National Assembly is a constitutional institution that is required to first consult the will of the people and it should do its effort continuously so that security of citizens using parking lot would be enhanced at the same time while improving parking service in order to increase customer satisfaction of the people. Under this recognition, in this study, Doonchi parking lot of National Assembly under consigned management was first reviewed in a perspective of criminal prevention through environmental design(CPTED) and particularly, fence installation and reinforcement work for securing 'territoriality' and operation of all round shooting camera and installation of No-trespassing warning board at entrance were suggested. Second, it was recommended to change independent control system in which CCTV security system of National Assembly Doonchi parking lot is operated separately from National Assembly safety situation room and integrate it with National Assembly safety situation room(revised to double safety system) and performance of CCTV camera was made to be increased to over 2m. In addition, video recording mode was converted to NVR mode for application to IP camera in the future and in order to avoid dead zone of security monitoring area and based on site inspection result, addition 3 places of newly installing CCTV were indicated. Third, it was recommended to introduce parking fare billing and management system through unmanned equipment in parking lot management and operation.(specialized management of professional parking service provider was reviewed). By doing so, risk of cash handling by charging personnel was removed by reducing current 7 working personnel to 3 and particularly, by converting parking lot management mode being operated temporarily from 9 A.M. to 9 P.M. at present to 24 hours operation mode and providing more specialized parking service, citizens visiting National Assembly were provided with convenience and image of National Assembly was also enhanced. This study was carried out in parallel with various literature and case studies, including data from the Office of the Defense Protection in the National Assembly.
Kim, Jeong Yup;Park, Myung Ky;Lee, Gi Ha;Jung, Kwan Sue
Journal of Korea Water Resources Association
/
v.47
no.10
/
pp.891-906
/
2014
This study suggests the hedging rule of MIP (Mixed Integer Programing) in counting the risk evaluation criteria of the objective function and constraints in order to provide the optimum operating rule in reservoir system as constraining water shortage as much as possible which may happen in the downstream control point of water supply in the aspect of water system management. The proposed model is applied to the Han-river reservoir system for two testing periods (Case I: Jan. 1993~Dec. 1997, Case II: Jan. 1999~Dec. 2003). The model based on the hedging rule with trigger volume, estimated in this study shows that in Case I, the monthly minimum discharge was $310.6{\times}10^6m^3$ in the single operation, $56.3{\times}10^6m^3$ in the joint operation, and $317.5{\times}10^6m^3$ in the hedging rule and also, in Case II, the monthly minimum discharge was found to be $204.2{\times}10^6m^3$ in the single operation, $111.2{\times}10^6m^3$ in the joint operation, and $243.7{\times}10^6m^3$ in the hedging rule. In conclusion, the hedging rule, proposed in this study can decrease vulnerability while guarantees reliability and resiliency.
Purpose: The purpose of this study is to examine the directions for establishing a disaster safety village in rural areas where damage from a similar type of disaster occurs repeatedly by conducting the consciousness survey targeting at experts and disaster safety officials in a local government. Method: The risks of disaster in rural areas were examined and the concept and characteristics of disaster safety village which is a measure on the basis of Myeon (township) among the measures of village unit were examined in order to carry out this study. In addition, opinion polling targeting at officials-in-charge in the local government and survey targeting at experts in disaster safety and building village were conducted. Based on the findings, the directions for establishing a disaster safety village that fitted the characteristics of rural areas were examined. Result: The officials-in-charge in the local government answered that rural areas have a high risk of storm and flood such as heavy snowing, typhoon, drought, and heavy rain as well as forest fire, and it is difficult to draw voluntary participation of farmers for disaster management activities due to their main duties. They also replied that active support and participation of residents in rural areas are necessary for future improvement measures. The experts mostly replied that the problem of disaster safety village project is a temporary project which has low sustainability, and the lack of connections between the central government, local governments and residents was stressed out as the difficulties. They said that measures to secure the budget and the directions of project promotion system should be promoted by the central government, local governments and residents together. Conclusion: The results of this study are as follows. First, a disaster safety village should be established in consideration of the disaster types and characteristics. Second, measures to secure the budget for utilizing the central government fund as well as local government fund and village development fund should be prepared when establishing and operating a disaster safety village in rural areas. Third, measures to utilize a disaster safety village in rural areas for a long period of time such as the re-authorization system should be prepared in order to continuously operate and manage such villages after its establishment. Fourth, detailed measures that allow residents of rural areas to positively participate in the activities for establishing a disaster safety village in rural areas should be prepared.
