• 제목/요약/키워드: railway maintenance

검색결과 1,064건 처리시간 0.028초

경전철에서 역무자동설비 설계 방안 (A Study of Light Train AFC System Planing)

  • 이정주;이수영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1574-1585
    • /
    • 2007
  • In the more and more continues traffic difficulty which comes to be serious it is for solve, in order to like this used plan for new town light train automatic fare collection system, the city development which is balance and the passenger whom it uses, in consequence of the fact that recently believer instruction, the automatic fare collection system the reverse which is convenient is used in the scripture season which is embossed with means it introduces it operates and a manpower with the scientific service control which leads the electric computer anger of passenger service improvement and accounting and statistical business it reduces, the use is convenient and the possibility facility of operating efficiently in rational plan in order to be, description below for the service automation equipment where the efficiency improves it is. Service automation equipment uses a scripture season to be the first boundary gate of the passenger, there must be a place where it uses a service automation facility and in order to be convenient, it considers the moving area and a wait of the reverse station passenger moving area and the space where, must secure the automatic fare collection system which it follows in automation of facility and the service operation of the reverse station which is ticket sale, the collection of tickets back the passenger is convenient and in order it will be able to use, must do and must consider, must arrange the efficient characteristic of the maintenance civil official services.

  • PDF

현장측정을 통한 노후 레일의 피로수명 평가에 관한 연구 (A Study on Estimation of Fatigue Life of Aged Continuous Welded Rail using the Field Test)

  • 공선용;성덕룡;김준형;박용걸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.352-364
    • /
    • 2007
  • It is essential to reduce track maintenance costs and to extend the periodic replacements of continuous welded rails based on accumulated passing tonnage. As recently train load decrease and rail joints wear down less, the periodic replacements of continuous welded rails can be extended. There are many kinds of rail damage like squat, head-check and corrugation. These can be taken nondestructive or naked eye test. So the periodic replacements of continuous welded rails based on accumulated passing tonnage were examine with focusing on a crack of rail bottom of continuous welded rail. Therefore, this study measure dynamic response of track by metro train load, it compute impact coefficient and track spring coefficient for estimating a condition of actual track system. Also, it is converted the measured stress waveform into stress frequency histogram by the rain-flow counting methods, and then the equivalence of stress is calculated. As apply s-n curve of a new welded rail, accumulated fatigue damage ratio of laid rail and remaining service lives is estimated. This study suggest a plan of the periodic replacements of continuous welded rails based on accumulated passing tonnage classified by the types of track system.

  • PDF

장대레일 재설정 방법 개선 연구 (A study on the refined resetting for the continuous weleded rail)

  • 김우진;정찬묵;민경주
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.386-394
    • /
    • 2007
  • Due to the transportability problems, long rail shall be from base rail unit, which is normally 100m for regular rail and 300m for high speed rail. After these rail units are transported from the fabricator to the site, the field weld would be performed.axial stresses in the long rail is mainly from the temperature differences at various locations the long rail. Also the gaps between each welds cause secondary axial stresses in the rail. In addition to these, re-welds the fractured rails, rail buckling, irregular rail vibration, rail twist also result innonuniform axial stresses in the rail. To obtain the rail buckling stability, the rail stresses shall be released due to the resetting of CWR. Traditionally two resetting of CWR methods have been applied, the one is rail heater and the other is rail tenser. these methods, the latter has been recommended because it has less limitation in the rail length and it is easier to minimized the force differences. But even in this method, the calculation is cumbersome and is not easy to find out the rail stress distribution itself.refined methodsxial stress resetting in the long rail is studied and this study be easily applied in the real construction. From this approach, more rational rail maintenance system can be expected.

  • PDF

용산 국제업무 지구 역세권 개발사업을 위한 기초연구 - 해외사례를 중심으로 - (A Study on Development Project for The Yongsan International Business Station District : Focus on Foreign Example)

  • 이태식;장경수;박은수;구자경
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1877-1882
    • /
    • 2007
  • The Yongsan International Business District development work is a 20 billion$ project to raise facilities for national business, trade, residence, and culture. The project site is $566,800m^2$ and it covers the railroad maintenance center and Dongbuichon-dong. Developing railroad station region used to be done by private investment. However, problems existed; simple function as a massive selling market, traffic jam caused by massive market users, inadequacy to transfer to other transportations, interruption of the pedestrian way and separation of zone of life by the station. To solve this problem it is important to consider developing cases of other countries and devise a plan that is applicable to our circumstances. In the study, we compared our station development case with foreign station development cases and analyze the element for the plan what we should consider in our station development. In addition, The results of the study can be used as a preliminary data in the future planning the Yongsan International Business District development.

  • PDF

서울메트로 PSD 통합관제시스템 구축방안에 대한 연구 (Study on Implementation Scheme for Integrated PSD Control System of Seoul Metro)

  • 김용협;현용섭;류호중;김진수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1551-1559
    • /
    • 2007
  • Seoul Metro has been constructing the screen doors on the platforms to provide safe and comfort environments. The screen doors of each station are configured so that they can be operated in automatic mode in connection with ATC/ATO through the integrated control panel in the station control room and in manual mode through the control panel of the station control room and crew control panel. These systems have been implemented with different data communication protocols between systems, HMI configuration, and so on due to ordering processes, implementation time and diverse suppliers, and manufactured to be operated within single station. Seoul Metro has been planning to implement the integrated control system to secure seamless train operation and safety and to have a fast response system against emergency situations such as PSD failure and fire, by implementing the system that is able to collectively manage, monitor and control the operation status and equipment conditions of PSD on to the integrated control center. This paper has studied a scheme to reduce the budget for the future facility constructions by standardizing the data format for data communication with the integrated station control panel and using the open standard protocols, in order to secure consistency of operation, system expansion and maintenance with unified and standardized control items.

