• Title/Summary/Keyword: public waters reclamation

Search Result 7, Processing Time 0.018 seconds

A Study on Rational Alternative Comparison of Prior Review on Environmental Conditions for Basic Plan of Public Waters Reclamation (공유수면매립 기본계획 사전환경성검토의 합리적인 대안비교에 관한 연구)

  • Maeng, Jun-Ho;Cho, Kwang-Woo;Byon, Seong-Soo
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.6
    • /
    • pp.563-571
    • /
    • 2010
  • In carrying out the prior review on environmental conditions for basic plan of public waters reclamation, the important item is review on conditions of location on prearranged reclaimed land. In this study, environmental assessment which needs careful consideration in the first stage of selecting location is presented by analyzing environmental impact assessment on public waters reclamation projects for about 10 years. The assessment index for alternative comparison is divided into two parts according to importance level. What is most important in alternative comparison is the comparison on direct influence due to reclamation. In other words, it figures out damaged extent of natural shoreline as well as intertidal and infralittoral zones. Comparing influence extent due to reclamation through the 1st comparison on this is regarded as to be important. In case there is no significant difference by alternatives through the 1st assessment, the 2nd assessment should be carried out. In the 2nd assessment indexes are damaged quantity of benthic organism, change in seawater current, erosion, accumulation and exchangeable rate of seawater. The plan for selecting optimal location which minimizes environmental influence in establishing public waters reclamation plan is demonstrated through model cases. For this, 3 districts which have similar environment and scale are selected, and then comparison on location alternative is made through environmental assessment index. In addition, the comparison on 3 arrangement alternatives are conducted, targeting certain areas. It is thought that carrying out comparison review on respective areas in the same cities and counties, not merely comparing arrangement plan by selecting 1 targeting area in advance, is the most appropriate. Besides, selection of arrangement plan considering environment, which minimizes damage of natural shoreline and influence due to change of seawater current is required in alternative comparison on arrangement plan as well. In case of the prior review on environmental conditions though alternative comparison method presented in this study is carried out, it is safely said that the influence on ocean environment due to public waters reclamation can be minimized.

Estimation for Reclamation of Public Waters Demand Using Time-series Analysis (시계열 분석을 통한 공유수면 매립 수요 예측)

  • Shin, Chul-Oh;Choi, Eun Chul;Yoon, Sung-Soon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.7
    • /
    • pp.918-923
    • /
    • 2021
  • The Korean government is developing a 10-year master plan pertaining to the Public Waters Management and Reclamation Act. However, it was observed that implementation of the reclamation project through frequent changes would occupy a significant proportion. Thus, questions are being raised about the effectiveness of the master plan. In view of this, the need for a trend analysis on long-term reclamation demand is growing. Accordingly, in this study, a trend analysis of reclamation demand was carried out using the annual reclamation performance data. The results of the analysis indicate that the demand for reclamation of public waters continued to decline, and the trend has been particularly evident since the 1990s, when it was converted into a reclamation master plan. In addition, the total demand for reclamation during 2021-2030 was calculated to be at a maximum of 13.8 km2 and minimum of 1.7 km2.

Analysis of the Long-term Settlement Behavior Due to the Additional Embankment on the Waste Lime Landfill in Public Waters Reclaimed Land (공유수면 매립지내 폐석회 매립시설의 추가성토에 따른 장기침하 거동 분석)

  • Kang, Jeong Ku;Yi, Yeun Jeung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.2
    • /
    • pp.1-9
    • /
    • 2022
  • Recently, the reclamation of public waters has been on a downward trend due to environmental problems, but there is a limitation to evaluating environmental characteristics index uniformly. In this study, the stability of settlement behavior on public waters reclaimed land was analyzed using the experimental test. From the primary consolidation influence factors, the characteristics of the waste lime was similar that of clay in process of consolidation. Assuming that the waste lime landfill is the layer reinforced with thin geosynthetic reinforcement, the settlement was predicted by calculating the amount of increase using the Westergaard method. As a result of predicting settlement with degree of consolidation, it was found that the increase in stress was reduced by 40% when the surface layer of the soft ground was reinforce with geotextiles compared to the case where it was not reinforced. In addition, the consolidation behavior characteristics of clay and waste lime were compared using the correlation between the plasticity index and internal friction angle of waste lime. Since the waste lime in the public process of consolidation, it was predicted that long-term settlement will increase further.

