Estimation of RPS Method Using 3-Dimensional Numerical Analysis (3차원 수치해석을 이용한 RPS 공법의 적용성 평가)

  • Roh, Jeong-Min;Shin, Eun-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.174-179
    • /
    • 2006
  • Recently, the crossing tunnel has been constructed frequently to connect the separated area by highway and railroad. The construction of crossing tunnel must be progressed while maintaining the existing traffic of the highway as well as railroad. There are many cross funnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(Roof Panel Shield) method in crossing tunnel construction with comparing other existing cross funnelling methods are needed a little volume of concrete and easy to change the direction of cutting shoe during the construction of pipe roof, The 3-dimensional numerical analysis of RPS to consider the arching effect was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

A Study on Rail Transport Method by the Construction Plan of Samcheok Electric Power Complex (삼척발전단지 건설계획에 따른 철도수송력 강화 방안 연구)

  • Cho, Chi-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1327-1334
    • /
    • 2009
  • According to the construction plan of Samcheok electric power complex from year 2009 to year 2020, many people are interested in this area. This national project which invests about 8.6 trillion won will have great influence to rail transport considering current depression days. Samcheok electric power complex will be the largest plan in Korea, and it is necessary to have railroad construction plan as soon as possible considering the route change of domestic coal transport and the possibility of coal transport by rail from North Korea, Russia and China after reunification of Korean peninsula. Also, Samcheok electric power complex will be located in the east area railroad route and it is important to study about this area. This study will mention about the railroad route of east sea north line and Pohang $\sim$ Samcheok line, and review the prospect and strengthening method of coal transport by railroad according to the construction of Samcheok electric power complex.

  • PDF

Primitive Forms of General Contractor Business in the Railroad Construction during the Daehan Empire (철도공사를 통해 본 대한제국기 청부업의 초기적 형태)

  • Lee, Soo-Neon;Jeon, Bong-Hee
    • Journal of architectural history
    • /
    • v.29 no.5
    • /
    • pp.17-28
    • /
    • 2020
  • The general contractor business in South Korea settled in the railway construction during the Daehan Empire, but depending on the construction intention and circumstances of the railroad, relationship among employer-contractor-subcontractor and their roles under the system of the construction process had changed. At the time of laying the Gyeongin and Gyeongbu-rail, the Empire, which had no capital and technology, passed all the power and responsibility of the rail laying to the contractor, who was involved in most of the process. After this, the empire tried to lay Gyeongui-railroad without the help of other countries. Japan prepared for the Russo-Japanese War and decided to construct the railway rapidly, and completed the railway in parallel with direct management work and contract work. From that time on, the general contractor would only do the work. During the construction of railroad in Daehan empire, the general contract business system was established. The ambiguous process was sorted out and divided. At this time, subjects in charge of design and construction has been divided. The internal organization of the project owner and the contractor were organaized and specialized.

A study on the train passage control at railroad bridge under heavy rainfall (철도교량 홍수시 열차운전규제기준에 대한 연구)

  • Park, Young-Kon;Lee, Jin-Wook;Yoon, Hee-Taek;Mok, Jai-Kyun;Kim, Seon-Jong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1001-1006
    • /
    • 2004
  • Railroad disasters are frequently occurred by man-made causes or natural causes. In general, man-made causes are illegal construction practices, deterioration with the lapse of time and railroad crossing accidents, and natural causes are rainfall. snow, wind, earthquake, etc. Of cause, railroad disasters by man-made causes are prevented from keeping the safety principle, constructing multi-level crossing, securing enough men of ability and financial resources and making a thorough check using equipments with high capacity. And railroad disasters by natural causes are also minimized by construction of disaster prevention facilities, introduction and operation of general disaster prevention system and reasonable train passage control. Therefore, to setup the criterion of train passage control for train safety at railroad bridge under heavy rainfall, risky factors, national and oversea criteria under such circumstances are reviewed and a scheme to setup the criterion is suggested.

  • PDF

Railroad Information Integrated-Service and Its Knowledge-Base Construction Method based on Passengers Needs Analysis (철도이용객 니즈 분석을 통한 철도정보 통합서비스 및 지식베이스 구축 방안)

  • Shon, Woo-Yong;An, Tae-Ki;Ahn, Chi-Hyung;Lee, Won-Goo;Kim, Sam-Taek
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.16 no.2
    • /
    • pp.9-18
    • /
    • 2016
  • The railroad is one of the most popular means of transport. Howerver, railroad agencies are managing the railroad information and provide its service respectively. That is, because of managing the different information and its type, The user will not receive the correct and integrated information. In this study, We figure out the needs of passengers that they want in railroad service and seek an integrated service plan that railroad passengers can use the railroad information service at a time, at a glance and in one place. Also, we investigate the knowledge-base construction to provide a knowledge map service to railroad passengers.

