• Title/Summary/Keyword: repair and maintenance cost

Search Result 324, Processing Time 0.027 seconds

A Case Study of Life Cycle Cost Analysis on Pavements in Apartment Complex (단지내 도로포장별 생애주기 비용 분석(LCCA) 사례 연구)

  • Jung, Jong-Suk;Park, Yong-Boo;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.5 no.4
    • /
    • pp.297-303
    • /
    • 2014
  • Recently, block and permeable pavements have been placed in apartment complex. However. it is hard to decide the cycle of maintenance and repair due to lack of performance evaluation criteria for these pavements. This study carried out life cycle cost analysis(LCCA) to present resonable alternatives of the pavements by considering initial construction cost, maintenance and repair cost along with the cycle of repair. According to results of LCCA, the interlocking concrete block pavement is the best alternative when the repair cycle of 20years is assumed, while asphalt concrete pavement is the best alterative when the repair cycle of 10years is assumed. Therefore, the repair cycle is most important factor to select alternative. Also, it is necessary to develop resonable performance evaluation index to quantify the cycle of maintenance and repair in the future.

Optimal Number of Failures before Group Replacement under Minimal Repair

  • Young Kwan, Yoo
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.1
    • /
    • pp.61-70
    • /
    • 2004
  • In this paper, a group replacement policy based on a failure count is analysed. For a group of identical repairable units, a maintenance policy is performed with two phase considerations: a repair interval phase and a waiting interval phase. Each unit undergoes minimal repair at failure during the repair interval. Beyond the interval, no repair is made until a number of failures. The expected cost rate expressions under the policy is derived. A method to obtain the optimal values of decision variables are explored. Numerical examples are given to demonstrate the results.

Framework on a Prediction Model for Building Repair & Maintenance Using Big Data Analytic Approach (Big Data 분석 방법론을 이용한 건물 유지보수 예측 모형 기본 방안 개발)

  • Lee, Eun-Ji;Choi, Byoung-Il;Ko, Yong-Ho;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.114-115
    • /
    • 2013
  • The maintenance and repair period consists the largest part of a construction project life cycle cost. However, it has been analyzed that the repairing plan relies on regulations and the officers' experience mostly that sometimes lead to performing unnecessary work. Moreover, the data occurred during repairing have not been stored in a system that can be used in future plans. Therefore, the purpose of this study is to suggest a repairing cost and time predicting model by applying the properties of the building.

  • PDF

Cost Analysis Model for Minimal Repair in Free-Replacement Policy (무상수리 정책에서 응급수리 적용의 비용분석 모델)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.241-247
    • /
    • 1997
  • This paper is concerned with cost analysis model in free-replacement policy. The free-replacement policy with minimal repair is considered as follows; in a manufacturer's view point operating unit is periodically replaced, if a failure occurs between minimal repair and periodic maintenance time, unit is remained in a failure condition. Also unit undergoes minimal repair at failures in minimal-repair interval. Then total expected cost is calculated according to the parameter of failure distribution in a view of consumer's. The expected costs are included repair cost and usage cost: operating, fixed, minimal repair and loss cost. Numerical example is shown in which failure time of item has weibull distribution.

  • PDF

Repair Cost Analysis for RC Structure Exposed to Carbonation Considering Log and Normal Distributions of Life Time (탄산화에 노출된 철근콘크리트 구조물의 로그 및 정규 수명분포를 고려한 보수비용 해석)

  • Woo, Sang-In;Kwon, Seung-Jun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.6 no.3
    • /
    • pp.153-159
    • /
    • 2018
  • Many researches have been carried out on carbonation, a representative deterioration in underground structure. The carbonation of RC (Reinforced Concrete) structure can cause steel corrosion through pH drop in concrete pore water. However extension of service life in RC structures can be obtained through simple surface protection. Unlike the conventional deterministic maintenance technique, probabilistic technique can consider a variation of service life but it deals with only normal distributions. In the work, life time-probability distributions considering not only normal but also log distributions are induced, and repair cost estimation technique is proposed based on the induced model. The proposed technique can evaluate the repair cost through probabilistic manner regardless of normal or log distribution from initial service life and extended service life with repair. When the extended service life through repair has log distribution, repair cost is effectively reduced. The more reasonable maintenance strategy can be set up though actual determination of life-probability distribution based on long term tests and field investigations.

