• Title/Summary/Keyword: pump-down time

Search Result 35, Processing Time 0.023 seconds

Warm Start Up Time Reduction Through the Increase of Boiler Water Circulating Pump Inlet Water Temperature Rate of the Thermal Power Plant (관수온도 상승률 증가에 의한 발전용 보일러의 온간기동시간 단축에 관한 연구)

  • Kang, Hee-Seong;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.10 no.1
    • /
    • pp.47-53
    • /
    • 2014
  • The national capacity of electricity of Korea was 81,737 MW and the peak demand was renewed by the record of 71,230 MW in 2012 which has been increasing since the first lighting ceremony had taken place in the Royal Palace(Kyung-Bok Goong) in 1887. Aa the counteract on the rapid increasing of the demand, Korean government is constructing and operating the high capacity nuclear and thermal power plants, however, the operating reserve on weekdays is small while those of weekends are more than 40% of capacity, so they are providing the pumped-storage power plants with the surplus electricity during weekends and operating the power plants which cost higher production price and located in the capital area with WSS (Weekly Start and Stop) mode including the Seoul Thermal Power Plant. Since the Seoul Thermal Power Plant is spending huge amount of expenses for more than 30 times of the WSS annually due to the high production cost even though it is in Seoul, the core of the demand, I chose the power plant unit #5 which was on the grid in 1969 for the case to confirm reducing 23% of the warm start-up time by applying the "Start-up time management program", and that reducing 35% of the water temperature increasing time by accelerate the increasing rate of the inlet temperature of the water circulating pump.

  • PDF

Phenomena Identification and Ranking Table for the APR-1400 Main Steam Line Break

  • Song, J.H.;Chung, B.D.;Jeong, J.J.;Baek, W.P.;Lee, S.Y.;Choi, C.J.;Lee, C.S.;Lee, S.J.;Um, K.S.;Kim, H.G.;Bang, Y.S.
    • Nuclear Engineering and Technology
    • /
    • v.36 no.5
    • /
    • pp.388-402
    • /
    • 2004
  • A phenomena identification and ranking table(PIRT) was developed for a main steam line break (MSLB) event for the Advanced Power Reactor-1400 (APR-1400). The selectee event was a double-ended steam line break at full power, with the reactor coolant pump running. The developmental panel selected the fuel performance as the primary safety criterion during the ranking process. The plant design data, the results of the APR-1400 safety analysis, and the results of an additional best-estimate analysis by the MARS computer code were used in the development of the PIRT. The period of the transient was composed of three phases: pre-trip, rapid cool-down, and safety injection. Based on the relative importance to the primary evaluation criterion, the ranking of each system, component, and phenomenon/process was performed for each time phase. Finally, the knowledge-level for each important process for certain components was ranked in terms of existing knowledge. The PIRT can be used as a guide for planning cost-effective experimental programs and for code development efforts, especially for the quantification of those processes and/or phenomena that are highly important, but not well understood.

Modeling and simulation of RAON cryogenic system using EcosimPro

  • Byeongchang, Byeon;Bokuem, Kim;Denis, Groshev;Sangkwon, Jeong;Taekyung, Ki;Lingxue, Jin
    • Progress in Superconductivity and Cryogenics
    • /
    • v.24 no.4
    • /
    • pp.59-64
    • /
    • 2022
  • The cryogenic system of RAON which is Korea's first heavy ion accelerator was numerically modeled and simulated. EcosimPro which is widely used off-the-shelf numerical software for a large scale cryogenic system was used for the simulation. The model of SRF TF cryogenic system, which is the testbed of cryomodule, was firstly established. The integrity of system of SRF TF was confirmed by comparison of simulation and experimental results. The cool-down strategy to minimize the thermal stress of the cavity was simulated and an optimal strategy was established. In addition, the influence of valve and pump control parameters on the cooling time was investigated, and optimal control parameters were also derived. The cryogenic system of SCL3 that is a low-energy acceleration section including 55 cryomodules, valve boxes, and helium supply lines was also modeled. The soundness of the thermal shield system and interlock system of SCL3 was investigated.

A Dual Charge Pump PLL-based Clock Generator with Power Down Schemes for Low Power Systems (저 전력 시스템을 위한 파워다운 구조를 가지는 이중 전하 펌프 PLL 기반 클록 발생기)

  • Ha, Jong-Chan;Hwang, Tae-Jin;Wee, Jae-Kyung
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.42 no.11
    • /
    • pp.9-16
    • /
    • 2005
  • This paper proposes a programmable PLL (phase locked loop) based clock generator supporting a wide-range-frequency input and output for high performance and low power SoC with multiple clock frequencies domains. The propose system reduces the locking time and obtains a wide range operation frequency by using a dual-charge pumps scheme. For low power operation of a chip, the locking processing circuits of the proposed PLL doesn't be working in the standby mode but the locking data are retained by the DAC. Also, a tracking ADC is designed for the fast relocking operation after stand-by mode exit. The programmable output frequency selection's circuit are designed for supporting a optimized DFS operation according to job tasks. The proposed PLL-based clock system has a relock time range of $0.85{\mu}sec{\sim}1.3{\mu}sec$($24\~26$cycle) with 2.3V power supply, which is fabricated on $0.35{\mu}m$ CMOS Process. At power-down mode, PLL power saves more than $95\%$ of locking mode. Also, the PLL using programmable divider has a wide locking range ($81MHz\~556MHz$) for various clock domains on a multiple IPs system.