Comparison of Relative Weights of Cost for Road-bed Construction and Energy on Life Cycle Cost of Railroad -in Case of Seoul-pusan High Speed Rail (철도노선의 생애주기비용에서 노반건설비와 에너지비용의 상대적 비중 분석 - 경부고속철도 사례를 중심으로)

  • Suh, Sunduck;Kim, Jeong Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.4
    • /
    • pp.1261-1267
    • /
    • 2014
  • It is generally recognize that the weight of energy cost for railroad alignment in the life cycle cost is higher than that for roadway. This study analyzed the relative weights of railroad road-bed construction cost and energy cost in the case of Seoul-Pusan High Speed Rail. Recently, the optimization of railroad alignment with computerized methodology has been studies. The optimization is supposed to aim the minimization of life cycle cost including the energy cost as well as the minimization of the construction cost. The operation period of the Seoul-Pusan High Speed Rail is limited to ten years, then various future operation scenario were developed for the next 20 years. The weight of energy cost is estimated 10~30% of the construction cost by scenario, and it is lower than the figure generally expected. It may be meaningful to provide the method to include the energy cost in the railroad alignment optimization.

An Establishment of Guideline and Evaluation Items for Before-and-After Study in Railroad Construction Projects (철도건설공사 사후평가 항목 및 지침 수립방안)

  • Kim, Yeon Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2D
    • /
    • pp.315-322
    • /
    • 2011
  • The Korea government set a Act called as Before and After Study for a huge SOC projects in order to check their feasibility again at the time of design, construction and completion period. However, the evaluation items and analysis method are so vague that its effectiveness has been challenged. Especially railroad projects need to be evaluated differently by railroad construction types and rolling stocks. This paper suggests the evaluation items as a common items and exclusive items on the type of construction and rolling stocks. Also data collection in the standardized form and GIS techniques and are introduced to analyze evaluation items effectively.

The study about applying concentric circle to curved line in railroad (복선철도에서 구축과 내$\cdot$외측 궤도의 동심원 선형구성의 필요성 연구)

  • Shin, Tae-Gyun;Chung, Chan-Mun;Kim, Seoung-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.157-162
    • /
    • 2003
  • The curved line in construction of railroad is inevitable. Also it needs a transition curve when the straight line connects to curved line. In this research, by establishing the reciprocal relations of inner, center and outer track, we will present the calculation method of construction-center line in normal double-track railroad which uses cubic parabolic type as a transition curve.

  • PDF

Appliance of Slab tracks on the Prestressed Concrete Bridges (슬래브궤도의 콘크리트교량 적용성 검토)

  • Kim, Nam-Hoon;Lim, Young-Su;Shin, Yong-Joon
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1037-1043
    • /
    • 2007
  • The railroad systems with the ballast tracks have been widely used for a long time. But recently, the use of the slab track is being increased gradually with a technical developments. So, this paper deals with the appliance of the slab tracks on the railroad bridges. Firstly, review the design criteria of the railroad bridges related to the slab tracks for the stability and serviceability, based on DIN and EURO code. Then, perform the analysis of the railroad prestressed concrete bridges, and check whether the results of the analysis satisfy the design criteria. Finally, find the construction condition of bridges that all the design criteria are satisfied. As a result, to maintain the stability and serviceability of the bridges, bridges must have some restrictions, including a time of installation of the slab tracks. So, the construction schedule for the erection of the bridges will be carefully considered in case of the concrete railroad bridges with the slab tracks.

  • PDF

Joint Element Structure Method on the Subway Box Structure unere Railroad (철도하부 가도교 설치에 대한 JES공법)

  • Pi, Tae-Hee;Cho, Kook-Hwan;SaGong, Myung
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.973-981
    • /
    • 2008
  • This document presents the JES(Joint Element Structure) method that has been adopted for the firs time in our country for the construction of the structure crossing under the railroad without open excavation. Front Jacking Method, Tubular Roof Construction Method, New Tubular Roof Method and Joint Element Structure Method are commonly used for the construction of structures crossing under the railroad. JES Method, frequently used in Japan recently, is a new method to construct the structures crossing under the railroad in a safe manner and in a relatively short period of time by utilizing the steel elements with the joints through which the load in the vertical angle to the axial direction is transferred to the next element. The elements are tied to each other through the joints to form the permanent walls of a Rahmen structure under the road without open excavation and without limitation to the length in a convenient way. Through the case study in the project of a Subway Box Culvert Improvement for the Gyeonguiseon Railroad in front of Yonsei University using the JES Method, the cost and period of construction in various types of soil is investigated compared to the Front Jacking Method. Furthermore, by analyzing the results of instrumentation measurements carried out throughout the construction, comparison between the actual displacement in the ground and the predicted displacement in the design is made to provide the considerations to be counted for the design. In conclusion, comparison in the field of economic feasibility, constructability and safety between the JES Method and Front Jacking Method, which is most frequently adopted in our country at present, is made to present the JES Method as a new alternative for the non-open excavation construction method for the structures crossing under the railway.