Estimation of Historical Shorelines on a Coastal Reclaimed Land (I): The Use of Aerial Photographs (해안 매립지에서 과거 해안선의 산정 (I): 항공사진의 이용)

  • Kim, Baeck-Oon;Lee, Chang-Kyung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.21 no.5
    • /
    • pp.371-379
    • /
    • 2009
  • In this paper, we discussed methods and problems for estimating historical shorelines on a reclaimed land. Since many of coastal lands are unregistered in Korea, reclamation of public waters could cause complicated land ownership dispute. Unlike cadastral boundaries, historical shorelines can be represented by those of various locations due to lack of legal definition of shoreline as well as characteristics of shoreline changes, which directly influence on the calculation of coastal and submerged land areas. Through a case study for Anjeong industrial complex, a systematic method of investigating historical shorelines was suggested to resolve the problems. For a rocky coast where shoreline changes are not likely to occur, a shoreline based on tidal datum was retrieved using aerial photographs taken before the construction of reclamation. Compared with ground survey data, the shoreline was accurate, indicating that the digital photogrammetry was reliable.

Improvement of The Scope of Business Subject to Consultation on Utilization of Sea Areas for Developments According to the Fishing Village and Fishery Harbors Act (어촌·어항법에 따른 개발사업의 해역이용협의 대상사업의 범위 설정 개선방안)

  • Tac, Dae-Ho;Lee, Dae-In;Kim, Gui-Young
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.19 no.3
    • /
    • pp.211-217
    • /
    • 2016
  • In case of the Sea Areas Utilization Consultation about fishery harbor facilities there has been problems excepting a mooring facility and having the same scope of business subject with harbor, while those scale are different. In this study, we analyzed the 17 cases of the statements for Sea Areas Utilization Consultation according to the development projects of fishery harbors for 2013-2014 and suggested the improvement way to go. First, it is needed to reassess the scope of business subject about fishery harbor because the environmental effects about the development projects for the fishery harbor are not considered separately by facilities, development project for the fishery harbor. Therefore, the reassessment about them are needed surely. Second, the adjustment of the range about fishery harbor facilities on the Sea Area Utilization Consultation is needed because in case of most small fishery ports, the sizes of those facilities are less than the boundary area ($50,000m^2$). Last, consultation subjects shall be more clear in order to protect confusions-related with applying for the Consultation on Utilization of Sea Areas. A new rule for clarifying consultation on business subjects is needed in order to reduce the unclarity and the confusions from being occurred by difference between 'occupancy or use permit of public waters' and 'exclusion of application' and business subjects according to the Public Waters Management and Reclamation Act and the Marine Environment Management Act, respectively.

Qualitative Analysis of Coast Topographic Using RTK-GPS (RTK-GPS 측량을 이용한 해안지형의 정성적 분석)

  • Kim, Yong-Suk;Lee, Jae-One
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.15 no.2 s.40
    • /
    • pp.77-85
    • /
    • 2007
  • According to the survey data during the Japanese Occupation Period, the length of South Korea's coastline is about 11,542 km, including the coastlines of land and islands. It will be very expensive and time-consuming to revise/renew accurately this coastline data through site survey, it will cost great money and time. Also, various development projects such as reclamation works on public waters, constructions of ports/harbors, etc. are frequently changing the coastal areas and coastlines, causing many renewal projects on coastal maps. For such reason, appropriate alternatives for site survey are necessary. This paper demonstrate the utilization of RTK-GPS survey data, qualitative analysis and 3D topographic analysis for extracting the change in five coastal areas (Songjeong, Haeundae, Kwanganri, Songdo and Dadaepo). The local experimental areas subjected for this research were limited to five coastal areas near Busan.

  • PDF

Coastline Change Analysis Using RTK-GPS and Aerial Photo (RTK-GPS와 항공사진을 이용한 해안선 변화량 분석)

  • Lee, Jae-One;Kim, Yong-Suk
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.25 no.3
    • /
    • pp.191-198
    • /
    • 2007
  • According to the survey data during the Japanese Occupation Period, the length of South Korea's coastline is about 11,542km, including the coastlines of mainland and islands. To accurately revise/renew this coastline data through site survey, it will cost great money and time. Also, various development projects such as reclamation works on public waters, constructions of ports/harbors, etc. This paper used aerial photographs, satellite image data and GPS survey data with certain intervals to monitor the change in coastal areas of Songieong, Haeundae, Kwanganri, Songdo and Dadaepo. The local area subjected for this research was limited to areas near Busan. The specific contents of this research include. Launching qualitative/time series analyses on the change of coastal areas using aerial photographs, satellite image data and RTK-GPS surveys.