A Study on the Analyses of Defect Occurrences and its Repair Costs in the Public Equipment of an Deteriorated Apartment House (노후 아파트 공용설비부문의 하자발생과 보수비용 분석에 관한 연구)

  • 전규엽;조극래;홍원화
    • Journal of the Korean housing association
    • /
    • v.14 no.4
    • /
    • pp.11-19
    • /
    • 2003
  • This study intends to predict prospective defects and establish the plan of Preventive Maintenance through research and analysis of defect occurrences and their repair costs in the public equipment of ‘H’ apartment house from 1998 to 2001. According to results of the analysis, more than 90% of defects and their repair costs for 4 years of the building have occurred in heating, hot water and water supply equipments. In case of specific classification in each equipment, more than 60% of defects were found at hot water pipes and heating pipes, and their repair costs covered more than 60% of the total defect costs. After two repairs by ‘Preventive Maintenance’ had been performed in the year 1998, total defects and defects of each equipment each yew have increased in number from 1999 to 2001. But total repair costs and repair costs of each equipment have not increased as time has gone by, because repair costs have relationship with the price of materials and labor, the part of defect and the scale of repair.

Cost Optimization of Ineffective Periodic Preventive Maintenance

  • Jung, Gi-Mun;Park, Dong-Ho;Yum, Joon-Keun
    • Communications for Statistical Applications and Methods
    • /
    • v.6 no.1
    • /
    • pp.99-106
    • /
    • 1999
  • This paper considers an imperfect repair model for which the repairable system is maintained preventively at periodic times and is replaced by a new system when a predetermined number of preventive maintenance has been applied. our main objective of this is to determine the optimal number of preventive maintenances before the system is replaced and the optimal length of interval between two consecutive preventive maintenances under a new repair model which is referred to as an ineffective preventive maintenance. Such a model assumes a periodic preventive maintenance in which the system is effectively maintained with a certain probability. Otherwise the system is not improved at all after each maintenance and thus the failure rate remains the same as before. The criteria to determine the optimal number of preventive maintenances and length of period is the expected cost rate per unit time for an infinite time span. We give the explicit expressions for the expected cost rate per unit time. Some numerical examples are presented for illustrative purposes.

  • PDF

Identification of Core Items for Repair Works of Apartment Housing by Evaluating Necessity of Repair Work and Buren of Repair Cost (수선필요도와 비용부담도 평가를 통한 공동주택 수선공사 핵심항목 도출방안)

  • Song, Sanghoon;Lee, Seok-Je;Park, Seong-Sik
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.79-86
    • /
    • 2016
  • Purpose: Frequently, the apartment management offices have difficulties in effective repair works due to their insufficient technological capability to operate long-term repair program. There also have been many cases of failure in executing urgent repairs mainly because the repair allowance has not accumulated enough for the repair works on time. This study aimed to determine core items in apartment maintenance in order to reduce the confusion and unnecessary efforts for the management office by suggesting simple list of repair items. Method: Core items are defined using several indicators. The degrees of necessity for repair work(NRW) are calculated combining the impacts to living, safety, and aesthetics. Then the degrees of burden of repair cost(BRC) are estimated by analyzing actual long-term repair program of three apartment complexes. Lastly the degrees of accumulation demand for repair allowance(AD) are calculated with NRW and BRC. Result: The core items and essential items are suggested for three apartment types as case studies based on the indicators of NRW, BRC, and AD. Then, the required accumulated allowance per $m^2$ was calculated to effectively implement repair works.

Repair Accumulation Cost for the Long-Term Repair Plan in Multifamily Housing Using the Forecasting Model of the Repair Cost (공종별 수선비용 추계모델을 활용한 공동주택 장기수선충당금 적립금액 산정)

  • Lee, Kang-Hee;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.16 no.3
    • /
    • pp.137-143
    • /
    • 2016
  • Purpose: Apartment housing should conduct a cyclic repair to keep and maintain the building performance since they are constructed. Therefore, the repair plan would be provided for long term period which explains the repair time, items and repair cost. Residents of apartment housing are responsible to pay for the repair activities. For repair cost, residents would reserve the money for repair little by little continuously until the required repair time because the repair cost takes a big burden for residents and lots of money a time. But, there is no systematic approach to provide the long term repair cost because it is no proper forecast of the repair cost to the upcoming repair time. In this study, it aimed at providing the monthly accumulation of the long term repair cost with the survey data in Seoul. Method: For these, the surveyed data are classified into 6 categories and number of data are 1,918. In addition, it developed the repair cost model for the 24 repair works and the cumulation function which is reflected with the each cost model. Result: This study are shown as follows : First, among the various estimation for the repair cost, the power function has a goodness of fit in statistics. Second, the monthly accumulation would be 12,840 won/household in size of $100,000m^2$ management area and $81.7won/m^2$ in size of the 1,000 household number during 40 years.

Preventive maintenance model with extended warranty (연장된 보증을 갖는 예방보전모형)

  • Jung, Ki Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.24 no.4
    • /
    • pp.773-781
    • /
    • 2013
  • Recently, an extended warranty of the system following the expiration of the basic warranty is becoming increasingly popular to the user. In this respect, we suggest a preventive maintenance model following the expiration of extended warranty with minimal repair warranty from the user's point of view in this paper. Under basic warranty and extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user. For the preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the numerical examples are presented to illustrate the purpose when the failure time of the system has a Weibull distribution.