• Title/Summary/Keyword: rehabilitation of asphalt pavement

Search Result 28, Processing Time 0.028 seconds

A Preliminary Study on Effective Rehabilitation Technique of Asphalt Concrete Pavement (아스팔트 콘크리트 포장의 최소단면 보수공법 개발을 위한 기초연구)

  • Jo, Myoung-Hwan;Kim, Nak-Seok;Cho, Gyu-Tae;Jin, Jung-Hoon
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.475-478
    • /
    • 2007
  • The major distresses in asphalt concrete pavement are rutting and fatigue cracking. Once the distresses are observed on pavement surface, an appropriate rehabilitation method should be found. Usually, asphalt patching or overlay methods are used to improve the pavement performance. The research presents the fundamental study on effective longitudinal rehabilitation methods for asphalt concrete pavements. The rehabilitation method will be applied to rutting that is occurred asphalt Pavement surface course and longitudinal cracking or fatigue cracking with light to moderate distress levels.

  • PDF

Case Studies of the Life Cycle Cost Analysis for Rehabilitation of Deteriorated Expressway Concrete Pavements (고속도로 노후 콘크리트 포장 보강의 경제성 분석 사례 연구)

  • Suh, Young-Chan;Park, Ji-Won;Kim, Chan-Woo
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.33-45
    • /
    • 2016
  • PURPOSES : Concrete pavement has been used in the construction of the Jungbu expressway in 1987. More than 60% of the pavement on the expressway is currently made of concrete, but most has been used far beyond their design life. Pavement life has been extended through routine maintenance or overlay. However, the structural capacity of the pavement has reached its limit, and extensive rehabilitation/reconstruction with long time traffic blocking should be considered. The three following issues on concrete rehabilitation/reconstruction will be discussed: (1) economic comparison of asphalt inlay and asphalt overlay, (2) economic comparison preventive overlay on a section which is currently good and routine overlay on the section which will be poor, and (3) economic analysis of early-strength concrete when it is used in concrete reconstruction. METHODS : First, various life cycle cost analysis tools were compared, and the proper tool for the extensive rehabilitation/reconstruction was selected. Second, a sensitivity analysis of the selected tool was performed to find the influential input variables, which should be carefully selected in the analysis. Third, three case studies, which can be issues in the rehabilitation/reconstruction of the expressway concrete pavement in Korea, were performed. RESULTS : Asphalt overlay without milling the deteriorated concrete showed 18~25% lower life cycle cost than the current asphalt inlay with milling. The good current preventive overlay on the section was economically justified within the scope of this study. The construction cost limit of the early strength concrete was suggested to be economical for 1, 3, and 7 days of construction alternative opening. CONCLUSIONS : CA4PRS was a viable tool for comparing various rehabilitation/reconstruction issue alternatives. Several concrete issues associated with the rehabilitation/reconstruction of the deteriorated concrete pavement were discussed as mentioned above.

Improvement of a Decision Tree for The Rehabilitation of Asphalt Pavement in City Road (도심지 아스팔트 포장의 유지보수공법 의사결정 절차 개선)

  • Park, Chang Kyu;Kim, Won Jae;Kim, Tae Woo;Lee, Jin Wook;Baek, Jong Eun;Lee, Hyun Jong
    • International Journal of Highway Engineering
    • /
    • v.20 no.3
    • /
    • pp.27-37
    • /
    • 2018
  • PURPOSES : The objective of this study is to develop a pavement rehabilitation decision tree considering current pavement condition by evaluating severity and distress types such as roughness, cracking and rutting. METHODS : To improve the proposed overall rehabilitation decision tree, current decision tree from Korea and decision trees from other countries were summarized and investigated. The problem when applying the current rehabilitation method obtained from the decision tree applied in Seoul was further analyzed. It was found that the current decision trees do not consider different distress characteristics such as crack type, road types and functions. Because of this, different distress values for IRI, crack rate and plastic deformation was added to the proposed decision tree to properly recommend appropriate pavement rehabilitation. Utilizing the 2017 Seoul pavement management system data and considering all factors as discussed, the proposed overall decision tree was revised and improved. RESULTS :In this study, the type of crack was included to the decision tree. Meanwhile current design thickness and special asphalt mixture were studied and improved to be applied on different pavement condition. In addition, the improved decision tree was incorporated with the Seoul asphalt overlay design program. In the case of Seoul's rehabilitation budget, rehabilitation budget can be optimized if a 25mm milling and overlay thickness is used. CONCLUSIONS:A practical and theoretical evaluation tool in pavement rehabilitation design was presented and proposed for Seoul City.

