• Title/Summary/Keyword: rehabilitation of asphalt pavement

Search Result 28, Processing Time 0.023 seconds

아스팔트 콘크리트 포장의 최소단면 보수공법 개발을 위한 기초연구 (A Preliminary Study on Effective Rehabilitation Technique of Asphalt Concrete Pavement)

  • 조명환;김낙석;조규태;진정훈
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2007년도 정기총회 및 학술발표대회
    • /
    • pp.475-478
    • /
    • 2007
  • The major distresses in asphalt concrete pavement are rutting and fatigue cracking. Once the distresses are observed on pavement surface, an appropriate rehabilitation method should be found. Usually, asphalt patching or overlay methods are used to improve the pavement performance. The research presents the fundamental study on effective longitudinal rehabilitation methods for asphalt concrete pavements. The rehabilitation method will be applied to rutting that is occurred asphalt Pavement surface course and longitudinal cracking or fatigue cracking with light to moderate distress levels.

  • PDF

고속도로 노후 콘크리트 포장 보강의 경제성 분석 사례 연구 (Case Studies of the Life Cycle Cost Analysis for Rehabilitation of Deteriorated Expressway Concrete Pavements)

  • 서영찬;박지원;김찬우
    • 한국도로학회논문집
    • /
    • 제18권3호
    • /
    • pp.33-45
    • /
    • 2016
  • PURPOSES : Concrete pavement has been used in the construction of the Jungbu expressway in 1987. More than 60% of the pavement on the expressway is currently made of concrete, but most has been used far beyond their design life. Pavement life has been extended through routine maintenance or overlay. However, the structural capacity of the pavement has reached its limit, and extensive rehabilitation/reconstruction with long time traffic blocking should be considered. The three following issues on concrete rehabilitation/reconstruction will be discussed: (1) economic comparison of asphalt inlay and asphalt overlay, (2) economic comparison preventive overlay on a section which is currently good and routine overlay on the section which will be poor, and (3) economic analysis of early-strength concrete when it is used in concrete reconstruction. METHODS : First, various life cycle cost analysis tools were compared, and the proper tool for the extensive rehabilitation/reconstruction was selected. Second, a sensitivity analysis of the selected tool was performed to find the influential input variables, which should be carefully selected in the analysis. Third, three case studies, which can be issues in the rehabilitation/reconstruction of the expressway concrete pavement in Korea, were performed. RESULTS : Asphalt overlay without milling the deteriorated concrete showed 18~25% lower life cycle cost than the current asphalt inlay with milling. The good current preventive overlay on the section was economically justified within the scope of this study. The construction cost limit of the early strength concrete was suggested to be economical for 1, 3, and 7 days of construction alternative opening. CONCLUSIONS : CA4PRS was a viable tool for comparing various rehabilitation/reconstruction issue alternatives. Several concrete issues associated with the rehabilitation/reconstruction of the deteriorated concrete pavement were discussed as mentioned above.

도심지 아스팔트 포장의 유지보수공법 의사결정 절차 개선 (Improvement of a Decision Tree for The Rehabilitation of Asphalt Pavement in City Road)

  • 박창규;김원재;김태우;이진욱;백종은;이현종
    • 한국도로학회논문집
    • /
    • 제20권3호
    • /
    • pp.27-37
    • /
    • 2018
  • PURPOSES : The objective of this study is to develop a pavement rehabilitation decision tree considering current pavement condition by evaluating severity and distress types such as roughness, cracking and rutting. METHODS : To improve the proposed overall rehabilitation decision tree, current decision tree from Korea and decision trees from other countries were summarized and investigated. The problem when applying the current rehabilitation method obtained from the decision tree applied in Seoul was further analyzed. It was found that the current decision trees do not consider different distress characteristics such as crack type, road types and functions. Because of this, different distress values for IRI, crack rate and plastic deformation was added to the proposed decision tree to properly recommend appropriate pavement rehabilitation. Utilizing the 2017 Seoul pavement management system data and considering all factors as discussed, the proposed overall decision tree was revised and improved. RESULTS :In this study, the type of crack was included to the decision tree. Meanwhile current design thickness and special asphalt mixture were studied and improved to be applied on different pavement condition. In addition, the improved decision tree was incorporated with the Seoul asphalt overlay design program. In the case of Seoul's rehabilitation budget, rehabilitation budget can be optimized if a 25mm milling and overlay thickness is used. CONCLUSIONS:A practical and theoretical evaluation tool in pavement rehabilitation design was presented and proposed for Seoul City.

