• Title/Summary/Keyword: risk process

Search Result 2,878, Processing Time 0.035 seconds

A Study on the Risk Assessment Criteria to be applicable for Establishing Flight Procedure Design Process (비행절차설계과정에서 적용 가능한 위험평가기준 연구)

  • Kim, Dohyun;Kim, W.Y.;Jie, M.S.
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.21 no.1
    • /
    • pp.51-56
    • /
    • 2013
  • Risk assessment should be processed when physical circumstances of airspace such as establishment of new flight procedures or reconstruction of existing airspace are planned to change and one of the alternatives for the change have to be selected. This is an effort to find the best alternative which is able to maintain at or above the acceptable risk level. ICAO and its contracting states provide specialized guidance material for 'Safety Management System' relating to handing airspace matters. These manuals include a conceptual framework for managing safety as well as some of the systemic processes and criteria used to meet the objectives of a State's safety programme. This criteria must be established in compliance with the State's laws and regulations for air safety and for the fulfillment of the State's safety goals. This study is to carry out the risk assessment criteria through literature reviews relevant to the safety management, and to propose the results of criteria to be applicable for establishing flight procedure design process.

The Safety Assessment of Small WIG Craft in the 20-Passenger Class (20인승급 소형 위그선의 안전성 평가)

  • Lee, Soon-Sup;Lee, Jong-Kap
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.2
    • /
    • pp.179-188
    • /
    • 2009
  • WIG crafts are a high speed vessel with features of dynamic supported craft. These crafts, which are predominantly of light weight and operate any substantially greater speeds than conventional craft such as bulk carrier, tanker, container ship, etc., could not be accommodated under traditional maritime safety instruments. It means that there is the need for risk and safety levels to be assessed on a holistic basis, recognizing that high levels of operator training, comprehensive and thoroughly implemented procedures, high levels of automation and sophisticated software can all make significant contributions to risk reduction. To response this requirement, the Interim Guideline for WIG craft(MSC/Circ.1054) were developed in the view of the configuration of WIG craft, which fall between the maritime and aviation regulatory regimes. This paper reviews a safety assessment process and methodology to be used in the design phase of a new ship. The process and methodology is based on the risk-based approach and is applied to safety assessment in concept development phase of small WIG craft in the 20-person class.

Psychosocial Risk Management in the Teaching Profession: A Systematic Review

  • Wischlitzki, Elisabeth;Amler, Nadja;Hiller, Julia;Drexler, Hans
    • Safety and Health at Work
    • /
    • v.11 no.4
    • /
    • pp.385-396
    • /
    • 2020
  • Teachers are facing various job demands with psychosocial aspects being fundamental due to the nature of the occupation. Although teachers' work is associated with different psychosocial health risks, little is known on how to identify and tackle those. Thus, a systematic literature search as per the PRISMA statement was conducted via MEDLINE (PubMed), PSYNDEX (PubPsych), and ScienceDirect. Two reviewers independently screened 2261 titles and abstracts and 169 full-texts. According to the inclusion criteria established a priori, articles from peer-reviewed journals (English or German) on psychosocial risk management in teachers were incorporated. Despite a comprehensive and sensitive search, only four publications could be identified, outlining a process to implement risk management and different assessment tools. Taken together, data presented in the articles were scarce. Recommendations for process steps and the assessment of psychosocial risks can be derived from the findings. To implement effective psychosocial risk management in the teaching profession, further research is needed, though. Effective and practicable approaches, which are accepted by the target group, should be further developed and investigated. Relevant causes of occupational strain in the teaching profession must be identified and assessed reliably. Low-threshold interventions should be implemented, and the outcome must be evaluated afterward.

Fatigue Risk Management Systems Diagnostic Tool: Validation of an Organizational Assessment Tool for Shift Work Organizations

  • Gemma Maisey;Marcus Cattani;Amanda Devine;Ian C. Dunican
    • Safety and Health at Work
    • /
    • v.13 no.4
    • /
    • pp.408-414
    • /
    • 2022
  • Background: This study aimed to determine and define the elements of an Fatigue Risk Management System (FRMS) diagnostic tool to assist an organization in systematically assessing its level of implementation of an FRMS. Methods: A modified Delphi process was used involving 16 participants with expertise in sleep science, chronobiology, and fatigue risk management within occupational settings. The study was undertaken in two stages 1) review of elements and definitions; 2) review of statements for each element. Each stage involved an iterative process, and a consensus rule of ≥ 60% was applied to arrive at a final list of elements, definitions, and statements. Results: Stage 1: a review of elements (n = 12) and definitions resulted in a final list of 14 elements and definitions with a consensus of ≥ 60% achieved after 2 Delphi rounds. Stage 2: a review of statements (n = 131) resulted in a final list of 119 statements with a consensus of ≥ 60% achieved after 2 Delphi rounds. Conclusion: The final FRMS diagnostic tool will enable an organization to systematically assess the level of implementation of their current FRMS and identify gaps and opportunities to reduce risk.

