• Title/Summary/Keyword: resource constraint

Search Result 206, Processing Time 0.023 seconds

Price-based Resource Allocation for Virtualized Cognitive Radio Networks

  • Li, Qun;Xu, Ding
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.10
    • /
    • pp.4748-4765
    • /
    • 2016
  • We consider a virtualized cognitive radio (CR) network, where multiple virtual network operators (VNOs) who own different virtual cognitive base stations (VCBSs) share the same physical CBS (PCBS) which is owned by an infrastructure provider (InP), sharing the spectrum with the primary user (PU). The uplink scenario is considered where the secondary users (SUs) transmit to the VCBSs. The PU is protected by constraining the interference power from the SUs. Such constraint is applied by the InP through pricing the interference. A Stackelberg game is formulated to jointly maximize the revenue of the InP and the individual utilities of the VNOs, and then the Stackelberg equilibrium is investigated. Specifically, the optimal interference price and channel allocation for the VNOs to maximize the revenue of the InP and the optimal power allocation for the SUs to maximize the individual utilities of the VNOs are derived. In addition, a low‐complexity ±‐optimal solution is also proposed for obtaining the interference price and channel allocation for the VNOs. Simulations are provided to verify the proposed strategies. It is shown that the proposed strategies are effective in resource allocation and the ±‐optimal strategy achieves practically the same performance as the optimal strategy can achieve. It is also shown that the InP will not benefit from a large interference power limit, and selecting VNOs with higher unit rate utility gain to share the resources of the InP is beneficial to both the InP and the VNOs.

Verification of ERP Standard Time Using TOC Technique and Improvement of MES Routing Point (TOC 기법을 적용한 ERP 표준시간 검증 및 MES 공정실적개선)

  • Kim, Sung-Min;Ahn, Jaekyoung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.4
    • /
    • pp.22-33
    • /
    • 2018
  • Recently domestic manufacturing companies have been experiencing worsening profitability and stunted growth due to the long-term economic recession and the rapid rise of developing countries such as China and Southeast Asia. These difficulties force many companies to concentrate their core competencies on new value creation and innovation in order to gain momentum for new growth. Enterprise Resource Planning (ERP) has been considered as one of viable solutions. Among the various modules in ERP, shop floor control function in the production management module is rather limited. In order to overcome this problem, Manufacturing Execution System (MES) has been used as a subsystem which has a strong information gathering power and flexibility. Both systems interact closely with each other. In particular, ERP requires fast, accurate shop floor information at MES. This paper describes how to synchronize relevant information between ERP and MES with theory of constraints (TOC). The processing time information transmitted from the MES workplace is received at the ERP workplace. In the process, the received processing time is causing information distortion in ERP, when the information gathering standard of MES is different from the ERP information interpretation standard. The Drum-Buffer-Rope theory of TOC was applied to resolve this problem, therefore, information synchronization between both systems was made. As a precondition, the standard time of the upper ERP system was rearranged according to the capacity constraints resource. As a result, standard time restructuring has affected changes in labor costs. Standard labor costs have come close to actual ones, and information synchronization of MES transmission data has improved the reliability of standard product costs, such that it enabled various company-wide restructuring actions to be much more effective.

OPTIMAL PERIOD SELECTION TO MINIMIZE THE END-TO-END RESPONSE TIME

  • SHIN M.;LEE W.;SUNWOO M.
    • International Journal of Automotive Technology
    • /
    • v.6 no.1
    • /
    • pp.71-77
    • /
    • 2005
  • This paper presents a systematic approach which determines the optimal period to minimize performance measure subject to the schedulability constraints of a real-time control system by formulating the scheduling problem as an optimal problem. The performance measure is derived from the summation of end-to-end response times of processed I/Os scheduled by the static cyclic method. The schedulability constraint is specified in terms of allowable resource utilization. At first, a uniprocessor case is considered and then it is extended to a distributed system connected through a communication link, local-inter network, UN. This approach is applied to the design of an automotive body control system in order to validate the feasibility through a real example. By using the approach, a set of optimal periods can easily be obtained without complex and advanced methods such as branch and bound (B&B) or simulated annealing.

Task Scheduling Algorithm for the Communication, Ocean, and Meteorological Satellite

  • Lee, Soo-Jeon;Jung, Won-Chan;Kim, Jae-Hoon
    • ETRI Journal
    • /
    • v.30 no.1
    • /
    • pp.1-12
    • /
    • 2008
  • In this paper, we propose an efficient single-resource task scheduling algorithm for the Communication, Ocean, and Meteorological Satellite. Among general satellite planning functions such as constraint check, priority check, and task scheduling, this paper focuses on the task scheduling algorithm, which resolves conflict among tasks which have an exclusion relation and the same priority. The goal of the proposed task scheduling algorithm is to maximize the number of tasks that can be scheduled. The rationale of the algorithm is that a discarded task can be scheduled instead of a previously selected one depending on the expected benefit acquired by doing so. The evaluation results show that the proposed algorithm enhances the number of tasks that can be scheduled considerably.