국도 아스팔트 콘크리트 포장의 보수공법 결정 기준 연구 (Development of Rehabilitation Criteria of National Highway Pavement)

  • 김다혜;권수안;서영찬;임광수
    • 한국도로학회논문집
    • /
    • 제11권2호
    • /
    • pp.37-44
    • /
    • 2009
  • 현재 국도 PMS(Favement Management System)에서 적용하고 있는 보수공법결정체계는 소성변형과 균열의 기준치값에 대한 설정 근거가 명확하지 않다. 본 연구에서는 일반국도에서 아스팔트 콘크리트 포장의 보수 시 보수공법결정기준에 대한 근거를 제시하기 위한 것이다. 이를 위해 전국 일반국도 아스팔트 포장 구간을 대표할 수 있는 대표 구간을 선정하고, 포장전문가 패널(panel)을 선정하여 선정된 구간을 대상으로 패널이 대표구간을 평가하여 보수공법을 제안하였다. 포장전문가 패널이 대표구간을 평가한 결과를 분석하여 다음과 같이 보수공법 결정 기준의 근거를 마련하였다. 균열의 경우 절삭 덧씌우기를 요구하는 균열율은 35%, 덧씌우기 이상의 기준으로서 균열율 20%를 제안하였다. 소성변형의 경우 절삭 덧씌우기를 필요로 하는 소성변형 값은 13mm, 덧씌우기 이상을 요구하는 소성변형의 기준으로서 10mm를 사용할 것을 제안하였다.

  • PDF

노후화된 시멘트 콘크리트 포장에 대한 콘크리트 및 아스팔트 덧씌우기의 포장성능 비교 (Comparison of the Pavement Performance for Concrete Overlay and Asphalt Overlay on Aged Cement Concrete Pavement)

  • 이승우;손현장
    • 한국도로학회논문집
    • /
    • 제13권2호
    • /
    • pp.31-39
    • /
    • 2011
  • 국내 고속도로의 60% 이상이 시멘트 콘크리트 포장으로 건설되었으며, 그 중 공용년수가 20년이 넘어선 구간이 절반 이상에 달하고 있다. 노후화된 시멘트 콘크리트 포장의 보수 보강은 국내의 교통여건상 우회도로가 준비되기 어렵기 때문에 조기 교통개방이 요구되며 현재까지는 주로 아스팔트 덧씌우기가 사용되고 있다. 반면에 아스팔트 덧씌우기 포장은 조기 파손으로 인해 많은 유지보수비용이 지출됨과 동시에 도로사용자의 불편을 초래하고 있다. 최근 들어 노후화 된 시멘트 콘크리트 포장의 효율적인 보강공법으로 접착식 콘크리트 덧씌우기 공법에 대해서 적용을 시도하고 있다. 따라서 아스팔트 덧씌우기 포장과 접착식 콘크리트 덧씌우기 포장의 합리적인 선택에 대한 비교 분석을 위해 포장의 연도별 파손상태에 대한 다양한 data가 필요하다. 하지만, 국내에서는 아스팔트 덧씌우기 포장과 접착식 콘크리트 덧씌우기 포장의 공용 중 파손상태에 대한 자료가 체계적으로 구축되어있지 않다. 본 연구에서는 아스팔트 덧씌우기와 접착식 콘크리트 덧씌우기 공법이 적용된 구간의 파손에 대해 충분한 자료를 구축하고 있는 미국의 LTPP Data를 이용하여, 공용성에 대해서 평가하였다. 단, 아스팔트 덧씌우기와 접착식 콘크리트 덧씌우기 공법은 파손형태가 서로 상이함으로써, 상대적인 비교를 위해 각각의 구간에 대해 포장상태지수(PCI, Pavement Condition Index)를 Database화 하였으며, 아스팔트 덧씌우기 구간과 접착식 콘크리트 덧씌우기 구간의 수명에 대해서 비교 분석을 수행하였다.

국도 아스팔트 포장의 NHPCI(National Highway Pavement Condition Index)를 활용한 보수공법그룹 결정에 관한 연구 (A Study for Determining the Rehabilitation Method Group using NHPCI on Asphalt Concrete Pavement of National Highway)

