• Title/Summary/Keyword: risk response

Search Result 1,643, Processing Time 0.025 seconds

Information security risk: Application of the conjoint analysis (정보 보안 위험: 컨조인트 분석 활용 사례 연구)

  • Pak, Ro-Jin;Lee, Dong-Hoon
    • Journal of the Korean Data and Information Science Society
    • /
    • v.22 no.2
    • /
    • pp.207-215
    • /
    • 2011
  • This Risk analysis on information related assets is conducted primarily according to the standards the Korea Information and Telecommunications Technology Association (TTA) or the International Organization for Standardization (ISO). The process is made of asset analysis, threat analysis, vulnerability analysis, and response plan analysis. The risk for information related assets belongs to the operational risks suggested by BIS (Bank for International Settlements) and the information related losses can be estimated in terms of BIS' suggestion. In this paper it is proposed that how to apply the method proposed by BIS to estimate the loss of information assets.

Analysis of Schedule Risk using PROMETHEE (PROMETHEE 기법을 활용한 공정리스크 중요도 분석)

  • Lee, Jang-Young;Yoon, Yoo-Sang;Jang, Myung-Hoon;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.353-357
    • /
    • 2008
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management processes identification, analysis and response. Especially, the analysis process is important to objectively identify importance and priority among risk factors. The purpose of this study is to develop the effective analysis process by studying and supplement the problem of the AHP analysis method. The study provides a analysis process to use the PROMETHEE analysis method proposed.

  • PDF

The Mitigation Model Development for Minimizing IT Operational Risks (IT운영리스크 최소화를 위한 피해저감모델 구현에 관한 연구)

  • Lee, Young-Jai;Hwang, Myung-Soo
    • Journal of Information Technology Applications and Management
    • /
    • v.14 no.3
    • /
    • pp.95-113
    • /
    • 2007
  • To minimize IT operational risks and the opportunity cost for lost business hours. it is necessary to have preparedness in advance and mitigation activities for minimization of a loss due to the business discontinuity. There are few cases that banks have a policy on systematic management, system recovery and protection activities against system failure. and most developers and system administrators response based on their experience and the instinct. This article focuses on the mitigation model development for minimizing the incidents of disk unit in IT operational risks. The model will be represented by a network model which is composed of the three items as following: (1) the risk factors(causes, attributes and indicators) of IT operational risk. (2) a periodic time interval through an analysis of historical data. (3) an index or an operational regulations related to the examination of causes of an operational risk. This article will be helpful when enterprise needs to hierarchically analyze risk factors from various fields of IT(information security, information telecommunication, web application servers and so on) and develop a mitigation model. and it will also contribute to the reduction of operational risks on information systems.

  • PDF

The Safety Assessment of Small WIG Craft in the 20-Passenger Class (20인승급 소형 위그선의 안전성 평가)

  • Lee, Soon-Sup;Lee, Jong-Kap
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.2
    • /
    • pp.179-188
    • /
    • 2009
  • WIG crafts are a high speed vessel with features of dynamic supported craft. These crafts, which are predominantly of light weight and operate any substantially greater speeds than conventional craft such as bulk carrier, tanker, container ship, etc., could not be accommodated under traditional maritime safety instruments. It means that there is the need for risk and safety levels to be assessed on a holistic basis, recognizing that high levels of operator training, comprehensive and thoroughly implemented procedures, high levels of automation and sophisticated software can all make significant contributions to risk reduction. To response this requirement, the Interim Guideline for WIG craft(MSC/Circ.1054) were developed in the view of the configuration of WIG craft, which fall between the maritime and aviation regulatory regimes. This paper reviews a safety assessment process and methodology to be used in the design phase of a new ship. The process and methodology is based on the risk-based approach and is applied to safety assessment in concept development phase of small WIG craft in the 20-person class.