  • PDF

Audio Resource Adaptation (오디오 신호의 적응 방법)

  • 오은미
    • Proceedings of the IEEK Conference
    • /
    • 2003.07d
    • /
    • pp.1419-1422
    • /
    • 2003
  • Multimedia contents what we call Digital Items include various types of resources such as music, speech, text, video, graphics, and so on. The current Adaptation QoS described in the ISO/IEC 21000-7 CD-Part 7: Digital Item Adaptation, however, lacks adaptation methods for audio signals. The goal of this paper is to provide adaptation methods that are necessary to deal with audio signals. Two operations are introduced in order to adapt audio items. One method is to make use of the functionality of Fine Grain Scalability, and the other is intended to drop the channel of audio output channel. This paper provides a DIA description tool that associates the operators with the corresponding values of the constraint and the utility. Furthermore, the operations are evaluated and compared to alternative solutions.

  • PDF

A Two-Stage Heuristic for Capacitated Disassembly Scheduling (자원제약을 고려한 분해 일정계획 문제에 대한 2 단계 발견적 기법)

  • Jeon, Hyong-Bae;Kim, Jun-Gyu;Kim, Hwa-Joong;Lee, Dong-Ho
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.715-722
    • /
    • 2005
  • Disassembly scheduling is the problem of determining the quantity and timing of disassembling used products while satisfying the demand of their parts or components over a planning horizon. The case of single product type with assembly structure is considered for the objective of minimizing the sum of disassembly operation and inventory holding costs. In particular, the resource capacity constraint is explicitly considered. The problem is formulated as an integer programming model, and a two-stage heuristic with construction and improvement algorithms is suggested in this paper. To show the performance of the heuristic, computational experiments are done on a number of randomly generated problems, and the test results show that the algorithm can give near optimal solutions within a very short amount of computation time.

  • PDF

Selection Method of Alternatives for Considering Correlation between Component Elements in Remodeling Design Process (리모델링 설계단계에서 부위구성요소의 상관관계를 고려한 대안선정 방법)

  • Park Chan-Gil;Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.53-61
    • /
    • 2004
  • As remodeling project is progressed in the constraint which is utilization of existing resource, the subject of remodeling and extend of construction are affected by the correlation between building element. Therefore, this research analyze the correlation between component of building element in the design phase and proposed the diagram model for correlation between building element and proposed selection method of alternative plan for optimized combination of building element in remodeling project.

The Maximum Installable DG Capacity According to Operation Methods of Voltage Regulator in Distribution Systems (배전계통의 전압조정기 운영방법에 따른 분산형전원 최대 도입 용량 산출)

  • Kim, Mi-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.7
    • /
    • pp.1263-1269
    • /
    • 2009
  • Stable and sustainable power supply means maintaining a certain level of power quality and service while securing energy resource and resolving environmental issues. Distributed generation (DG) has become an essential and indispensable element from environmental and energy security perspectives. It is known that voltage violation is the most important constraint for load variation and the maximum allowable DG. In distribution system, sending voltage from distribution substation is regulated by ULTC (Under Load Tap Changer) designed to maintain a predetermined voltage level. ULTC is controlled by LDC (Line Drop Compensation) method compensating line voltage drop for a varying load, and the sending voltage of ULTC calls for LDC parameters. The consequence is that the feasible LDC parameters considering variation of load and DG output are necessary. In this paper, we design each LDC parameters determining the sending voltage that can satisfy voltage level, decrease ULTC tap movement numbers, or increase DG introduction. Moreover, the maximum installable DG capacity based on each LDC parameters is estimated.

Extended Proportional Fair Scheduling for Statistical QoS Guarantee in Wireless Networks

  • Lee, Neung-Hyung;Choi, Jin-Ghoo;Bahk, Sae-Woong
    • Journal of Communications and Networks
    • /
    • v.12 no.4
    • /
    • pp.346-357
    • /
    • 2010
  • Opportunistic scheduling provides the capability of resource management in wireless networks by taking advantage of multiuser diversity and by allowing delay variation in delivering data packets. It generally aims to maximize system throughput or guarantee fairness and quality of service (QoS) requirements. In this paper, we develop an extended proportional fair (PF) scheduling policy that can statistically guarantee three kinds of QoS. The scheduling policy is derived by solving the optimization problems in an ideal system according to QoS constraints. We prove that the practical version of the scheduling policy is optimal in opportunistic scheduling systems. As each scheduling policy has some parameters, we also consider practical parameter adaptation algorithms that require low implementation complexity and show their convergences mathematically. Through simulations, we confirm that our proposed schedulers show good fairness performance in addition to guaranteeing each user's QoS requirements.

Porting of Z-Stack and Implementation of UART on the TI CC2530 (TI CC2530 상의 Z-Stack 이식 및 UART 구현)

  • Kim, Byungsoon
    • Journal of Digital Contents Society
    • /
    • v.13 no.4
    • /
    • pp.525-530
    • /
    • 2012
  • Wireless sensor networks consist of resource constraint devices which typically send data measured by sensors attached to the end devices towards a coordinator. One of the best solution for wireless sensor networks is ZigBee, where it is wireless standard introduced for low power, low cost wireless communication with moderate data rates. In this paper, we present porting of Z-Stack and implementation of UART on the TI CC2530. We show that our implemented board works correctly in terms of transmitting and receiving data via serial port.