Development of Rehabilitation Criteria of National Highway Pavement (국도 아스팔트 콘크리트 포장의 보수공법 결정 기준 연구)

  • Kim, Da-Hae;Kwon, Soo-Ahn;Suh, Young-Chan;Lim, Kwang-Soo
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.37-44
    • /
    • 2009
  • Currently the reasonability of threshold values for rutting and cracking does not clearly defined at the Pavement Rehabilitation Decision Tree on national highway PMS(Pavement Management System). The goal of this study is to provide the reasonable threshold values for the national highway asphalt concrete pavement rehabilitation. To achieve this goal, test section that represents typical asphalt concrete pavement of national highway was selected and pavement export were participated. Pavement condition survey has been conducted and pavement performance data at the selected roadway section were analyzed. From this study, reasonable threshold values of Pavement Rehabilitation Decision Tree were suggested based on the pavement expert's engineering judgement. In terms of crack repairs, the application of overlay after cutting is required to deteriorated area where existing crack ratio is over 35% and just overlay is required to where crack ratio is over 20%. On rutting, rut depth over 13mm is required to overlay after cutting and rut depth over 10mm is just needed to overlay.

  • PDF

Comparison of the Pavement Performance for Concrete Overlay and Asphalt Overlay on Aged Cement Concrete Pavement (노후화된 시멘트 콘크리트 포장에 대한 콘크리트 및 아스팔트 덧씌우기의 포장성능 비교)

  • Lee, Seung-Woo;Son, Hyeon-Jang
    • International Journal of Highway Engineering
    • /
    • v.13 no.2
    • /
    • pp.31-39
    • /
    • 2011
  • More than sixty percentage of highway in South Korea were constructed by concrete pavements and more than half of the concrete pavements were twenty years or older. Maintenance and rehabilitation of aged cement concrete pavements required early transportation opening due to difficulty of preparing bypass roads, given South Korea's transportation condition and so far, mostly asphalt concrete overlay has been used. However, asphalt concrete pavement maintenance and rehabilitation is costly because of early damage and at the same time, it causes inconvenience to the road users. Recently, as an effective method of rehabilitation for aged cement concrete pavement, bonded concrete overlay is being attempted. Therefore, utilizing various data on year-by-year basis is needed to rationally analyze of the damage on asphalt concrete overlay and bonded concrete overlay is necessary. However, in South Korea database of Serviceability damage on asphalt concrete overlay and bonded concrete overlay does not exist. In this research, performance is evaluated by the LTPP (Long Term Pavement Performance) Data of U.S.A, which accumulated various damage data of asphalt concrete overlay and bonded concrete overlay. However, the pattern distress of asphalt concrete overlay and bonded concrete overlay are different. Therefore, the pavement distress data of each section is collected into database and distress are calculated PCI(Pavement Condition Index) in order to compare life of asphalt concrete overlay and bonded concrete overlay.

A Study for Determining the Rehabilitation Method Group using NHPCI on Asphalt Concrete Pavement of National Highway (국도 아스팔트 포장의 NHPCI(National Highway Pavement Condition Index)를 활용한 보수공법그룹 결정에 관한 연구)

  • Son, Hyeon Jang;Kwon, Soo-Ahn;Lee, Jae Jun;Baek, Cheolmin;Lim, Jae Kuy;Sin, Hyun Jin
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.1-9
    • /
    • 2013
  • PURPOSES : The PMS(Pavement Management System) has been utilized in order to efficiently allocate the limited budget for the maintenance of national highway system. In the PMS of national highway, surface pavement condition is evaluated by using the VI (Visual Index). However, the VI is determined only by considering the cracking rate (%) and rut depth (mm), which is not reflecting the IRI (International Roughness Index) that is known as an important factor of pavement performance. In this study, the NHPCI (National Highway Pavement Condition Index) which includes the cracking rate (%), rut depth (mm), and IRI (m/km) is suggested for determining the rehabilitation methods group. METHODS : First, the rehabilitation methods performed between 2008 and 2010 on the national highway is classified and then, NHPCI is determined for each rehabilitation method. Next, the NHPCI for each rehabilitation method is grouped through the interval estimation of the population mean and T-test analysis. RESULTS : According to NHPCI range, the rehabilitation methods are divided into four categories: Not Required, Preventive Maintenance, Overlay Treatment (with or without cutting), and Full-scale Treatment (i.e., reconstruction). CONCLUSIONS : Based on this study, it is recommended that the appropriate NHPCI range should be determined through the combination of the rehabilitation categories and Decision Procedure of Pavement Distress Condition Visual Index.

