• Title/Summary/Keyword: repair efficiency

Search Result 271, Processing Time 0.027 seconds

IR-RBT Codes: A New Scheme of Regenerating Codes for Tolerating Node and Intra-node Failures in Distributed Storage Systems

  • Bian, Jianchao;Luo, Shoushan;Li, Wei;Zha, Yaxing;Yang, Yixian
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.13 no.10
    • /
    • pp.5058-5077
    • /
    • 2019
  • Traditional regenerating codes are designed to tolerate node failures with optimal bandwidth overhead. However, there are many types of partial failures inside the node, such as latent sector failures. Recently, proposed regenerating codes can also repair intra-node failures with node-level redundancy but incur significant bandwidth and I/O overhead. In this paper, we construct a new scheme of regenerating codes, called IR-RBT codes, which employs intra-node redundancy to tolerate intra-node failures and serve as the help data for other nodes during the repair operation. We propose 2 algorithms for assigning the intra-node redundancy and RBT-Helpers according to the failure probability of each node, which can flexibly adjust the helping relationship between nodes to address changes in the actual situation. We demonstrate that the IR-RBT codes improve the bandwidth and I/O efficiency during intra-node failure repair over traditional regenerating codes but sacrifice the storage efficiency.

Network Coding for Energy-Efficient Distributed Storage System in Wireless Sensor Networks

  • Wang, Lei;Yang, Yuwang;Zhao, Wei;Lu, Wei
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.7 no.9
    • /
    • pp.2134-2153
    • /
    • 2013
  • A network-coding-based scheme is proposed to improve the energy efficiency of distributed storage systems in WSNs (Wireless Sensor Networks). We mainly focus on two problems: firstly, consideration is given to effective distributed storage technology; secondly, we address how to effectively repair the data in failed storage nodes. For the first problem, we propose a method to obtain a sparse generator matrix to construct network codes, and this sparse generator matrix is proven to be the sparsest. Benefiting from this matrix, the energy consumption required to implement distributed storage is reduced. For the second problem, we designed a network-coding-based iterative repair method, which adequately utilizes the idea of re-encoding at intermediate nodes from network coding theory. Benefiting from the re-encoding, the energy consumption required by data repair is significantly reduced. Moreover, we provide an explicit lower bound of field size required by this scheme, which implies that it can work over a small field and the required computation overhead is very low. The simulation result verifies that the proposed scheme not only reduces the total energy consumption required to implement distributed storage system in WSNs, but also balances energy consumption of the networks.

Evaluation of Bonding Performance in UHPC-based Concrete Repair Materials Considering Surface of Structure Subject to Repair (보수대상 구조 표면 상태를 고려한 UHPC 기반 콘크리트 보수재료의 부착 성능 평가)

  • Yong-Sik Yoon;Kyong-Chul Kim;Kwang-Mo Lim;Gi-Hong An;Gum-Sung Ryu;Kyung-Taek Koh
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.11 no.4
    • /
    • pp.433-439
    • /
    • 2023
  • In this study, the bonding performance of repair materials was evaluated on concrete repair surface to develop concrete repair materials based on UHPC (Ultra High Performance Concrete) which has high mechanical and durability performance. The ten test variables were applied considering the roughness and wet condition of the concrete surface subject to repair, the addition of polymer, and the use PP and PVA fibers in repair materials. The addition of the polymer caused a significant decrease in strength, which was thought to be due to the effect of the additional super plasticizer used to adjust workability. Also, flow was reduced by up to 13.8 % with the use of plastic-based fibers. As a result of evaluating the bond strength of the repair material considering the condition of the surface subject to repair, it was thought that in the case of using UHPC-based repair material, high bonding performance could be secured without any additional surface treatment as long as the surface of the base material was sound. In addition, UHPC-based repair materials showed high bonding performance even when the attachment surface was wet. In the future, research will be conducted on shot-crete application and gradient pouring for the development of UHPC-based repair materials, and continuous improvement in the repair material mixing property will be carried out to ensure economic efficiency and performance as a concrete structural repair material.

Yeonggwang #1/2 steam condenser leakage repair works (영광 #1/2 복수기 누수부 보수공사)

  • 이상철;공창식
    • Proceedings of the KWS Conference
    • /
    • 2003.05a
    • /
    • pp.117-119
    • /
    • 2003
  • Power plant efficiency and availability depend greatly on condenser performance. However, during commissioning of Yeonggwang #1/2 steam condenser sodium leakage occurred, because of tube to tubesheet only roll expanding. Therefore this report is explaining that pre-test for the shake of improvement reliable repair processes & selected sampling tube re-expansion in-situ applications.

  • PDF

Antifuse Circuits and Their Applicatoins to Post-Package of DRAMs

  • Wee, Jae-Kyung;Kook, Jeong-Hoon;Kim, Se-Jun;Hong, Sang-Hoon;Ahn, Jin-Hong
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.1 no.4
    • /
    • pp.216-231
    • /
    • 2001
  • Several methods for improving device yields and characteristics have been studied by IC manufacturers, as the options for programming components become diversified through the introduction of novel processes. Especially, the sequential repair steps on wafer level and package level are essentially required in DRAMs to improve the yield. Several repair methods for DRAMs are reviewed in this paper. They include the optical methods (laser-fuse, laser-antifuse) and the electrical methods (electrical-fuse, ONO-antifuse). Theses methods can also be categorized into the wafer-level(on wafer) and the package-level(post-package) repair methods. Although the wafer-level laser-fuse repair method is the most widely used up to now, the package-level antifuse repair method is becoming an essential auxiliary technique for its advantage in terms of cost and design efficiency. The advantages of the package-level antifuse method are discussed in this paper with the measured data of manufactured devices. With devices based on several processes, it was verified that the antifuse repair method can improve the net yield by more than 2%~3%. Finally, as an illustration of the usefulness of the package-level antifuse repair method, the repair method was applied to the replica delay circuit of DLL to get the decrease of clock skew from 55ps to 9ps.

