• Title/Summary/Keyword: risk factors of remodeling project

Search Result 6, Processing Time 0.025 seconds

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

The Analysis of Risk Factors for Apartment Remodeling Feasibility Study (공동주택 리모델링 사업성 평가를 위한 위험요소 분석)

  • Lee Teck-Wn;Kim Kyoon-Tai;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.84-92
    • /
    • 2002
  • Recently, apartment-remodeling project is booming since various reconstruction controls are tightened. However, the project has difficulties because management systems used for apartment-remodeling projects are not available. Identifying and analyzing risk factors that are required for risk management, this paper suggests the risk level through paired comparison performed by AHP method and probability assessment for risk level analysis. It is expected that this research will be utilized to minimize the risk of apartment remodeling project and for basic materials to perform the project and helpful to change newly build-oriented construction into sustainable industries. Hereafter using the risk factor analysis data of this paper for this research project, risk management model is considered to be constructed.

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

A Probabilistic Risk-based Cost Estimation Model for Initial-Stage Decision Making on Apartment Remolding Projects (공동주택 리모델링 초기 단계 의사결정을 위한 확률론적 리스크 기반 비용 예측 모델 개발)

  • Lee, Dong-gun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.70-79
    • /
    • 2016
  • The current remodeling cost estimation process is not only dependent on the historical data of new building construction, but it also has a poor linkage with risk-based estimation approach. As such, there is a high risk of falling short of initial budget. To overcome this, a risk-based estimation approach is necessary by providing a probabilistic estimation in consideration of the potential risk factors in conducting the remodeling projects. In addition, the decision-making process should be linked with the risk-based estimation results in stead of intuitive and/or experience-based estimation. This study provides a probabilistic estimation process for residential remodeling projects by developing a detailed methodology in which a step-by-step approach can be achieved. The new proposed estimation approach can help in decision-making for remodeling projects in terms of whether to proceed or not, by effectively reflecting the potential risk factors in the early stage of the project. In addition, the study can enhance the reliability of the estimation results by developing a sustainable estimation process model where a risk-based evaluation can be accomplished by setting up the cost-risk relationship database structure.

Analysis on Priority of Influence Factors for Management of Vertical-extension Remodeling Project (수직증축 리모델링공사의 효율적 관리를 위한 영향요인 분석)

  • Lee, Dong-Heon;Lim, Hyoung-chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.314-321
    • /
    • 2016
  • After the 1980s, as the economy was growing rapidly and the real estate market was active, a large increase in population was supplied to the city. Accordingly, the national apartment housing market is located in the form of Urban Housing Culture. On the other hand, with time, the supply apartment houses became superannuated and the residential environment became poor. Therefore, the environment of old apartment houses has been changed to improve by reconstruction. Despite this, reconstruction incurred not only a lot of construction waste, but also problems of environmental degradation, noise, traffic congestion, increasing number of households, and so on. Recently, the housing law has changed, and vertical extension remodeling focused on Small/Medium Town House is underway. This has been changed in response to the demand. This is one of essential parts in the remodeling field for the future, even though it has some problems in how uses existing buildings. Therefore, this study analyzed occurrence risk factor for each type through research materials and case analysis regarding the vertical extension remodeling of apartment housing. In addition, the relative importance was determined through questionnaires and interviews from constructors, designers, and experts in the field.

A Study on Analysis of Damaged Facilities in Rural Area by Storm and Flood Hazard (풍수해에 의한 농촌지역 피해시설 현황 분석)

  • Lim, Chang-Su;Oh, Yun-Kyung;Lee, Seung Chul;Kim, Eun-Ja;Choi, Jin-Ah
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.2
    • /
    • pp.19-29
    • /
    • 2016
  • Disasters that occur most frequently in rural areas are drought, flood, damages from wind and cold weather. Among these, damages from storm and flood and drought are the main disasters and recently, these are occurring on a large scale due to unusual weather conditions. Under such circumstances, projects and researches on disasters in rural areas are under way but they are mostly targeting one area or making approaches focusing on repair facilities, maintenance project of facilities in small streams, and disaster management, so there have not been enough studies on the current status of overall damaged facilities in the rural areas. Against this backdrop, through the analysis of the current status of damaged facilities due to storm and flood in rural areas, this study aims to provide base data for policies needed for disaster recovery planning and maintenance work of rural areas. For the analysis of damaged facilities due to storm and flood in rural areas, using the annual report on disasters issued by Ministry of Public Safety and Security and based on the occurrence rate of estimated damage in each city and district for the past 10 years(2004~2013), 8 areas with the highest number of occurrence and cost of damage were found from each province and target areas were selected. Then, regarding the selected target areas, the General Plan for Reducing Damages from Storm and Flood, which is the report on top-level plan for preventing disasters, was secured and the current status of damaged facilities were analyzed. After organizing the analysis of current status, the tendency of damaged facilities due to storm and flood in rural areas, the items of damaged facilities depending on the types of storm and flood damages, and risk factors were suggested. Based on this result, in order to generalize the results of follow-up researches, it is thought that disaster recovery planning and establishing the system of remodeling items necessary for maintenance work would be possible by analyzing damage investigation items recorded in additional researches on rural areas, researches on natural disasters, and recovery plan instructions and by conducting on-site investigation on the damaged villages from storm and flood in rural areas.