Journal of the Korea Academia-Industrial cooperation Society
/
v.18
no.7
/
pp.635-643
/
2017
This study examines the relationship between emotional labor and depression in dental hygienists. Data were collected from 186 dental hygienists working in dental clinics in Daegu from early March to early April 2016. The survey was composed of questionnaires related to general characteristics, work-related characteristics, emotional labor, and depression. As a result of analyzing the subordinate factors of emotional labor, 57.0% of the factors of 'organization support and protection system' were the highest, and the effect of emotional labor on depression was 'emotionaldisharmony and damage', 'Organizational support and protection system', and especially, the ' emotionaldisharmany and damage' factors were 4.042 times higher than normal. The dental hygienist's degree of emotional labor risk is high, and education, prevention and management measures for emotional labor will be prepared. In addition, emotional labor affects the depression of dental hygienists as well, and comprehensive mental health measures are needed to take into consideration general and occupational characteristics that affect depression.
The cultural properties are damaged by various causes according to the characteristics of material, the condition of preservation, and the period of time. Especially, biodeterioration makes lots of damages in organic properties than inorganic ones. The damages of wooden cultural properties by insects usually are caused by the three orders; Isoptera, Coleoptera, and Hymenoptera. As the result of investigation on the state of 141 buildings of wooden cultural properties in 1999, some of them were damaged by many kinds off actors; wasp, powder post beetle, cigarette beetle, termite, decay, and physical cracking. And it was found that the patterns of damages were related to species-specific habits of insects. There are several methods of pest control for the prevention of wooden cultural properties from damages caused by insects. Those are as follows; physical control, chemical control, biological control, and integrated pest management. When insects and fungi were detected at the wooden buildings, the fumigation is best treatment to stop biodeterioration. And then, wood materials also need to be treated with insecticidal and antiseptic chemicals to avoid a reinfestation, because the fumigant is volatile. The six commercial chemicals which are applied to the insecticidal and antiseptic treatment of wooden cultural properties were purchased to test their abilities. According to the comparative results of efficacy of them in laboratory, chemical D showed excellent efficacy in all items, including antiseptic and termiticidal items. The goal of these pest controls is to protect wooden buildings from insects and microorganisms. The most effective method used currently is chemical control(fumigation, insecticidal and anticeptic chemical treatment), but it has to be treated periodically to control pest effectively. Recently environmentally-friendly control methods such as bait system or biological treatments are replacing traditional barrier treatments using large amounts of chemicals. Especially, termite is a social insect which makes a colony. Although a building with fumigation treatment is safe for a while, once attacked building has a risk of damage by reinfestation of termite. Therefore, to control termites from damaged building, the entire colony including reproductives(queen and king) and larvae around buildings must beeliminated. Bait system can be used as a preventive measure in early detection of them through termites colony monitoring and baiting. It would be the most effective for termite control if bait system would be used together with the chemical controls.
The prevention of marine accidents has been a important topic in marine society for long time, and various safety policies and countermeasures have been developed and applied to prevent those accidents. In spite of these efforts, however, significant marine accidents have taken place intermittently. Ship is being operated under a highly dynamic environments, and many factors are related with ship's collision, whose factors are interacting. So, the analysis on ship's collision causes are very important to prepare countermeasures which will ensure the safe navigation. This study analysed the ship's collision data over the past 10 years(1991-2000), which is compiled by Korea Marine Accidents Inquiry Agency. The analysis confirmed that‘ship's collision’is occurred most frequently and the cause is closely related with human factor. The main purpose of this study is to analyse human factor. For this, the structure of human factor is analysed by the questionnaire methodology. Marine experts were surveyed based on major elements that were extracted from the human factor affecting to ship's collision. FSM has been widely adopted in modeling a dynamic system which is composed of human factors. Then, the structure analysis on the causes of ship's collision using FSM are performed. This structure model could be used in understanding and verifying the procedure of real ship's collision. Furthermore it could be used as the model to prevent ship's collision and reduce marine accidents.