The estimating method of construction workable-quantity per unit time - Focused on Pump-Dredge - (건설기계 시간당작업량(Q) 산정 개선방안 -펌프준설선 작업효율(E)을 중심으로-)

  • Ahn, Bang-Ryul;Tae, Yong-Ho;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.125-133
    • /
    • 2010
  • Although work-efficiency of construction machinery is a critical factor for estimating its workable-quantity perunit time, the efficiency figure table presented in the Poom-Sam that is used for Construction Cost Estimation of public sectors in Korea is very subjective for practical usage. In order to suggest objective work-efficiency table for a Pump-Dredger, domestic and overseas documentary records were investigated and on-going construction sites were also visited. Moreover, actual work quantities collected from the site visits were compared with the ones calculated based on the Standard Measurement Methods used in Japan. The research found that the table can be revised by means of detailing down by several factors, namely project type, depth of soil, undersea-site shape, and condition on the sea for better estimation of its workable-quantity. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.

Carbon tip growth by electron beam deposition (전자빔 조사에 의한 탄소상 탐침의 성장)

  • 김성현;최영진
    • Journal of the Korean Vacuum Society
    • /
    • v.12 no.2
    • /
    • pp.144-149
    • /
    • 2003
  • Carbon tips were grown on Si cantilevers by applying an electron beam to them directly with Scanning Electron Microscope. A carbon tip was fabricated by aligning the electron beam directly down the vertical axis of Si cantilever and then irradiating a single spot on the cantilever for a proper time in the dominant atmosphere of residual gases generated by the oil of the diffusion pump. A number of control parameters for SEM, including exposure time, acceleration voltage, emission current, and beam probe current, were allowed to make various aspect ratio feature. The growth of carbon tips was not affected by the surface morphology of substrates. We could acquired the tip whose effective length is 0.5 $\mu\textrm{m}$, bottom diameter is 90 nm and cone half angle $3.5^{\circ}$ The growth technique of the high aspect ratio carbon tips on the tip-free cantilevers is available to reduce the complexities of fabricating sub-micron scale tips on the PZT thin film actuator integrated AFM cantilevers.

Operatonal characteristics of the PLS linac vacuum system (PLS 선형가속기 진공계의 운전특성)

  • 김임경;박용정;김경렬;남궁원
    • Journal of the Korean Vacuum Society
    • /
    • v.5 no.4
    • /
    • pp.269-277
    • /
    • 1996
  • The vacuum systems of PLS linac provides average pressure of $2.6\times 10^{-6}$Pa under high power microwave of 54 MW peak with 4.1 $\mu \textrm s$ pulse width and 10 Hz repetition rates. The base pressure of system is$2.4\times 10^{-6}$Pa with 45$^{\circ}C$ cooling water. The outgassing rate of the system is decreased from $3.0\times 10^{-11}Torr-l/sec-\textrm{cm}^2$ at the initial stage after installation to $1\times 10^{-12}Torr-l/sec-\textrm{cm}^2$ at present. Total accumulated microwave energy dose is about 140 GJ per module. All ion pumps are working under saturated regime and effective pumping speeds of 60 I/s, 230 I/s ion pumps are 45 I/s, 65 I/s, 140 I/s under the operating range. Main problems occurred in recent year are troubles of ion pump controller and vacuum gauge controller, vacuum leak of energy doubler window and electron gun ceramic, and water leak in the dummy load of acceleraing columns. Total of 41 troubles with 140. 8 hours down time give good system availability of 98%. Down time can be reduced by high power waveguide valves and water dummy loads under development, and then availability is expected to be increased up to 99.5%.

