Proceedings of the Korean Institute of Building Construction Conference
/
2021.05a
/
pp.277-278
/
2021
Conflict in public construction projects has increased for the last decades. It not only entails enormous social and economic costs but also makes stakeholders suffer from unnecessary expense and time waste. This study defines the the conflict index for public construction projects based on news data, and calculates conflict index for representative past and current public construction projects that has been deepened conflicts at the national level. The result indicates that the major conflict issue of the 2nd Jeju Airport Project are the environment and location whereas that of the Gaduk New Airport Project are the safety, location and necessity. This approach is expected to enable construction project managers to manage conflicts quantitatively based on comparing with past cases.
Proceedings of the Korean Institute of Building Construction Conference
/
2021.05a
/
pp.279-280
/
2021
The conflict is gradually increasing and becoming more serious in Korea. Especially, there are many conflict among stakeholders in public construction projects and its economic, social effects are enormous. This negatively affects the performance of construction projects, such as schedule delay and increasing construction costs. Complaints are often extended to public conflicts so that complaints have to be considered for conflict management. However, complaints and conflicts were distinguished and have been studied differently in previous studies. In this research, the literature that analyzed complaints and conflict factors was reviewed, and the complaint that included the conflict factors were categorized and derived.
Park, Sungjoon;Lee, Changjun;Han, Seung Heon;Yun, Sungmin
Korean Journal of Construction Engineering and Management
/
v.21
no.1
/
pp.70-77
/
2020
Public conflict in domestic project has been increased and it results in direct and indirect damages. In order to reduce the loss, there have been diverse researches on the public conflict. However, most of researches tend to mainly focus on characteristics of the conflict. Considering the conflict occurred in SOC project, a research of conflict with project characteristics is necessary. In response to consider the relationships between characteristics of project and conflict, this paper aims to present the relative importance of the relationships. We conducted literature reviews and interviews with experts to select main characteristics of projects and public conflicts. Based on the selected four main characteristics each, we analyzed the relationships between them using Fuzzy AHP. The results show that SOC construction project type among project characteristics exerts the most important effect on overall public conflict. Especially conflict factors and conflict phases among public characteristics are critically influenced by project types. The findings provide a foundation for a conflict management reflecting varying public conflicts due to project characteristics.
Korean Journal of Construction Engineering and Management
/
v.19
no.2
/
pp.61-72
/
2018
Conflicts in public construction projects lead to increase social costs as well as construction costs and schedule delay. Therefore, it is important to evaluate the conflict in construction project and find appropriate solutions based on previous cases. In this research, the conflict factors and criteria for evaluating conflict are derived and 30 cases are evaluated by 11 conflict experts. Using k-means clustering, the cases are clustered by three clusters. The cases were analyzed according to the characteristics of each cluster and labeled as 'NIMBY and harmful facility conflict cluster', 'environmental and pollution conflict cluster', and 'PIMFY and small conflicts'. In the future, when conflict occurs in the public construction projects, the conflict can be evaluated using this clustering and the characteristics of the conflicts can be found. As a result, it will be helpful to mitigate the conflict quickly and effectively by looking for previous cases that are suitable for resolving the conflict through appropriate clusters.
Recently, conflict management has emerged as a major issue. Among them, public conflicts that occur in the process of promotion public policies can have negative social effects, so it is very important to manage conflicts effectively. Therefore, this study aimed to examine the characteristics of public conflicts related to ports in order to lay the foundation for the smooth promotion of public policies related to ports. The significance of this study is that it collected and categorized conflict cases in the port sector through various channels to examine the characteristics of port-related conflicts more closely. The results of this study are summarized as follows. First, this study categorized port-related public conflicts by considering the characteristics of actors, life cycles, and issues, which confirmed that conflicts over ports have various issues. Second, we found that many port-related public conflicts have been resolved in a highly coercive manner. Third, it is necessary to explore non-coercive approaches to induce conflict resolution. Fourth, it is necessary to establish a dual system of proactive and reactive measures to manage port-related public conflicts.
Without exception, diverse LULU(Locally Unwanted Land Use) facilities have been under the location conflict, especially between the public government units and local residents. In spite of repeated trials-and-errors, literally, the location conflict has shown no sign of improvement over time in Korea. As practical means to tackle these issues, this study focuses on divulging explicit and implicit relationships among key factors derived from the location conflict on the LULU facilities. Here, major research variables cover residents' agreement, residents' perception, compensation expectation, and public opinion. As the location conflict on the LULU facilities could be strengthened or resolved by the dynamic feedback system, it applies basic tools geared toward causal loop diagramming. After repeated experiments, the study highlights the fact that the residents' perception, compensation expectation, and public opinion, individually and collectively, exert significant impact on the residents' agreement ratio.