The Effects of Food Safety Accident on the Consumption of Eggs : Focusing on the Pesticide-related Accident (식품안전사고가 계란 소비에 미치는 영향: 계란의 살충제검출사고를 중심으로)

  • Han, Byeol;Yang, Sung-Bum
    • Korean Journal of Organic Agriculture
    • /
    • v.27 no.1
    • /
    • pp.17-32
    • /
    • 2019
  • The objective of this study is to investigate the effect of pesticide-related accident on prices and sales of eggs and the perception of food safety accidents among consumers. For this, we analyzed the impact of the pesticide incident on consumers' purchases by separating large discount stores and eco-friendly specialty stores with econometrics methods. In addition, the value changes for each egg certification were analyzed after the accident. Perception of food safety accidents was conducted through a survey to investigate the awareness of the pesticide-related accidents, changes in purchases, and the causes of the pesticide accidents. Furthermore, the risk analysis was conducted. This results show the importance of trust and communication in food safety accidents between distributors, consumers and concerned authorities. Also, after the accident, consumers' interest and premium exist in the breeding process such as animal welfare, not only in the final product. Therefore in order to actively respond to food safety accidents such as pesticides-related accident, response and improvement are necessary considering various aspects such as risk assessment, risk management, and risk communication.

Design and Implementation of Quantitative Risk Analysis System for ISP Network (ISP(Internet Service Provider) 네트워크의 정량적인 위험분석을 위한 시스템 설계 및 구현)

  • 문호건;최진기;김형순
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.14 no.2
    • /
    • pp.101-111
    • /
    • 2004
  • Risk analysis process, which identifies vulnerabilities and threat causes of network assets and evaluates expected loss when some of network assets are damaged, is essential for diagnosing ISP network security levels and response planning. However, most existing risk analysis systems provide only methodological analysis procedures, and they can not reflect continually changing vulnerabilities and threats information of individual network system on real time. For this reason, this paper suggests new system design methodology which shows a scheme to collects and analyzes data from network intrusion detection system and vulnerability analysis system and estimate quantitative risk levels. Additionally, experimental performance of proposed system is shown.

Comparison of complication rates after transvaginal ultrasound-guided oocyte pick-up procedures with respect to ovarian response

  • Gungor, Nur Dokuzeylul;Gurbuz, Tugba;Onal, Murat
    • Clinical and Experimental Reproductive Medicine
    • /
    • v.49 no.2
    • /
    • pp.142-148
    • /
    • 2022
  • Objective: The aim of this study was to compare the complication rates of oocyte pick-up (OPU) procedures via transvaginal ultrasonography in patients with different levels of ovarian reserve. Methods: In total, 789 patients who underwent OPU procedures for in vitro fertilization (IVF) were included in the study. Results: Individuals with normal ovarian reserve had a 2.947-fold higher risk of complications in OPU procedures than individuals with low ovarian reserve, and individuals with high ovarian reserve had a 7.448-fold higher risk of complications than individuals with low ovarian reserve. In addition, a higher number of IVF trials was associated with an increased risk of complications. Conclusion: The results of this study show that OPU has a higher risk of complications, particularly severe pain, in patients with high ovarian reserve. It is thought that complications can be reduced by preferring mild stimulation in patients with high ovarian reserve. Collecting fewer oocytes is also associated with a lower risk of complications from OPU. Even if a patient's reserve is very good, fewer and higher-quality oocytes should be targeted with the use of the lowest possible dose of drugs.

Effective Customer Risk Management at the Nuclear Medicine Department: Risk Managemont MOT Development Application and Producing Public Relations Film (핵의학과 내에서의 효과적인 고객위험관리: 위험관리 응대 MOT 개발적용 및 홍보동영상 제작)

