Risk analysis using PROMETHEE method In Building Construction MANAGEMENT

  • Jang-Young Lee;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1364-1369
    • /
    • 2009
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopt the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE method makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to prove the possibility of the PROMETHEE analysis process by being compared with AHP.

  • PDF

위험분석 모델을 적용한 정량적인 소프트웨어 위험관리 방법론에 관한 연구 (A Study on Quantitative Software Risk Management Methodology applied Risk Analysis Model)

  • 엄정호;이동영;정태명
    • 디지털산업정보학회논문지
    • /
    • 제5권2호
    • /
    • pp.133-140
    • /
    • 2009
  • In the paper, we proposed the systematical and quantitative software risk management methodology based on risk analysis model. A software risk management consists of the basic risk management method(BRIMM) and the detailed risk management method(DRIMM). BRIMM is applied to unimportant phases or the phase which also the risk factor does not heavily influence to project. DRIMM is used from the phase which influences highly in project success or the phase where the risk factor is many. Fulfilling risk management combined two methods, we can reduce project's budget, term and resource's usage, and prevent risk with the optimum measures obtained by the exact risk analysis.

연약지반을 대상으로 한 프로젝트 리스크와 현장계측의 과제와 대책 (Project Risk Management & Observational Method for soft ground improvement)

  • 이마니시 하지메
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.509-514
    • /
    • 2006
  • Considering the risk management, there are many examples and various studies for the corporation risk. However, I have never seen the project risk management that applied a construction site for practical approach. Therefore, I have developed a chart (I-Chart) for the project risk management, and also built a model (I-Chart scenario analysis) that I could use. I applied this model to container yard reclaimed land in harbor construction with approaching of geotechnical engineering.

  • PDF

프로젝트관리 성숙도별 리스크관리 적용 (On the Application of Risk Management by Levels of Project Management Maturity)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제34권2호
    • /
    • pp.19-29
    • /
    • 2011
  • The uncertainty of a project generates risks hindering the goal achievement of the project, and the risks affect the success or failure of the project significantly. Risk management, a part of the project management, includes various processes, and there are also various tools or techniques applicable to that. In an organization, the application of project management develops gradually from low to high maturity, and the organization should choose and implement a method of application proper for the level of its maturity. This article suggests a method to reduce inefficiency of the management and how to apply risk management by levels of maturity for easier application. For this, the stages of project management maturity levels were divided into the introduction, development, and maturity step, and methods of risk management suitable for each stage were applied. And methods of risk management that need to be applied by the levels of project maturity are divided into three factors : risk management processes, risk management tools and techniques, and risk management standards and templates. It is expected to be favorable approaches for the application of risk management in an organization to divide those factors into more concrete processes, tools, techniques, and standards and apply them by the levels of management maturity.

위험도 개념을 적용한 교량 자산관리의 성능평가방법 연구 (A study on Risk-based Bridge Performance Evaluation Method for Asset Management)

  • 최현호;선종완;박경훈
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.22-32
    • /
    • 2013
  • 일반적인 사회기반시설물 자산관리 절차는 기존 자산의 명확한 정보획득, 서비스수준의 설정, 요구수준의 분석, 재정상태와 가용예산의 분석, 자산관리 계획의 준비, 수정된 자산의 정보 획득 순으로 구성될 수 있다. 본 연구에서는 실제적인 위험도분석 기반의 개선된 교량 자산관리를 위하여 필요한 상태평가 및 성능측정, 성능척도의 설정, 파손형태 및 위험도 분석 등에 대한 방법론을 제시하였다. 보다 효율적인 교량 관리를 위하여 위험도 고려가 필요한 교량 기본현황정보 및 성능척도 항목을 설정하였고, 정량적 정성적 위험도를 고려한 성능평가방법을 제안하였다. 위험정도와 발생가능성을 고려한 위험도 매트릭스를 이용한 성능평가방법은 교량의 서비스수준을 보다 합리적으로 추정할 수 있다. 제안된 위험도분석 절차와 방법이 접목된 교량 서비스수준 평가방법을 이용하면 보다 합리적인 자산관리 의사결정이 가능하며, 향후 최적의 유지관리 의사결정을 위한 자산관리 체계구축 및 시스템 개발에 기여할 수 있을 것으로 판단된다.

4D객체 활용에 의한 건설공사 리스크 인자별 중요도 시각화 기법연구 (Visualizing Method of 4D Object by Weight of Construction Risk Factors)

  • 강인석;박서영;김창학;문현석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.571-573
    • /
    • 2006
  • 본 연구에서는 리스크관리 인자별 중요도와 4D 객체 시각화방법론을 통한 리스크관리 정보의 시각화 모델을 제안한다. 리스크관리 프로세스 모델은 WBS(Work Breakdown Structure)와 RBS(Risk Breakdown Structure)를 통해 구성되며, RBS에서 분류된 리스크 인자는 퍼지 분석기법을 통해 중요도(Weight)가 분석된다. 이 중요도는 4D 시각화를 위한 건설공사 객체(Object)의 속성 데이터로 지정된다. 또한 Object의 4D 시각화를 위한 방안으로는 4D 시뮬레이션기법이 활용되며, 등급별로 구분된 리스크 인자의 중요도와 4D 시뮬레이션을 통해 직접적인 건설공사 부위별 리스크관리 수준 확인과 부위별 리스크 인자의 시각화가 가능하도록 하는 방법론을 제시한다.

