• Title/Summary/Keyword: real options

Search Result 204, Processing Time 0.026 seconds

AN INTEGRATED REAL OPTION-RISK MANAGEMENT FRAMEWORK FOR PPP/PFI PROJECTS

  • Jicai Liu;Charles Y.J. Cheah
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.729-738
    • /
    • 2007
  • The Public Private Partnership/Private Finance Initiative (PPP/PFI) schemes have made the private sector become a major participant involved in the development of infrastructure systems along with the government. Due to more integrated efforts among project participants and longer concession period, PPP/PFI projects are inherently more complex and risky. It is therefore very important to proactively manage the risks involved throughout the project life cycle. Conventional risk management strategies sometimes ignore managerial flexibility in the planning and execution process. This paper starts with a revised risk management framework which incorporates the real option concept. Following the presentation of the framework, a new risk classification is proposed which leads to different ways of structuring options in a project according to the stage of the project life cycle. Finally, the paper closes by discussing other issues concerning option modeling and negotiation.

  • PDF

The Development of the Real Time Target Simulator for the RF Signal of Electronic Warfare using VST and FPGA (VST 및 FPGA를 이용한 전자표적 생성 및 신호 모의장치 개발)

  • Sanghun Song
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.26 no.4
    • /
    • pp.324-334
    • /
    • 2023
  • In this paper, the target simulator for RF signals was developed by using VST(Vector Signal Transceiver) and set by real-time signal processing SW programs. A function to process RF signals using FPGA(Field Programmable Gate Array) board was designed. The system functions capable of data processing, raw signals monitoring, target signals(simulated range, velocity) generating and RF environments data analyzing were implemented. And the characteristics of modulated signal were analyzed in RF environment. All function of programs for processing RF signal have options to store signal data and to manage the data. The validity of the signal simulation was confirmed through verification of simulated signal results.

Dynamic Valuation of the G7-HSR350X Using Real Option Model (실물옵션을 활용한 G7 한국형고속전철의 다이나믹 가치평가)

  • Kim, Sung-Min;Kwon, Yong-Jang
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.137-145
    • /
    • 2007
  • In traditional financial theory, the discount cash flow model(DCF or NPV) operates as the basic framework for most analyses. In doing valuation analysis, the conventional view is that the net present value(NPV) of a project is the measure of the present value of expected net cash flows. Thus, investing in a positive(negative) NPV project will increase(decrease) firm value. Recently, this framework has come under some fire for failing to consider the options of the managerial flexibilities. Real option valuation(ROV) considers the managerial flexibility to make ongoing decisions regarding the implementation of investment projects and the deployment of real assets. The appeal of the framework is natural given the high degree of uncertainty that firms face in their technology investment decisions. This paper suggests an algorithm for estimating volatility of logarithmic cash flow returns of real assets based on the Black-Sholes option pricing model, the binomial option pricing model, and the Monte Carlo simulation. This paper uses those models to obtain point estimates of real option value with the G7- HSR350X(high-speed train).

Economic Assessment for Flood Control Infrastructure under Climate Change : A Case Study of Imjin River Basin (기후변화를 고려한 홍수방재시설물의 경제성분석 : 임진강 유역사례)

  • Kim, Kyeongseok;Oh, Seungik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.81-90
    • /
    • 2017
  • In Imjin River basin, three floods occurred between 1996 and 1999, causing many casualties and economic losses of 900 billion won. In Korea, flood damage is expected to increase in the future due to climate change. This study used the climate scenarios to estimate future flood damage costs and suggested a real options-based economic assessment method. Using proposed method, the flood control infrastructures in Imjin River basin were selected as a case study site to analyze the economic feasibility of the investment. Using RCP (Representative Concentration Pathway) climate scenarios, the future flood damage costs were estimated through simulated rainfall data. This study analyzed the flood reduction benefits through investment in the flood control infrastructures. The volatility of flood damage reduction benefits were estimated assuming that the RCP8.5 and RCP4.5 climate scenarios would be realized in the future. In 2071, the project option value would be determined by applying an extension option to invest in an upgrading that would allow the project to adapt to the flood of the 200-year return period. The results of the option values show that the two investment scenarios are economically feasible and the project under RCP8.5 climate scenario has more flood damage reduction benefits than RCP4.5. This study will help government decision makers to consider the uncertainty of climate change in the economic assessment of flood control infrastructures using real options analysis. We also proposed a method to quantify climate risk factors into economic values by using rainfall data provided by climate scenarios.