Comparison of Asphalt Concrete Inlay and Overlay for Rehabilitation of Aged Cement Concrete Pavement through Accelerated Pavement Testing and Life-Cycle Cost Analysis (포장가속시험 및 경제성 분석을 통한 절삭 덧씌우기와 비절삭 덧씌우기의 비교)

  • Suh, Young Chan;Kwon, Hong Jun;Lee, Eung Jun
    • International Journal of Highway Engineering
    • /
    • v.19 no.6
    • /
    • pp.75-81
    • /
    • 2017
  • PURPOSES : So far, aged cement concrete pavement on express highways has been rehabilitated mainly with asphalt concrete inlay. However, potholes were the major problem, and they shortened the life of the inlay mainly owing to the poor drainage of water once it infiltrated the interface of the concrete and asphalt. The purpose of this study is to compare the performance and economic efficiency of asphalt overlay and inlay. METHODS : Overlay and inlay were compared through accelerated pavement testing, and a life-cycle cost analysis was conducted in this study using the CA4PRS program. RESULTS and CONCLUSIONS : It was found from accelerated pavement testing that the overlay exhibited reflective crack resistance that was more than twice as effective as that of inlay. The total cost (construction cost + user cost) within the analysis period (20 years) of the overlay was 37% lower than that of the inlay.

Methodology of a Probabilistic Pavement Performance Prediction Model Based on the Markov Process (확률적 포장 공용성 예측모델 개발 방법론)

  • Yoo, Pyeong-Jun;Lee, Dong-Hyun
    • International Journal of Highway Engineering
    • /
    • v.4 no.4 s.14
    • /
    • pp.1-12
    • /
    • 2002
  • Pavement Management System has a special purpose that the rehabilitation strategy applied on pavement should be executable in view of technical and economical point after new pavement open to the traffic. To achieve that purpose, a reliable pavement performance prediction model should be embeded in the system. The object of this study is to develop a probabilistic pavement performance prediction model for evaluating asphalt pavements based on the Markov chain concept. In this paper, methodology of the Markov chain modeling principle is explained, and the application of this model to asphalt pavement is described. As the results, transition matrics for predicting asphalt pavement performance are obtained, and also performance life is estimated quantitatively by this system.

  • PDF

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

Investigation of Current Practice on Hot In Place Recycling (HIR) in USA: Literature Review (현장가열재생 아스팔트 포장의 현재 미국 내의 적용 현황 연구: 문헌조사)

  • Im, Jeong Hyuk;Cho, Seong-Hwan;Hwang, Sung-Do
    • International Journal of Highway Engineering
    • /
    • v.16 no.2
    • /
    • pp.73-89
    • /
    • 2014
  • PURPOSES : The objective of this study is to investigate the current state of the practice, examining the steps in the process recommended by various agencies and the Asphalt Recycling and Reclaiming Association (ARRA)-namely mix design, structural design, structural capacity evaluation, and material characterization-in order to better understand the implications of hot in-place recycling (HIR). METHODS : In addition, the current practice of state departments of transportation (DOTs) is here reviewed with the purpose of learning from successful past experiences so as to forestall any difficulties that may emerge under similar circumstances. Also, HIR benefits, including reduced costs, improved construction processes, and environmental friendliness are presented, as well as advantages and disadvantages of HIR application. RESULTS : Most of the United States highway system is now deteriorating so that rehabilitation or reconstruction techniques are required for the most distressed roads, taking into account ways to increase the effectiveness of existing budgets. Several options are available in rehabilitating distressed roads, and the choice among these depends on many factors, including pavement distress condition, funding, and design life. Among these techniques, Hot In-Place Recycling (HIR) has emerged as a cost-effective treatment for deteriorated pavements, and has been proven an effective long-term strategy for pavement rehabilitation.