Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

An Analysis on the Employment Determinants of University Graduates in NURI Project Teams -the Case of the Universities in Busan Region- (누리사업단 대학졸업자의 취업결정요인 분석 - 부산지역대학의 사례 -)

  • Jun, Hyunjoong;Ryu, Jangsoo;Cho, Jangsik;Park, Sungik;Kim, Jonghan
    • Journal of Labour Economics
    • /
    • v.32 no.1
    • /
    • pp.31-56
    • /
    • 2009
  • This paper analyzes the determinants of the employment status of the NURI-project-teams' college and university graduates in Busan area. The major results are as follows: First, education level, household income, grade point average and certificate turn out to be significant variables to decide employment or spell of unemployment. Second, parents' education level, household income, the size of project team, the firm size are shown to affect employment in Busan. In particular, the bigger the firm is, the probability of getting job in Busan is getting smaller. And there are two sides of provincial university graduates' moving into the Metropolitan area; the voluntary move and the involuntary move. Third, sex., education level, major, grade point average, the size of project team etc, are found to be significant determinants of wage level.

  • PDF

Sari Case Design & Strategy Study (목(나전)칠기 사리(舍利)용기의 조형디자인 연구)

  • Kim, Jae-Won
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.11
    • /
    • pp.192-200
    • /
    • 2009
  • Market in the 21st century innovative products is not the same as marketing traditional products and services. Whether for survival or to sustain market leadership, Design Marketing Strategy is the key in the new era of world competition. Design Strategies are also more critical issues in the future, because most business and firms depend on successful design project. In order to effectively bring creative professional output to market, design leaders who can use design intelligence to shape the future of their organizations and business must evidence marketing strategy technology, creative and managerial skill. Design Management links design and related business activities into a creative and coordinated strategy for creating value and sustainable advantage for the firm. Design education has focused primarily in the training of professional designers within their specific disciplines. But it dose not provide training in the management skills necessary to effectively lead a design project team. Most design colleges do not provide any integrated education in leadership and team building, strategy, finance, marketing or project management. This is the time that Design Management Program should be prepared to provide design students who want to manage design project in creative industry. The program has to be prepared to provide all the business skills and information that design students need to know in an upper-level undergraduate school. The Program's goal is to graduate design leaders able to strategically manage a design project for the challenge of managing in the 21st century.

A Journey to Action Research in a Clinical Nursing Context (임상간호현장에서의 실행연구 여정)

  • Jang, Keum Seong;Kim, Heeyoung;Kim, Eun A;Kim, Yun Min;Moon, Jeong Eun;Park, Hyunyoung;Song, Mi-Ok;Baek, Myeong
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.19 no.1
    • /
    • pp.95-107
    • /
    • 2013
  • Purpose: The purpose of this study was to examine the effectiveness of Action Research (AR) approach in nursing. Methods: Participants were 64 perioperative nurses recruited from C hospital in Gwangju, Korea. The nurses were engaged in the project through 2 cycles of planning, acting, observing, and reflecting. A mixed-methods design was used to examine changes in participants and their knowledge management practice. Quantitative data were analyzed using SPSS 20.0 program and qualitative reflection data underwent content analysis. Results: During the project, participants developed standardized pre-operative checklists and opened an Internet Cafe to better manage their perioperative nursing information. At the end of the project, there was a significant increase in nurses' knowledge management (p=.015) and the rate of surgical material prescription errors decreased from 8.0% to 2.9%. Core AR project team members' teamwork skills and organizational commitment increased significantly (p=.040, p=.301, respectively). The main themes that emerged from the qualitative data were learning how to solve problems in practice, facilitating team activities through motivation, barriers of large participation, and rewarded efforts and inflated expectations. Conclusion: The AR project contributed to empowering participants to solve local problems. AR is a useful methodology to promote changes in practices and research participants.

An Effect on the Project and Organization Performance by PMO Service (PMO 서비스가 프로젝트 및 조직 성과에 미치는 영향 연구)

  • Lee, Seong-Mong;Kim, Hyunsoo;Kim, Eun-Hong
    • Journal of Service Research and Studies
    • /
    • v.2 no.2
    • /
    • pp.53-79
    • /
    • 2012
  • According to Electronic Times(2012. 1. 3), "PMO was introduced from 1950s in the USA and as of 2010, PMO participated in 84% of project ordered by public and private sector." And Ministry of public administration and security announced that the Ministry will organize Task Force for arranging "standard for introduction and operation of PMO" for support of project implementation and strengthening specialty of ordering organization, and then, actively launch the Task Force from February, 2012. Thus, necessity of PMO is regarded as natural in some aspect but thesis for doctoral degree written by Kim Gi-yeong(2007) suggested, "performance of several projects begun at the same time cannot be interpreted as high according to whether PMO team exists or not." Martin et al.(2005) asserted, "according to whether PMO team exists or not, but there is no significant difference in other factor." In the contradictory situation, it is necessary to perform more various approaches for performance and necessity of PMO in the academic aspect.

  • PDF

Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector (공공부문 시공책임형 CM 사업의 시공이전단계 성과분석)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.97-105
    • /
    • 2021
  • The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related laws and regulations to move to the formal ordering system, and the performance analysis of the project is still insufficient. In this paper, the effectiveness and reliability of the project were verified through the performance analysis of the Pre-Construction Service of the four pilot projects currently being implemented. The results of the study were analyzed in five areas including Team Building, Design Book, Construction Period, VE, and BIM. Through the interview survey, the problems were confirmed and improvement plans were presented. The results of this study are expected to be used as basic data for the legalization of ordering system to be implemented in the future.

Study on Priorities of South-North Korea Traditional Medicine Cooperation Project (남북 전통의학 협력 사업 우선순위 선정 연구)

  • Dongsu Kim;Jong-hyun Kim;Sujeong Im;Eunhee Yi;Eunji Ahn;Ohmin Kwon
    • The Journal of Korean Medicine
    • /
    • v.44 no.1
    • /
    • pp.76-87
    • /
    • 2023
  • Objectives: The purpose of this study is to draw priorities for candidate projects so that future inter-Korean traditional medicine cooperation can be promoted efficiently and effectively. Methods: This study used the Delphi-AHP method to derive priorities for the inter-Korean traditional medicine cooperation project. First, 33 candidate projects were selected through a data survey. In addition, the priority importance score was calculated through a 2-round mini-Delphi survey of 20 experts. The importance of 33 candidate projects was calculated by three evaluation criteria, and the weights for these three evaluation criteria were derived through the AHP method. Results: As for the weight by item, 'feasibility' was the highest with 0.6749 points, followed by 'social ripple effect' (0.1811) and 'instrumentality' (0.1439). As a result of calculating the importance score by reflecting the weight of the evaluation criteria for each project, the South's sole project, "Understanding the Status of North Korea's Korean Medicine," was the top priority, followed by the "Establishment of Strategy for Inter-Korean Traditional Medicine and Cooperation." Conclusions: As a result of this study, experts now believe that it is important to prioritize the highly feasible South Korean independent project in the field of traditional medicine between the two Koreas. This will serve as the basis for promoting cooperative projects in the event of future changes in the inter-Korean situation.