  • PDF

철도차량 제동기의 압력제어에 관한 연구 (A Study on Pressure Control Method of Train Brake System)

  • 이한민;김길동;박성환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1909-1915
    • /
    • 2008
  • The brake systems of the rolling stocks are generally consisted of electrical and mechanical brake systems. Because of its inherent structure of the each brake system, the electrical brake system is mainly used at the high speed range while the mechanical brake system is used at the relatively lower speed range. It is desirable for the rolling stocks to apply the entire electrical brake system. However, since the brake force from electric brake system is not enough to stop the rolling stock within the legal stop distance. Therefore, the mechanical brake system is indispensable to rolling stocks. In general, the vast majority of the world trains are equipped with mechanical braking systems which use compressed air as the force to push block on to wheels or pads on to discs. These mechanical systems are known as air brake or pneumatic brakes. For the air brake system, basically huge scale air compressor is equipped and the long pipe line is complexively connected. Since mass of these air brake components, it is difficult to be a light weight equipment and the long pipe line raise the maintenance problem. In order to overcome these problems of air brake system, the hydraulic brake system is proposed in this research. The hydraulic brake system makes the whole weight of brake equipment be light and large braking force can be applied. Therefore, in this research, the validity and advantages of applying the hydraulic brake system are reviewed.

  • PDF

고속열차(KTX)의 TORNAD 네트워크시스템 데이터 분석방법 연구 (Research on data analysis method of KTX TORNAD network system)

  • 김형인;정성윤;김현식;정도원;김한도
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1032-1038
    • /
    • 2008
  • KTX train system is composed of TORNAD* network for transmitting information of train's internal equipments and OBCS which proceed information within train. OBCS of one trainset consisted of 28 equipments takes intelligent and dynamic composition according to equipment handling, train command and control flow. Each OBCS which is installed within trainset handle and supervise mutually action information about equipments, transmit it to driver to transmit information about train operation and preventive management. This mutual supervision and information transmission use KTX TORNAD* network system. TORNAD* network system is the one which is uniquely developped by GEC ALSTHOM, the KTX trainset manafacturing provider and this field is excluded from technical know-how transfer item. Through the research on analysis method of KTX TORNAD* system data structure which is operating on Seoul-Pusan Line, I hope that this thesis can contribute to train network system's standardization after applying it to improvement of train network system maintenance, enhancing quality of train service and applying it to future Korean rolling stock network system development.

  • PDF

도시철도 본선 토공구간에서의 포장궤도 시험부설 (Test Construction of the Paved Track at Subway Main Line)

  • 이일화;강윤석;공선용;김상진;이순구;정연식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1689-1694
    • /
    • 2008
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, cement mortar pouring type paved track is developed. The paved track is a kind of concrete track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure and materials considering various conditions. Until now, the paved track is verified a various material and structure test. In this paper, it is introduce to the test construction at the urban subway main line. The test construction is completed at Dec. 2007. A major object and substance is a guarantee of construction progress on main line, track performance, construction technique for curved section, transition zone and winter season, recycling the used ballast and application of specific sleeper for sharp curved section.

  • PDF

철도교량 자동화 로봇 개발을 위한 기초 연구 (A Study for Developing of Rail Bridge Inspection Robot)

  • 구자경;황인호;이종세;이태식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.188-193
    • /
    • 2008
  • According to introduce KTX in Korea, rail-road bridge section of KTX was increased approximately 50% of the total length. Bridge is required periodic inspection and check to prevent accident and hazard because various damage which have effects on traffic and replacement of damaged parts is difficult. Specifically, the train as large-scale transportation because accidents led to great damage, preventing these accidents are critical. Well-organized management and maintenance systems are required to prevent the accidents. In the case of roadway bridge, bridge inspection vehicle is used to deploy inspectors in roadway bridge. However, this method requires a lot of time and efforts, and inspectors are exposed to potential hazard. Also, surrounding environment like poor lighting system or electric wire could harm the inspector while repairing. Due to this reason, automatic repairing and inspecting system have been introduced to replace the old methods. Management system of the railroad bridge track for trains uses various advanced equipments, but whereas roadway bridge management system is lacking these efforts. As a result of that, this study looks over the existing management method. and review the method to apply the Bridge Inspection Robot in railroad bridge. Moreover, this study suggests future management technology using inspection robot.

  • PDF

장대 레일의 온도 좌굴 해석 (Thermal Buckling Analysis of Continuous Welded Rail Track)

  • 신정렬;임남형;양재성;강영종
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1998년도 봄 학술발표회 논문집
    • /
    • pp.433-440
    • /
    • 1998
  • For many decades, railroad technology was used to set up tracks with jointed rails and lengths in accordance with rolling and handling technology. The joints lead to drawbacks in the track and in controlling rising maintenance costs. So, railroad engineers became interested in eliminating joints to increase loads, speeds and improvements in rolling, welding, and fastening technology. Continuous welded rail(CWR) track has many advantages over the conventional jointed-rail track. In the case of the elimination of rail joints, it may cause the track to be suddenly and laterally buckled by thermal forces and vehicle load. Thermal forces are caused by an increase in the temperature of railway track. For many years, many analytical and experimental investigations have been conducted to improve the safety of CWR track by various research center in many country. In this paper, CWR track model and CWRB program is developed for buckling analysis using finite element method(FEM). The finite element discretization is used for a rail element with a total of 14 degrees of freedom. The stiffness of the fasteners, tie, and ballast bed is included by a set of spring elements. The investigation on the buckling modes and temperature of CWR track is presented in this paper

  • PDF