  • PDF

A Design and Implementation of Bidding and Scheduling System for Ship Repair (선박수리를 위한 입찰 및 일정관리 시스템의 설계 및 구현)

  • Kang, Hyo-woon;Kim, Jindeog
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.19 no.7
    • /
    • pp.1585-1592
    • /
    • 2015
  • Currently, the existing schedule management of ship repair has depended on hand-written notes of engineering manager in the repair ship yard. Simple management based on the hand-written notes is inefficient because current states of equipments and staff are not graspable in real-time. To solve this problem, the ICT based scheduling method is required in ship repair industry. In this paper, we propose a system based on ICT which manages schedules for repairing ships. The proposed system solves the problem occurred by the management to use the hand-written notes. Because the system has a function to report the current state of ship repair, it is able to cope with various problems, such as delay, wrong repair and so on. Moreover, the system is able to maximize the efficiency of ship repair process due to efficient management to staff and equipment.

A Study on the Method and Application of Shaft Repair using Directed Energy Deposition Process (직접식 에너지 용착 공정을 활용한 축 보수 방법 및 활용 사례 연구)

  • Lee, Yoon Sun;Lee, Min Kyu;Sung, Ji Hyun;Hong, Myeong Pyo;Son, Yong;An, Seouk;Jeong, Oe Cheol;Lee, Ho Jin
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.20 no.9
    • /
    • pp.1-10
    • /
    • 2021
  • Recently, the repair and recycling of damaged mechanical parts via metal additive manufacturing processes have been industrial points of interest. This is because the repair and recycling of damaged mechanical parts can reduce energy and resource consumption. The directed energy deposition(DED) process has various advantages such as the possibility of selective deposition, large building space, and a small heat-affected zone. Hence, it is a suitable process for repairing damaged mechanical parts. The shaft is a core component of various mechanical systems. Although there is a high demand for the repair of the shaft, it is difficult to repair with traditional welding processes because of the thermal deformation problem. The objective of this study is to propose a repair procedure for a damaged shaft using the DED process and discuss its applications. Three types of cases, including a small shaft with a damaged surface, a medium-size shaft with a worn bearing joint, and a large shaft with serious damage, were repaired using the proposed procedure. The microstructure and hardness were examined to discuss the characteristics of the repaired component. The efficiency of the repair of the damaged shaft is also discussed.

A study on estimation status and improvement plan of the repair and replacement cycle of a building (건축물 수선교체주기 산정현황과 개선방안에 관한 연구)

  • Kim, Jong-Rok;Son, Jae-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.193-198
    • /
    • 2010
  • This study aimed at presenting the improvement plan for estimation of the repair and replacement cycle to analyze these current problems by considering the repair and replacement cycle theoretically and examining estimation status of home and abroad, and then drawing implication and problem based on brainstorming and expert opinion. The findings of a study is as follows. First, the problem is, for the domestic, that there is no clear standard of division to the cycle of repair and replacement and the repair and replacement cycle considering capability to deal with the change by construction method, development of the function of material and the number of years of progress is not being applied. That is, an estimation of economical repair and replacement cycle which considers the case that a large scale repair with the level of remodeling is done between 25 years and 35 years is necessary. For estimating the repair and replacement cycle, foreign country is providing this according to the use or the level of function of a building, but it is not the case for the domestic. A characteristic of each building should be reflected and the standard of estimation of the repair and replacement cycle to new construction material or method should be prepared to improve this. In addition, the method of classification of the subject item for the repair and replacement is necessary to be reorganized to be able to apply the standard of initial construction item of a building. Also, it is considered that a service standard which can reset the repair and replacement cycle based on status of a building with escape from the existing definite setup of the repair and replacement cycle through the management of background data of the repair and replacement is going to be necessary.

A study on advanced EMU's maintenance program on test operation in Dabul line (차세대 전동차 대불선 시운전 시 유지보수방안 연구)

  • Kim, Young-Kyu;Park, Se-Young;Song, Jeong-Hun;An, Cheon-Heon;Lee, Han-Min
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2215-2222
    • /
    • 2010
  • Advanced EMU have been enhanced in terms of safe transport and maintainability. It is a new urban railway technology that enables an operation institution to cut repair and maintenance costs and customers to use convenient service at lower costs based on IT technology. If a development vehicle of Advanced EMU is completed, it will be used to test the entire advanced EMU system through sufficient performance check and reliability check prior to operation in commercial line. It will also verify efficiency, safety, punctuality and energy efficiency of transport. Accordingly, it is necessary to figure how to repair and maintain vehicles to enhance safety of Advanced EMU system in cooperation with operation during the period of comprehensive evaluation on the operation of a development vehicle in a test line. In this paper, we investigated the maintenance program of Advanced EMU on test operation in Dabul line. The test condition and operation environment of Advanced EMU in Daebul line was analyzed.

  • PDF

A Study on the Maintenance System for Mail Sorting Machine (우편 구분 기계 유지 보수 방식에 관한 연구)

  • Park, Jeong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.11
    • /
    • pp.3200-3206
    • /
    • 2009
  • This paper describes the problem of existing maintenance system for mail sorting machnies, and presents to-be considerations of maintenance system based on AHP (Analytic Hierarchy Process) analysis with efficiency and economic aspects. There are standard procedure for diagnosis and repair of mail sorting machine as preventive and operational maintenance, roles and missions of maintenance technical support center for upgrade of maintenance skill in this paper. The proposed maintenance system will be adapted for more safety and efficiency maintenance of mail sorting machine.