A Study On The Economic Value Of Firm's Big Data Technologies Introduction Using Real Option Approach - Based On YUYU Pharmaceuticals Case - (실물옵션 기법을 이용한 기업의 빅데이터 기술 도입의 경제적 가치 분석 - 유유제약 사례를 중심으로 -)

  • Jang, Hyuk Soo;Lee, Bong Gyou
    • Journal of Internet Computing and Services
    • /
    • v.15 no.6
    • /
    • pp.15-26
    • /
    • 2014
  • This study focus on a economic value of the Big Data technologies by real options model using big data technology company's stock price to determine the price of the economic value of incremental assessed value. For estimating stochastic process of company's stock price by big data technology to extract the incremental shares, Generalized Moments Method (GMM) are used. Option value for Black-Scholes partial differential equation was derived, in which finite difference numerical methods to obtain the Big Data technology was introduced to estimate the economic value. As a result, a option value of big data technology investment is 38.5 billion under assumption which investment cost is 50 million won and time value is a about 1 million, respectively. Thus, introduction of big data technology to create a substantial effect on corporate profits, is valuable and there are an effects on the additional time value. Sensitivity analysis of lower underlying asset value appear decreased options value and the lower investment cost showed increased options value. A volatility are not sensitive on the option value due to the big data technological characteristics which are low stock volatility and introduction periods.

Parts supply management system for automobile part′s manufacturing companies

  • Jang, Gil-Sang;Park, Jung-Sang
    • International Journal of Quality Innovation
    • /
    • v.4 no.1
    • /
    • pp.213-219
    • /
    • 2003
  • This paper proposes an efficient and effective BOM management scheme for small and medium manufacturing (SME) companies that produce automobile parts. Automobile part's manufacturers produce very various products due to various automobile characteristics such as types, colors, and options of cars. These products are classified into product groups with common parts and like this product groups with commonality are regarded as product family. This paper proposes a BOM data model for product family structures and implements the practical EXCEL-based BOM management system for real small and medium manufacturing (SU) companies that produces automobile parts.

기술개발 투자안의 최적 포트폴리오 구성에 관한 연구

  • 이현정;이정동;김태유
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2000.11a
    • /
    • pp.259-277
    • /
    • 2000
  • In this paper, we suggest theoretical grounds on the problem of R&D portfolio with different option premiums utilizing the Real Options Model, which has received intensified attention as the method of assessment of R&D project with high risk. Even though there have been many studies focused on the evaluation of option value of single project from technology valuation's perspective. there are few study on the portfolio of multiple technology investment by option value using. This paper bears practical importance by showing simple examples with the option value of investment alternatives and the valuation of related risk, the construction of optimum portfolio in technology investment alternatives.

  • PDF

A Monte-Carlo Least Squares Approach for CO2 Abatement Investment Options Analysis with Linearly Non-Separable Profits of Power Plants (분리불가 이윤함수를 가진 발전사의 온실가스 감축투자 옵션 연구: 몬테카를로 최소자승법)

  • Park, Hojeong
    • Environmental and Resource Economics Review
    • /
    • v.24 no.4
    • /
    • pp.607-627
    • /
    • 2015
  • As observed and experienced in EU ETS, allowance price volatility is one of major concerns in decision making process for $CO_2$ abatement investment. The problem of linearly non-separable profits functions could emerge when one power company holds several power plants with different technology specifications. Under this circumstance, conventional analytical solution for investment option is no longer available, thereby calling for the development of numerical analysis. This paper attempts to develop a Monte-Carlo least squares model to analyze investment options for power companies under emission trading scheme regulations. Stochastic allowance price is considered, and simulation is performed to verify model performance.

Real Option Decision Tree Models for R&D Project Investment (R&D 프로젝트 투자 의사결정을 위한 실물옵션 의사결정나무 모델)

  • Choi, Gyung-Hyun;Cho, Dae-Myeong;Joung, Young-Ki
    • IE interfaces
    • /
    • v.24 no.4
    • /
    • pp.408-419
    • /
    • 2011
  • R&D is a foundation for new business chance and productivity improvement leading to enormous expense and a long-term multi-step process. During the R&D process, decision-makers are confused due to the various future uncertainties that influence economic and technical success of the R&D projects. For these reasons, several decision-making models for R&D project investment have been suggested; they are based on traditional methods such as Discounted Cash Flow (DCF), Decision Tree Analysis (DTA) and Real Option Analysis (ROA) or some fusion forms of the traditional methods. However, almost of the models have constraints in practical use owing to limits on application, procedural complexity and incomplete reflection of the uncertainties. In this study, to make the constraints minimized, we propose a new model named Real Option Decision Tree Model which is a conceptual combination form of ROA and DTA. With this model, it is possible for the decision-makers to simulate the project value applying the uncertainties onto the decision making nodes.