International conference on construction engineering and project management
/
2022.06a
/
pp.111-118
/
2022
Conflicts in public construction projects become more serious and complex so that they have a negative effect on performance of projecets. Conflicts in public construction projects are defined as expanding in complaints. This study analyzes the relationship structure and effect on performance between complaints and conflicts. First of all, 219 survey data collected from industry experts were used to derive complaints arising from the project and to understand the characteristics of each complaint. In the case of environmental damages, rather than environmental damage during construction, harmful substances or effects that can occur in completed facilities cause complaints from local residents, and opposition from environmental groups has a great effect on time and cost increase. As for safety damage, civil complaints related to prevention and countermeasures for safety accidents occur frequently, and additional construction affects cost increases. Through this study, it is possible to understand the serious complaints that are prone to conflict in public construction projects, their frequency, and the performance of the project.
Journal of the Architectural Institute of Korea Planning & Design
/
v.34
no.12
/
pp.95-102
/
2018
The purpose of this study is to investigate the causes of conflict that arise from public pedestrian passages installed in apartment complexes through a survey of residents' perceptions and to investigate the effects on the satisfaction with and necessity of the public pedestrian passage. This has significance as a preliminary research into determining solutions to conflict related to public pedestrian passages that are open spaces, accessible 24 hours a day to pedestrians including people who live outside of the apartment complex. The result of the residents' perception survey showed that there is conflict due to the public pedestrian passage. The main problem was the noise-related variables. While management and safety variables were also perceived as problems, privacy and ownership infringement variables were not. These problems were reduced to four factors through a factor analysis: unfavorable incidents, environment management, ownership infringement, and safety crimes. Analyzing the effects of the above factors on the satisfaction with the apartment complex, satisfaction with the public pedestrian passage and the necessity of the public pedestrian passage, demonstrated that the unfavorable incidents factor influenced all the variables. The safety crimes factor, which is an extended concept of the unfavorable incidents, affected both the satisfaction and necessity of the public pedestrian passage. The ownership infringement factor was found to affect the satisfaction of the public pedestrian passage only, and the environment management factor did not affect all the variables. In planning and managing public pedestrian passages, avoiding incidents and crimes should be considered as a priority to increase the satisfaction of residents and solve conflicts.
Public conflicts in the port sector can cause additional social costs and delay the supply of port infrastructure, which can negatively affect local industries and national competitiveness. Although the importance of conflict management in the port sector is gradually increasing, there is still no systematic conflict management countermeasure. Therefore, in this study, the limitations of the current conflict management system in the port sector were considered, and a Delphi survey was conducted targeting experts and stakeholders in the port sector and conflict management. In addition, criteria for diagnosing conflicts in the port sector, causes of conflicts, proactive management measures, and ex post solutions were derived. The results of the Delphi survey analysis showed that the biggest causes of conflict were the absence of stakeholder opinion collection, consultation, and communication tools. Preliminary conflict management measures including a public deliberation process to collect local opinions and discuss development directions before deciding on specific issues, and ex post conflict resolution measures including investigation of causes of conflicts and objective personnel management in the process of preparing alternatives (e.g., securing reliability) were determined as the most important factors. In addition, based on the results obtained in this study, conflict management techniques for each phase of the port development project were presented. These findings are expected to be used as a useful reference material to reflect the port sector, which has not been included in the "Public Institution Conflict Management Manual (2016)" of the Office for Government Policy Coordination.
The research purpose of this paper is to afford a base data and a research direction for the effective conflict management. For this, this article analyzed the conflict research trend in the field of public administration. According to empirical analysis, the main research results are as follows. First, a published article number go on increasing in proportion to publication year. Second, a one-research paper have showed 71.2% of all papers because of limited researcher in the field of conflict research. Third, research paper which did not receive a research expenses have showed 73.1% of all papers. Fourth, research paper that used a empirical analysis and case study have showed 80.8% of all papers in the methodology of conflict. Fifth, the research purpose that aimed to propose an alternative and practical analysis have showed 91.3% of all papers. Sixth, about the research contents, it have showed each 50.0%(administration/institution and facilities location), 80.8%(interorganization conflict), 76.0%(intergovernment, between government and public), 64.5%(with local government) in a field, a level, a party, a relation of the conflict.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.