  • Ham, Jong-Hum;Hwang, Jae-Bong;Kim, Joon-Ho;Lee, Gui-Won
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.13 no.3
    • /
    • pp.110-122
    • /
    • 2009
  • Purpose: Nowadays, A medical institution assesment could get more interest about a quality of medical services from many hospitals that developed the active activities for improving medical services. Also, there is an other additional issue which is the patients risk management. Uijeongbu ST. Mary's hospital Nuclear Medicine department has been changed many work process after PET-CT introduction and renovation of its place since 2008. Therefore, modified structure and the way of existing work process have contained risk factors. The purpose of this study would be the appropriate risk management process while imaging examination process, the removal risk factors and improved activities through the analysis risk factors. Materials and Methods: Nuclear Medicine department new process should analysis through many-sided, Firstly, make and trained risk management manual after then apply an actual work. Result analysis showed the number of risk accident occurrence that comparing the last year and after the improved activities. Secondly, producing risk management public relations film has been showed an applicable patient after then the customer service measurement checked for a hundred patient by questionnaire. Lastly, Risk factors were eliminated through the facilities participation improving activities which could change for the better risk factors. Results: The number of safety accident occurrence(medication error, fall and collision) were checked as zero after the improving activities both PET-CT and gamma camera examination. The results of questionnaire showed as follows; 74% marked as understanding of the test process and 81% checked "satisfaction" after the public relations film showing. The question "Did you consider about the risk factors?", both PET-CT and gamma camera checked as 94% and 89% respectively. Customer risk management could be accomplished effectively through the improving activities at the nuclear medicine department. Conclusions: The study would be an opportunity that spread risk factors were systematically showed and analyzied. Also, It showed the possibility of the minimized safety accident and its feedback, if application of the response manuel that could be a standard of radiology technician's work method to react safety accident. It was the more effective that visual material could be easy to approach as a methodology of risk factors. As far as I have concerned that It could help the safety and convenience through continuous and detailed activities that offer to patients.

  • PDF

A Study on the Risk Assessment Occurred Possibly in a Civil Project (토목공사에서 발생 가능한 리스크평가에 관한 연구)

  • Yoon, Yong-Kyun
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.59-66
    • /
    • 2011
  • A variety of risks caused by natural, technological and biological hazards threaten a business continuity of an organization. Business continuity is very important issue for all organizations and its proper management may control success and failure of an organization. Business continuity plan (BCP) may be defined as a management process which provides a business continuity. BCP includes risk management, operational continuity plan, response/ recovery, exercise/study and crisis communication, etc. Risk management is a systematic method to identify, analyze, evaluate and treat emergency risks and risk assessment is composed of identifying, analyzing and evaluating emergency risks. Risk assesment is the first step for making BCP. In this study, risk assessment has been conducted for sewer laying project. Through assessing risks, 18 risks that may threaten the construction operation are identified and it is founded to be that high levels of risks which require treatment are 'collapse of excavation surface', 'breakage of ground infra-facilities', 'noise & dust dispersion' and 'rise of material costs'.

A Study for Comparison of Risk Estimates According to Extrapolating Methods of Benzo(a)Pyrene in the Ambient Air (대기중 Benzo(a) pyrene의 외삽방법에 따른 위해도 추계치의 비교 연구)

  • Kim, Jong-Man;Chung, Yong
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.8 no.1
    • /
    • pp.29-37
    • /
    • 1992
  • The risk of benzo(a)pyrene for cancer in the ambient air of Seoul was assessed by using the extrapolation methods. The average daily lifetime exposure of benzo(a)pyrene in the ambient air of Seoul was calculated at 6.97-24.30ng/$m^2$/day, which was based on the occurrence analysis of benzo(a)pyrene in the residential(Bull Kwang Dong) and traffic areas(Shin Chon) of Seoul. Using the dose scaling based on body surface area in comparisons of toxicity for extrapolation from animal to human and mathematical models from the high dose region, the low-dose risk was estimated. The response probabilities were estimated by the tolerance distribution models; Probit, Logit and Weibull model. They were consistent with the observed ones at experimental dose region. The unit risk estimates of these models were too low to be used. One-hit and multistage model to prove more conservative risk was selected. As a redult, the lifetime unit risk of benzo(a)pyrene for cancer and virtually safe dose were calculated; One-hit model provided the risk 2.8 $\times 10^{-7}$ and 3.4ng/$m^3$, respectively and multistage model provided 5.2 $\times 10^{-7}$ and 1.9ng/$m^3$ as the more conservatives. The lifetime excess risk estimates of benzo(a)pyrene for cancer were calculated at 0.37-1.30 persons/million persons by one-hit model and 0.69-2.41 persons/million persons by multistage model, which was considered in without virtual risk.

  • PDF