  • 손현장;권수안;이재준;백철민;임재규;신현진
    • 한국도로학회논문집
    • /
    • 제15권2호
    • /
    • pp.1-9
    • /
    • 2013
  • PURPOSES : The PMS(Pavement Management System) has been utilized in order to efficiently allocate the limited budget for the maintenance of national highway system. In the PMS of national highway, surface pavement condition is evaluated by using the VI (Visual Index). However, the VI is determined only by considering the cracking rate (%) and rut depth (mm), which is not reflecting the IRI (International Roughness Index) that is known as an important factor of pavement performance. In this study, the NHPCI (National Highway Pavement Condition Index) which includes the cracking rate (%), rut depth (mm), and IRI (m/km) is suggested for determining the rehabilitation methods group. METHODS : First, the rehabilitation methods performed between 2008 and 2010 on the national highway is classified and then, NHPCI is determined for each rehabilitation method. Next, the NHPCI for each rehabilitation method is grouped through the interval estimation of the population mean and T-test analysis. RESULTS : According to NHPCI range, the rehabilitation methods are divided into four categories: Not Required, Preventive Maintenance, Overlay Treatment (with or without cutting), and Full-scale Treatment (i.e., reconstruction). CONCLUSIONS : Based on this study, it is recommended that the appropriate NHPCI range should be determined through the combination of the rehabilitation categories and Decision Procedure of Pavement Distress Condition Visual Index.

포장가속시험 및 경제성 분석을 통한 절삭 덧씌우기와 비절삭 덧씌우기의 비교 (Comparison of Asphalt Concrete Inlay and Overlay for Rehabilitation of Aged Cement Concrete Pavement through Accelerated Pavement Testing and Life-Cycle Cost Analysis)

  • 서영찬;권홍준;이응준
    • 한국도로학회논문집
    • /
    • 제19권6호
    • /
    • pp.75-81
    • /
    • 2017
  • PURPOSES : So far, aged cement concrete pavement on express highways has been rehabilitated mainly with asphalt concrete inlay. However, potholes were the major problem, and they shortened the life of the inlay mainly owing to the poor drainage of water once it infiltrated the interface of the concrete and asphalt. The purpose of this study is to compare the performance and economic efficiency of asphalt overlay and inlay. METHODS : Overlay and inlay were compared through accelerated pavement testing, and a life-cycle cost analysis was conducted in this study using the CA4PRS program. RESULTS and CONCLUSIONS : It was found from accelerated pavement testing that the overlay exhibited reflective crack resistance that was more than twice as effective as that of inlay. The total cost (construction cost + user cost) within the analysis period (20 years) of the overlay was 37% lower than that of the inlay.

확률적 포장 공용성 예측모델 개발 방법론 (Methodology of a Probabilistic Pavement Performance Prediction Model Based on the Markov Process)

  • 유평준;이동현
    • 한국도로학회논문집
    • /
    • 제4권4호
    • /
    • pp.1-12
    • /
    • 2002
  • 포장유지관리체계는 신설포장의 공용 이후 포장 유지보수를 실시함에 있어 기술적으로 타당하고 경제적으로 효율적인 보수전락을 적용하는 것을 목표로 한다. 이를 위해서는 신뢰성 있는 포장공용성 예측모델을 필요로 한다. 본 연구에서는 마르코프 체인 이론에 기초한 확률적 포장공용성 예측 시스템을 제안하고, 아스팔트 포장으로의 적용상 문제점 등을 기술하였다. 본 연구 결과로서 아스팔트 포장의 공용성 예측을 위한 포장상태 전이행렬을 정의하였으며, 정량적인 포장공용 수명평가 결과를 제시하였다.

  • PDF

성능보증제도를 적용한 일반국도 유지보수공사 시범사업 (Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance)

  • 임재규;김용주;김명일;이재준
    • 한국도로학회논문집
    • /
    • 제20권1호
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

현장가열재생 아스팔트 포장의 현재 미국 내의 적용 현황 연구: 문헌조사 (Investigation of Current Practice on Hot In Place Recycling (HIR) in USA: Literature Review)

  • 임정혁;조성환;황성도
    • 한국도로학회논문집
    • /
    • 제16권2호
    • /
    • pp.73-89
    • /
    • 2014
  • PURPOSES : The objective of this study is to investigate the current state of the practice, examining the steps in the process recommended by various agencies and the Asphalt Recycling and Reclaiming Association (ARRA)-namely mix design, structural design, structural capacity evaluation, and material characterization-in order to better understand the implications of hot in-place recycling (HIR). METHODS : In addition, the current practice of state departments of transportation (DOTs) is here reviewed with the purpose of learning from successful past experiences so as to forestall any difficulties that may emerge under similar circumstances. Also, HIR benefits, including reduced costs, improved construction processes, and environmental friendliness are presented, as well as advantages and disadvantages of HIR application. RESULTS : Most of the United States highway system is now deteriorating so that rehabilitation or reconstruction techniques are required for the most distressed roads, taking into account ways to increase the effectiveness of existing budgets. Several options are available in rehabilitating distressed roads, and the choice among these depends on many factors, including pavement distress condition, funding, and design life. Among these techniques, Hot In-Place Recycling (HIR) has emerged as a cost-effective treatment for deteriorated pavements, and has been proven an effective long-term strategy for pavement rehabilitation.