1 |
Collura, J. et al. (2010), "Evaluation and Implementation of Traffic Simulation Models for Work Zones.", No. Project No. NETC 05-8.
|
2 |
Crovetti, J. (2005), "Early opening of Portland cement concrete pavements to traffic.", Final Report Wis consin DOT, SPR#0092-01-04.
|
3 |
FHWA (2004) "Real Cost USER MANUAL.", https://www.fhwa.dot.gov/infrastructure/asstmgmt/rc210704.pdf.
|
4 |
Hall, K. T. et al. (2003), "Guidelines for life-cycle cost analysis of pavement rehabilitation strategies.", TRB 2003.
|
5 |
Han, D. S., et al. (2007), "Life Cycle Cost Analysis of Pavement Maintenance Standard Considering User and Socio-Environmental Cost.", Journal of the Korean Society of Civil Engineers D, 27(6D), 727-740.
|
6 |
Jung, J. S. et al. (2002), "Life Cycle Cost Analysis: Conventional Versus Asphalt-Rubber Pavements.", Rubber Pavements Association.
|
7 |
Kang, W. P., et al. (2013), "A study on the minimization of water damage for the asphalt inlay of old concrete pavement", International Journal of Highway Engineering, 15(4), 53-63.
DOI
|
8 |
Kim, G. M. (2007), "Multi-Agent based Simulation System for Construction Operations with Traffic Congestion.", doctorate thesis, Civil Engineering, Chung-Ang Univ.
|
9 |
Korea Society of Road Engineers.Pyeonghwa Engineering, Inc.(2015), "Remodeling Strategies for Dealing with Deterioration of Expressway Pavements (II)".
|
10 |
Kumara, M. W., et al. (2006), "Evaluation of early strength requirement of concrete for slab replacement using accelerated pavement testing.", Journal of transportation engineering, 132(10), 781-789.
DOI
|
11 |
Larmie, E. A., et al. (2005), "Rehabilitation and main tenance of road pavements using highway early strength concrete.", SHA, SP208B49 Final Report.
|
12 |
Lee E. B. (2011), "CA4PRS USER MANUAL.", http://www.dot.ca.gov/hq/research/roadway/ca4prs/index.htm.
|
13 |
MOLIT (2004-2014), "Statistical Yearbook.", Ministry of Land, Infrastructure and Transport. http://www.road.re.kr.
|
14 |
Lee, E. B., et al. (2011), "Selection of Pavement for Highway Rehabilitation Based on Life-Cycle Cost Analysis", Transportation Research Record: Journal of the Transportation Research Board, (2227), 23-32.
|
15 |
Lee, M. R., et al. (2013), "Capacity of Urban Freeway Work Zones."Journal of The Korean Society of Civil Engineers, 33(3), 1123-1130.
DOI
|
16 |
MOLIT (2013), "Korea Highway Capacity Manual.", Ministry of Land, Infrastructure and Transport.
|
17 |
MOLIT (2013), "Transportation Facility Investment Evaluation Guidelines.", Ministry of Land, Infrastructure and Transport.
|
18 |
Park, G. J.(2014), "A decision-making system with dual stages for rehabilitation method considering the transportation management on expressways.", doctorate thesis, Civil Engineering, Chung-Ang Univ.
|
19 |
Pyeon, J. H., et al. (2012), "Cost Estimate Modeling of Transportation Management Plans for Highway Projects.", MTI Report II-24, No. CA- MTI-12-1007.
|
20 |
Peterson, K. R., et. al. (2005). "Final Report for Early-Opening-to-Traffic Portland Cement Concrete for Pavement Rehabilitation.", Transportation Research Board of the National Academies, Project 18-4B.
|
21 |
Park, H., et. al. (2004), "A Study on Standard Guidelines for Prefeasibility Study on Road and Railway Projects.", Korea Development Institute.
|
22 |
Suh, Y. C., (2011), "Load Simulation Testing for the Asphalt Overlay of Deteriorated Concrete Pavement.", International Pavement Engineering Conference(IPEC), KSRE.
|