  • PDF

Short-term Mechanical Circulatory Support with a Centrifugal Pump - Results of Peripheral Extracorporeal Membrane Oxygenator According to Clinical Situation

  • Lee, Woo-Surng;Chee, Hyun-Keun;Song, Meong-Gun;Kim, Yo-Han;Shin, Je-Kyoun;Kim, Jun-Seok;Lee, Song-Am;Hwang, Jae-Joon
    • Journal of Chest Surgery
    • /
    • v.44 no.1
    • /
    • pp.9-17
    • /
    • 2011
  • Background: A peripheral extracorporeal membrane oxygenator (p-ECMO) has been developed to support patients who are dying due to a serious cardiopulmonary condition. This analysis was planned to define the clinical situation in which the patient benefits most from a p-ECMO. Material and Methods: Between June 2007 and Aug 2009, a total of 41 adult patients used the p-ECMO. There were 23 males and 18 females (mean age $54.4{\pm}15.1$ years). All patients had very unstable vital signs with hypoxia and complex cardiac problems. We divided the patients into 4 groups. In the first group, a p-ECMO was used as a bridge to cardiac operation. In the second group, patients did not have the opportunity to undergo any cardiac procedures; nevertheless, they were treated with a p-ECMO. In the third group, patients mostly had difficulty in weaning from CPB (cardiopulmonary bypass) after cardiac operation. The fourth group suffered from many complications, such as pneumonia, bleeding, infections, and LV dysfunction with underlying cardiac problems. All cannulations were performed by the Seldinger technique or cutting down the femoral vessel. A long venous cannula of $DLP^{(R)}$ (Medtronic Inc, Minneapolis, MN) or $RMI^{(R)}$ (Edwards Lifesciences LLC, Irvine, CA) was used together with a 17~21 Fr arterial cannula and a 21 Fr venous cannula. As a bypass pump, a Capiox emergency bypass system ($EBS^{(R)}$; Terumo, Tokyo, Japan) was used. We attempted to maintain a flow rate of $2.4{\sim}3.0\;L/min/m^2$ and an activated clotting time (ACT) of around 180 seconds. Results: Nine patients survived by the use of the p-ECMO. Ten patients were weaned from a p-ECMO but they did not survive, and the remainder had no chance to be weaned from the p-ECMO. The best clinical situation to apply the p-ECMO was to use it as a bridge to cardiac operation and for weaning from CPB after cardiac operation. Conclusion: Various clinical results were derived by p-ECMO according to the clinical situation. For the best results, early adoption of the p-ECMO for anatomical correction appears important.

Experimental Study on Millimeter Scale Two Phase Catalytic Reactor (밀리미터 스케일의 이상 분해 반응기에 대한 실험적 연구)

  • Cho, Chung-Hun;Lee, Dae-Hoon;Kwon, Se-JIn
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.28 no.3
    • /
    • pp.265-270
    • /
    • 2004
  • Experiment study on a down scaled two-phase catalytic reactor is presented. As a preliminary step for the development of catalytic reactor, nano-particulate catalyst was prepared. Perovskite La$\_$0.8/Sr$\_$0.2/CoO$_3$is chosen and synthesized as a catalyst considering superior catalytic performance in reduction and oxidation process where oxygen is involved among the reagent. Reactor that has a scale of 2${\times}$10${\times}$25mm was made by machining of A1 block as a layered structure considering further extension to micro-machining. Hydrogen peroxide of 70wt% was adopted as reactant and was provided to the reactor loaded with 1.5 g of catalyst. Reactant flow rate was varied by precision pump with a range of 0.15cc/min to 17.2cc/min. Temperature distribution within reactor was recorded by 3 thermocouples and total amount of liquid product was measured. Temperature distribution and factors that affect temperature were observed and relation between temperature distribution and production rate was also analyzed. Relative time scale plays a significant role in the performance of the reactor. To obtain steady state operation, appropriate ratio of flow rate, catalyst mass and reactor geometry is required and furthermore to get more efficient production rate temperature distribution should be evenly distributed. The database obtained by the experiment will be used as a design parameter for micro reactor.

A Fast-Locking Fractional-N PLL with Multiple Charge Pumps and Capacitance Scaling Scheme (Capacitance Scaling 구조와 여러 개의 전하 펌프를 이용한 고속의 ${\Sigma}{\Delta}$ Fractional-N PLL)

  • Kwon, Tae-Ha
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.43 no.10 s.352
    • /
    • pp.90-96
    • /
    • 2006
  • A novel ${\Sigma}{\Delta}$ fractional-N PLL architecture for fast locking and fractional spur suppressing is proposed based on the capacitance scaling scheme. It changes the effective capacitance of loop filter (LF) by increasing and decreasing current to the capacitor via different paths with multiple charge pumps. The effective capacitance of loop filter (LF) can be scaled up/down depending on operating status while keeping LF capacitors small enough to be integrated into a single PLL chip. Fractional spurs suppressing have been achieved by reducing the magnitude of charge pump current when the PLL is in-lock without degrading fast locking characteristic. It has been simulated by HSPICE in a CMOS $0.35{\mu}m$ process, and shows flat locking time is less than $8{\mu}s$ with the small size of LF capacitors, 200pF and 17pF, and $2.8k{\Omega}$ resistor.