found in buildings and structures. 4.It was shown that natural elements decreased gradually but structural landscape made of artificial elements became the main in construction of the national road. This result implies that although the scenic and ecological soundness is recognized in construction of the national road, it is not out of the limitation of functionalities that is, access and mobility.

Comparative Analysis of Anion Concentration by the Type of Roadside Buffer Green (가로변 완충녹지의 조성유형에 따른 음이온 농도 비교 분석)

  • Yoon, Yong-Han;Joo, Chang-Hun;Park, Hun;Kim, Jeong-Ho
    • Journal of Environmental Science International
    • /
    • v.23 no.7
    • /
    • pp.1339-1347
    • /
    • 2014
  • This study were performed on roadside buffer green in Songpa-dong, Songpa-gu, Seoul in order to analyze the anion concentration according to the type of composition of roadside buffer green. Buffer green separating the physical structure of the measurement points and measurement locations were separated by roadside, green interior, the other side of the road. planting density and deposit of trees per each buffer green was measured in the order of mounding type> slope type> the plain type. If the measured temperature of the location-specific weather elements roadside> inside> the other side of the road in order of measurement and the temperature is lowered farther away from the road. If the relative humidity of the road on the other side> inside> the roadside in order to measure and this is the opposite of the temperature tendency. According to physical structure reduction of the temperature on the other side of the road and roadside in order of mounding type> the plain type> slope type was measured. As a result of measuring a anion therefore concentration of the anion inside of melt is in order of mounding type> the plain type> slope type, tended to match the melt characteristics. According to measured positions anion concentration is in the order of the other side of the road> inside> the roadside was measured. As a result of correlation analysis, in the case of measurement location-specific weather and anions the temperature is positive correlation, relative humidity is negative correlation and that's results of previous studies were supported.

Road Noise Prediction Based on Frequency Response Function of Tire Utilizing Cleat Excitation Method (크리트 가진법을 이용한 타이어특성에 따른 로드노이즈 예측 연구)

  • Park, Jong-Ho;Hwang, Sung-Wook;Lee, Sang-Kwon
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.22 no.8
    • /
    • pp.720-728
    • /
    • 2012
  • It is important for identification of noise and vibration problem of tire to consider influence of interaction between road and tire. A quantification of road noise is a challenging issue in vehicle NVH due to extremely complicated transfer paths of road noise as well as the difficulty in an experimental identification of input force from tire-road interaction. A noise caused by tire is divided into road noise(structure-borne noise) and pattern noise(air-borne noise). Pattern noise is caused by pattern shape of tire, which has larger than 500 Hz, but road noise is generated by the interactions between a tire and a vehicle body. In this paper, we define the quantitative analysis for road noise caused by interactions between tire and road parameters. For the identification of road noise, the chassis dynamometer that is equipped $10mm{\times}10mm $ square cleat in the semi-anechoic chamber is used, and the tire spindle forces are measured by load cell. The vibro-acoustic transfer function between ear position and wheel center was measured by the vibro-acoustic reciprocity method. In this study three tires with different type of mechanical are used for the experiment work.

Evaluation on the Horizontal Alignment of Road Centerline using GIS Programming (GIS 프로그래밍을 이용한 도로중심선 평면선형 평가)

  • Kim, Dong-Ki;Choi, Se-Hyu
    • International Journal of Highway Engineering
    • /
    • v.14 no.1
    • /
    • pp.1-8
    • /
    • 2012
  • The horizontal alignment of road is deeply related with the stability of the road and traffic capacity. It is necessary to analyze horizontal alignment of road accurately for efficient maintenance of the road and relevance judgment about the standard. Recently the study on horizontal alignment of road using Lidar data and GPS was concluded, but they were many problem analyzing horizontal alignment radius of curvature in wide area. In this study, the tool which the radius of curvature can evaluate the suitability about "Rules about the Road Structure & Facilities Standards" by using center lines of the road of the digital map tries to implement on GIS. The interface was designed and implemented which can automatically estimate the Road Centerline Horizontal Alignment by using $ESRI^{(R)}$ $ArcObject^{TM}$.