  • PDF

The Relationship on Risk Type, Risk Management and Business Performance - Evidence from Korean FDIs in China

  • Yin, Heng-Bin;Kim, Bo-Hyun;Jung, Hong-Joo
    • Journal of Korea Trade
    • /
    • 제23권5호
    • /
    • pp.45-65
    • /
    • 2019
  • Purpose - As the well-known Structure-Conduct-Performance paradigm implies, risk structure of a corporation may affect its risk management activity and the activity may in turn determine its performance. Depending on its goal, Foreign Direct Investment (FDI) can shape its risk structure, risk management and its performance. Under this assumption, we investigate the relationship between the goals of FDI and risk management for the first time in academics. Design/methodology - This empirical research uses a survey of 279 current Korean enterprises' FDIs in China with the recently developed business risk quadrant model. Companies are classified into either a market- or an efficiency-seeking group, to identify how each group perceives and manages risks, and values the performance of risk management. Also, we apply integrated risk management method that multinational corporations have introduced in China, then verify the mediating effect between risk factors and performance. Findings - Our research shows the FDIs can expose themselves to differing risk structure although risk management activities simply represent the level of empowerment given to local management by headquarter due to limit of sample size despite diversity of risk and risk management tools. To sum, market seekers are found to have more strategic risk (revenue related risk) than efficiency seekers with financial risk (cost related risk). The market seekers can manage their risk by empowering their local organisation while the efficiency does the opposite ways. The risk management appears to be successful in general. Originality/value - Previous studies on small and medium enterprises' FDIs to China have concentrated on the analysis of entry determinants, withdrawal factors and individual risk management. Meanwhile, this research establishes enterprise-wide risk factors faced by the companies that advance into China, according to the method of the classification by ERM and verifies if they could synthetically improve performance through risk corresponding measures.

PRACTICAL APPROACHES TO RISK MANAGEMENT FOR GLOBAL CONTRACTORS

  • Seung Heon Han;Du Yon Kim;Han Him Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1231-1236
    • /
    • 2005
  • Global construction projects manifest more risks than do other industries. Often, firms doing business in construction markets find these risks intimidating. To secure corresponding profits, many global contractors attempt to forecast the effects of risks and establish risk management strategies. However, one key problem with present-day risk management methods is that they are basically analytical or mathematical-oriented approaches which are not easy to adopt in real business. Based on preliminary investigations and evaluations of current tools, this research elicits more practical algorithms for risk checklist by constructing risk scenarios over the whole period of project execution. For the application of the algorithms, a "SE/RF" (Source-Event/Regular-Floating) checklist is suggested, which sorts out risk sources and their subsequent events, as well as dividing various risk factors into either regular or floating categories. In addition, the "PIS" (Probability-Impact-Significance) method is introduced, in place of traditional "PI" (Probability-Impact) methods, by adding the additional criterion of "risk significance" to determine the degree of risk exposure in a more realistic way. As a result, we draw the significant finding that the "PIS" method presents a closer evaluation regarding degree of risk exposure as compared to the level of expert judgments than those from traditional methods. Finally, we provide an integrated procedure for international project risk management with all of the research achievements being incorporated.

  • PDF

정성적 위험분석 단계에서 중간위험 집중형 위험도 산정 방법 (Risk Value Calculation Method for Moderate Risk Concentration Type at Qualitative Risk Analysis Phase)

  • 김선규
    • 한국건설관리학회논문집
    • /
    • 제16권2호
    • /
    • pp.38-45
    • /
    • 2015
  • 건설위험관리 프로세스의 위험분석단계는 정성적 및 정량적 위험분석단계로 세분화되는데, 정성적 위험분석이 주된 역할을 하고 정량적 위험분석은 보조적인 역할을 담당한다. 그런데 이제까지 정성적 위험분석단계에서 위험도를 계량화하는 방법으로 적용되어온 위험도 산정 공식은 발생확률과 영향을 단순히 곱하는 식으로서 결과 값들은 저위험도에 편중된 분포를 나타낸다. 이에 대한 대안으로 고위험도에 편중되는 산정 공식이 제안되었으나, 위험도 분포가 저위험도 또는 고위험도에 편중하게 될 경우 대부분의 자연현상이 정상분포에 가깝다는 통계학적인 일반논리에 부합되지 않는다. 본 연구에서는 위험도의 분포가 중앙에 집중되는 새로운 위험도 산정방법을 제안하고자 한다. 이를 통해 위험도 분포가 자연현상의 정상분포와 유사한 형식으로 표현됨으로써 위험에 대응하는 수준이 고위험도 또는 저위험도에 치우지지 않고 중간위험도에서 합리적으로 선택될 수 있게 하고자 한다. 나아가 위험도 산정방법에 대한 추가적인 선택사항을 제공함으로써 위험분석 방법의 융통성과 합리성을 향상시키는데도 일조하고자 한다.

건축물의 화재위험의 분석과 지수화에 관한 연구 (A Study on Fire Risk Analysis & Indexing of Buildings)

  • 정의수;양광모;하정호;강경식
    • 대한안전경영과학회지
    • /
    • 제10권4호
    • /
    • pp.93-104
    • /
    • 2008
  • A successful fire risk assessment is depends on identification of risk, the analytical process of potential risk, on estimation of likelihood and the width and depth of consequence. Take the influence on enterprise into consideration, Fire risk assessment could carry out along the evaluation of the risk importance, the risk level and the risk acceptance. A large part of the limitation of choosing the risk assessment techniques impose restrictions on expense and time. If it is unnecessary high level risk assessment or Probabilistic Risk Assessment of buildings, in compliance with the Relative Ranking Method, Fire risk indexing and assessing is possible. As working-level technique, AHP method is useful with practical technique.