Uniform laws and regulations and reasonable design is necessary for the prevention of possible fire in super high-rise building. To this end, this study focused on super high-rise and massive building-related architectural review performance-based design (PBD) evaluation disaster impact assessment (DIA), and provided fire engineering measures for improving fire prevention on the basis of performance-based design by analyzing the buildings subject to these systems and problems in terms of contents. Above all, in the aspect of law and standard improvement, first, with regard to dual parts of two statutes though significant portion of them has the same contents in performance-based design (PBD) evaluation and disaster impact assessment (DIA), it is necessary to operate the systems after making them conform with each other and consolidating or abolishing them. Second, if it is impossible to consolidate or abolish performance-based design (PBD) evaluation and disaster impact assessment (DIA), the areas of contents of performance-based design (PBD) evaluation and disaster impact assessment (DIA) should be precisely classified and established. Next, engineering improvement measures against fire hazard in super high-rise building are as follows. First, it is necessary to revise the provisions of straight-run stairs in special escape stairs. And in case of installing a mechanical smoke exhaust system instead of smoke vent, sandwich pressurization used in the United Stated should be permitted. Second, with regard to smoke control system for special escape stairs, it was shown that there was necessity for revising the standards in order to enable air to be supplied according to section in case of fire, carrying out performance-based design, and the like from the early design stages to the completion stages. In the future, it is expected that an epoch-making contribution will be made to a decrease in casualties and property damage due to fire in case of super high-rise building where the results can be reflected after carrying out a study on maintenance and carrying out an additional study on other considerations of super high-rise building together with reflecting the improvement measures provided in the above-mentioned study.
Background: CT based brachytherapy allows 3-dimensional (3D) assessment of organs at risk (OAR) doses with dose volume histograms (DVHs). The purpose of this study was to compare computed tomography (CT) based volumetric calculations and International Commission on Radiation Units and Measurements (ICRU) reference-point estimates of radiation doses to the bladder and rectum in patients with carcinoma of the cervix treated with high-dose-rate (HDR) intracavitary brachytherapy (ICBT). Materials and Methods: Between March 2011 and May 2012, 20 patients were treated with 55 fractions of brachytherapy using tandem and ovoids and underwent post-implant CT scans. The external beam radiotherapy (EBRT) dose was 48.6Gy in 27 fractions. HDR brachytherapy was delivered to a dose of 21 Gy in three fractions. The ICRU bladder and rectum point doses along with 4 additional rectal points were recorded. The maximum dose ($D_{Max}$) to rectum was the highest recorded dose at one of these five points. Using the HDRplus 2.6 brachyhtherapy treatment planning system, the bladder and rectum were retrospectively contoured on the 55 CT datasets. The DVHs for rectum and bladder were calculated and the minimum doses to the highest irradiated 2cc area of rectum and bladder were recorded ($D_{2cc}$) for all individual fractions. The mean $D_{2cc}$ of rectum was compared to the means of ICRU rectal point and rectal $D_{Max}$ using the Student's t-test. The mean $D_{2cc}$ of bladder was compared with the mean ICRU bladder point using the same statistical test. The total dose, combining EBRT and HDR brachytherapy, were biologically normalized to the conventional 2 Gy/fraction using the linear-quadratic model. (${\alpha}/{\beta}$ value of 10 Gy for target, 3 Gy for organs at risk). Results: The total prescribed dose was $77.5Gy{\alpha}/{\beta}10$. The mean dose to the rectum was $4.58{\pm}1.22Gy$ for $D_{2cc}$, $3.76{\pm}0.65Gy$ at $D_{ICRU}$ and $4.75{\pm}1.01Gy$ at $D_{Max}$. The mean rectal $D_{2cc}$ dose differed significantly from the mean dose calculated at the ICRU reference point (p<0.005); the mean difference was 0.82 Gy (0.48-1.19Gy). The mean EQD2 was $68.52{\pm}7.24Gy_{{\alpha}/{\beta}3}$ for $D_{2cc}$, $61.71{\pm}2.77Gy_{{\alpha}/{\beta}3}$ at $D_{ICRU}$ and $69.24{\pm}6.02Gy_{{\alpha}/{\beta}3}$ at $D_{Max}$. The mean ratio of $D_{2cc}$ rectum to $D_{ICRU}$ rectum was 1.25 and the mean ratio of $D_{2cc}$ rectum to $D_{Max}$ rectum was 0.98 for all individual fractions. The mean dose to the bladder was $6.00{\pm}1.90Gy$ for $D_{2cc}$ and $5.10{\pm}2.03Gy$ at $D_{ICRU}$. However, the mean $D_{2cc}$ dose did not differ significantly from the mean dose calculated at the ICRU reference point (p=0.307); the mean difference was 0.90 Gy (0.49-1.25Gy). The mean EQD2 was $81.85{\pm}13.03Gy_{{\alpha}/{\beta}3}$ for $D_{2cc}$ and $74.11{\pm}19.39Gy_{{\alpha}/{\beta}3}$ at $D_{ICRU}$. The mean ratio of $D_{2cc}$ bladder to $D_{ICRU}$ bladder was 1.24. In the majority of applications, the maximum dose point was not the ICRU point. On average, the rectum received 77% and bladder received 92% of the prescribed dose. Conclusions: OARs doses assessed by DVH criteria were higher than ICRU point doses. Our data suggest that the estimated dose to the ICRU bladder point may be a reasonable surrogate for the $D_{2cc}$ and rectal $D_{Max}$ for $D_{2cc}$. However, the dose to the ICRU rectal point does not appear to be a reasonable surrogate for the $D_{2cc}$.