Risk Prediction Process for Access to Hazard Workplaces in Construction Sites (건설현장 내 위험작업구역 접근 시 위험도 예측 프로세스)

  • Ha, Min-woo;Cho, Yu-jin;Son, Seok-hyun;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.69-70
    • /
    • 2020
  • Accidents in the construction industry are very high compared to other industries, and the number is also increasing steeply every year. Relevant studies were limited for solving the problems. The purpose of this study is to develop a comprehensive risk prediction process for personnel deployed at construction sites on safety management. First of all, the variables were divided into fixed, real-time and working types variables, and the relevant comprehensive data were collected. Second, the probability of a disaster was derived based on the collected data, and weights for each variable were calculated using the dummy regression analysis method using statistical methodology. Lastly, the resulting weighting and disaster probability equation was constructed, and The Final Risk Calculation Formula was developed. The Final Risk Calculation Formula presented in this study is expected to have a significant impact on the establishment of effective safety management measures to prevent possible safety accidents at construction sites

  • PDF

GMP Calculation Process in CM at Risk for Public Construction Project (공공 건설사업 CM at Risk 적용시 GMP 산출 프로세스)

  • Kim, Gun-Sung;Jin, Zheng-Xun;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.48-49
    • /
    • 2020
  • Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.

  • PDF

Better Management (Risk and Change) through NEC Contracts in Hong Kong

  • TUNG, Chu Hoi;MEMON, Shoeb Ahmed;JAVED, Arshad Ali
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.323-330
    • /
    • 2020
  • Project delays, cost overruns, and disputes are becoming a norm for the construction industry in Hong Kong. Researchers argue that the inability of traditional contracts to manage risk and associated changes are perhaps the main points of contention. The Institution of Civil Engineers published a new engineering contract (NEC), NEC4 Suite of Contracts in this to facilitate better risk management through collaborative culture in construction projects. NEC aims to increase the chances of project success thought its flexible nature of contracts, 'simple' and 'clearly written' documents and provision for the incentive by adopting a better management approach. This paper focuses on traditional and NEC contracts to compare risk management and change management aspects. Through literature review and preliminary interviews with three industry professionals, the paper is exploring how a change in traditional contracts can recuperate from disaster. Our interviewees in this work have extensive experience in traditional as well as in NEC contracts. The results suggest a proactive risk management provisions in NEC contracts does make a difference to avoid later escalation of issues. Whereas, management of change helps streamline all identified issues through a structured process without going in mediation or litigation. NEC, with its new approach to collaborative working, allows partners to be vigilant, yet gratifying in the project process.

  • PDF

Effects of Chemical Accident Risk Warning System in High Risk Workplaces of Major Industrial Accidents (중대산업사고 고위험 사업장에서의 화학사고위험경보제의 효과)

  • Woo Sub Shim;Ji Ung Choi
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.5
    • /
    • pp.765-774
    • /
    • 2023
  • The Ministry of Employment and Labor implemented the process safety management(PSM) system from 1996 to prevent major industrial accidents caused by chemical substances, but the number of accidents did not drastically decrease. Even in workplaces with excellent PSM ratings, large-scale chemical accidents still occur due to non-compliance with safety work procedures and insufficient safety measures during maintenance and other work. Accordingly, the chemical accident risk warning system was introduced in 2014 to supplement the PSM system and prevent accidents that may occur during regular or unexpected maintenance and repair work. In the meantime, changes in the safety management system have been checked since the introduction of the chemical accident risk warning system at chemical handling workplaces, and based on the results, a plan for upgrading this system has been proposed. The effect of the CARW system was found to directly prevent accidents through wired and on-site consulting and post-management at the workplace and indirectly contribute to the establishment of a safety and health management system at the workplace, such as improving safety culture awareness.

ASYMPTOTIC RUIN PROBABILITIES IN A GENERALIZED JUMP-DIFFUSION RISK MODEL WITH CONSTANT FORCE OF INTEREST

  • Gao, Qingwu;Bao, Di
    • Journal of the Korean Mathematical Society
    • /
    • v.51 no.4
    • /
    • pp.735-749
    • /
    • 2014
  • This paper studies the asymptotic behavior of the finite-time ruin probability in a jump-diffusion risk model with constant force of interest, upper tail asymptotically independent claims and a general counting arrival process. Particularly, if the claim inter-arrival times follow a certain dependence structure, the obtained result also covers the case of the infinite-time ruin probability.

The Nature of Risk Assessment

  • The Korean Society for Preventive Medicine The Korean Society for Preventive Medicine
    • 대한예방의학회:학술대회논문집
    • /
    • 1994.02a
    • /
    • pp.23-56
    • /
    • 1994
  • Recent criticisms of the conduct and use of risk assessment by regulatory agencies have led to a wide range of proposed remedies, including changes in regulatory statutes and the development of new methods for assessing risk. The mandate to this Committee was more limited. Our objective was to examine whether alterations in institutional arrangements or procedures, particularly the organizational separation of risk assessment from regulatory decision-making and the use of uniform guidelines for inferring risk from available scientific information, can improve federal risk assessment activities. Before undertaking to determine whether organizational and procedural reforms could improve the performance and use of risk assessment in the federal government, the Committee examined the state of risk assessment and the regulatory environment in which it is performed. In this chapter, we define risk assessment and differentiate it from other elements in the regulatory process, analyze the types of judgments made in risk assessment, and examine its current government context. Because one chronic health hazard, cancer, was highlighted in the Committee's congressional mandate and has dominated public concern about public health risks in recent years, most of our report focuses on it. Furthermore, because activities in four agencies--the Environmental Protection Agency (EPA), the Food and Drug Administration (FDA), the Occupational Safety and Health Administration (OSHA), and the Consumer Product Safety Commission (CPSC)--have given rise to many of the proposals for changes in risk assessment practices, our review focuses on these four agencies. The conclusions of this report, although directed primarily at risk assessment of potential carcinogens as performed by these four agencies, may be applicable to other federal programs to reduce health risks.

  • PDF