Analysis of the right to sunshine for elevated structure construction (고가 구조물 건설에 따른 일조권 분석)

  • 강기수;김상석;양승태;강인준
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.04a
    • /
    • pp.485-490
    • /
    • 2004
  • Recently, distribution transfer velocity was extremely lowered by high supply rate of vehicle and low road rate. Therefore expansions of transfer network these were subway, road and railway to recover competitive power as a reform measure of physical distribution traffic were become preference previous subject. For reason of that, an expansion of transfer network is meeting competitive power as selected an elevated road in the ground road network that condition of location calm and get out of the existing urban than the underground road to connect oversensitive a large city and expanded small and medium satellite town. In the meantime, while elevated structures construct, they go through the civilian residential section, agriculture land, etc. The consequence is that it raises a vibration, noise, dust, an infringement of the right to a view and an infringement of the right to a sunshine. In this study, we analyzed Quantitatively sunshine quantity with building 3D simulation model of civil structure. Therefore, we present as planning data to reduce a civilian appeal for dispute of the right to sunshine and an economic and time loss between the government and construction company In addition to that, for the standard of the standard plan of usable sunshine quantity program in the practical business, the building of convenient user interface will be the project to be done.

  • PDF

Development of VR Simulation Algorithm and System for Supporting Optimal Road Design Information (가상 시뮬레이션에 의한 도로설계정보 최적화 방법론 및 지원체계 개발)

  • Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.101-110
    • /
    • 2009
  • The current virtual reality(VR) simulation functions in construction project are focused on the construction phase. This study attempts to extend the application of VR functions to the design phase. This study suggests various VR functions such as earthwork simulation by road alignment, alternative route selection simulation, structure type selection simulation and underground structure visualization simulation. These functions can visualize road route and earthwork condition and select an optimal design route by simulating virtual placement of alternative route. This study configures systematic methodology for suggested VR simulation functions and develops VR system by the functions. Finally this study suggests an improved design process of road construction project by using the developed VR functions

Prioritization of Potential Technology for Establishing a Safe Work Zone Environment (안전한 도로 공사구간 환경 구축에 필요한 기술의 우선순위 선정)

  • Kim, Jin Guk;Yang, Choong Heon;Yun, Duk Geun
    • International Journal of Highway Engineering
    • /
    • v.17 no.6
    • /
    • pp.117-126
    • /
    • 2015
  • PURPOSES : This study prioritizes potential technology for establishing a safe work zone environment on roadways. We consider almost all conceivable technologies that enable mitigation of unexpected accidents for both road workers and drivers. METHODS : This study suggests a methodology to set the priority of potential technology for establishing a safe work zone environment by using the analytical hierarchy process (AHP). For this purpose, the AHP structure was first developed. Thereafter, a web-based survey was conducted to collect experts' opinions. Based on the survey results, weights associated with the relevant criteria of the developed structure were estimated. With the consistency index (CI) and consistency ratio (CR), we verified the estimated weights. In addition, a sensitivity analysis was performed to confirm whether the estimated weights were reliable. We finally proposed the priority for potential technology for establishing a safe work zone environment on roadways. RESULTS : In the first level, safety technology has the highest priority, and real-time information delivery for work zone, hazard warning for drivers, and temporal automated operation for traffic facilities were selected in the second level of hierarchy. CONCLUSIONS : The results imply that establishing the priority will be useful to establish a future road map for improving the work environment for road workers and drivers by employing appropriate protection facilities and developing safety systems.

Differences in Breeding Bird Communities Caused by Different Distance from the Road (도로로부터 거리가 다른 지역에서 번식기 조류군집의 차이)

  • 허위행;임신재;이우신
    • The Korean Journal of Ecology
    • /
    • v.26 no.1
    • /
    • pp.29-33
    • /
    • 2003
  • This study was conducted to clarify the influence of national road construction on breeding bird community from April to June 2002 in 8 fragmented forest areas of Baekdudaegan mountain ranges, Korea. There were more observed birds in 50∼100m areas than in 50m areas from road. Guild structures were different between both areas. Number of species and individuals belong to hole nesting and canopy foraging guilds were lower in 50m areas than in 50∼100m areas from roads. Habitat structure of breeding bird community would be changed by road construction.