Given that single blockade with angiotensin-converting enzyme inhibitors (ACEIs) or angiotensin receptor blockers (ARBs) can achieve only partial and undurable suppression of the Renin Angiotensin System (RAS), it has been hypothesized that dual blockage would be more beneficial in the management of blood pressure (BP) reduction and prevention of progressive chronic kidney disease (CKD) than either agent alone. Thus, it has been suggested that the combination of an ACEI and an ARB might provide renal benefits to hypertensive patients over and above BP reduction. However, this might also expose patients to additive or synergistic side effects. We attempted to conduct a systematic review to evaluate the benefits and harms of combination therapy in hypertensive patients with or without kidney diseases. MEDLINE and KoreaMed were searched for relevant randomized clinical trials in adult hypertensive patients with or without diabetes (restricted to 1997, limited to trials published in English). Results were summarized using the random-effects model, and between-studies heterogeneity was estimated with $I^2$. A final analysis of ten trials (23,928 patients) revealed that the combination of an ACEI and an ARB reduced blood pressure (SBP/DBP) by 3.95/2.02 mmHg (95% confidence interval [CI], -4.38 to -3.53/-2.33 to -1.71) compared with ACEI monotherapy, and 2.83/2.64 mmHg (95% CI, -3.25 to -2.41/-4.95 to -0.33) compared with ARB monotherapy. Eight trials (391 patients) demonstrated a significant reduction in 24h-proteinuria (weighted mean difference, 0.16 g/day, 95% CI, -0.26-0.05), but they did not translate into an improvement in GFR. Tests for heterogeneity showed no difference in effect among the studies. The combination therapy reduced proteinuria by 30% (95% CI, 23% to 37%) and 39% (95% CI, 31% to 48%) compared with ACEI monotherapy and ARB monotherapy, respectively. However, in patients who had proteinuria more than 0.5 g/day, the combination therapy failed to show significant reduction in urinary protein excretion. The current cumulative evidence suggests that diabetic patients with proteinuria on dual RAS blockade have an increase risk of adverse events such as hyperkalemia, hypotension, and so on, compared with ACEI or ARB alone. It is, therefore, proposed that the combination therapy should not be routinely used for the treatment of hypertension with or without compelling indications.
The characteristic of fire and explosion related to electrostatic discharge is that it is difficult to reproduce the electrostatic charge and discharge phenomenon in addition to the large human and material damage. Therefore, in order to prevent accidents and disasters related to electrostatic in fire and explosion hazard areas, it is important to manage the level of electrostatic in a safe manner from the perspective of system between industrial facilities and human bodies. Rule 325 of the Occupational Safety and Health Regulations, "Prevention of Fire / Explosion due to Electrostatic", requires the use of grounding, conductive materials, humidification and electrification in order to prevent the risk of disaster caused by static explosion and electrostatic in the production process. In order to comply with these measures, related technologies, standards and systems are needed from the viewpoint of preventive measures related to electrostatic in fire and explosion hazard areas, but in Korea, it is still insufficient. Therefore, technical, institutional and managerial measures are needed as a precautionary measure to improve the level of ESD safety in fire and explosion hazard areas and prevent electrostatic related injury. In Korea, we analyzed the current status and characteristics of electrostatic related disaster by using the statistics of industrial accident and fire statistics of the Ministry of Employment and Labor. We also analyzed the current status and characteristics of electrostatic related disasters in Japan using JNIOSH accidents and disasters investigation cases and JNIOSH fire accident data of Japan Fire Bureau. The purpose of this study is to compare and analyze the current status of electrostatic related accidents and disasters in Korea and Japan in order to improve the safety management of electrostatic in fire and explosion hazard areas. In order to prevent accidents and disasters in the industrial field, The technical, institutional, and managerial measures to manage the level of electrostatic in a safe state were derived from the system point of view.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.