A study on the normal project duration development for the construction of multi-utility tunnel in the existing city (기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구)

  • Lee, Seong-Won;Lee, Pil-Yoon;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.677-685
    • /
    • 2018
  • In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.

A Study on Schedule Management in Construction Projects by CCPM (CCPM을 이용한 건설사업 일정관리에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.84-92
    • /
    • 2004
  • Construction work varies with the project types. However, the success of all project types depends upon three conditions i.e. schedule, quality and cost. If these three conditions are fulfilled, then project said to be successful. In this paper, scheduling of a construction Project has been dealt with the application of CCPM method. CCPM has been introduced as a new theory in construction industry in 1997 at the United States, but its application is still insufficient in domestic field due to the absence of systematic study, A simulation has been conducted in a Bridge construction project to validate the possibility of CCPM in order to complement PERT/CPM in construction field. The result of study shows that the CCPM could be effective to reduce the project time duration than existing PERT/CPM technique.

Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm (유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발)

  • Kim, Minjung;Park, Moonseo;Lee, Hyun-soo;Lee, Jeonghoon;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.54-64
    • /
    • 2015
  • The modular construction has several advantages such as high quality of product, safe work condition and short construction duration. The manufacturing planning of modular construction should consider time frame of manufacturing, transport and erection process with limited resources (e.g., modular units, transporter and workers). The manufacturing planning of multi modular construction project manages the modular construction's characteristics and diversity of projects, as a type of modular unit, modular unit quantities, and date for delivery. However, current modular manufacturing planning techniques are weak in dealing with resource interactions and each project requirement in multi modular construction project environments. Inefficient allocation of resources during multi modular construction project may cause delays and cost overruns to construction operation. In this circumstance, this research suggest a manufacturing planning model for schedule optimization of multi project of modular construction, using genetic algorithm as one of the powerful method for schedule optimization with multiple constrained resources. Comparing to the result of the existed schedule of case study, setting optimized scheduling for multi project decrease the total factory producing schedule. By using proposed optimization tool, efficient allocation of resource and saving project time is expected.

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.

  • PDF

Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing -Focusing on One Cycle Time Scheduling Mechanism of Typical Floor- (아파트 골조공사의 공기단축 및 효과적 공정운영 방안 -기준층 사이클 공정분석을 중심으로-)

  • Han Choong-Hee;Bang Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.87-96
    • /
    • 2004
  • The construction duration in apartment construction is an important factor which affects project cost. Henceforth, the time shortening is essential to retrench project cost and project risk when there adopt Five-Day Workweek and introduce apartment sales after completion of construction. Therefore, the purpose of this study is to examine closely the affecting factors on the duration of framework which forms about $40\sim50\$ percent of total time in apartment construction by analyzing the schedule mechanism of typical floor and to show the reasonable time shortening methods by case study. The shown schedule mechanism and basic schedule table can utilize as a guideline in case of scheduling of framework in the existing construction method. Also, the shown time shortening methods by three case studies will guide the direction and process of time shortening while there need time shortening in many-sided projects.

A Study on Proto-type Development of BIM based Stochastic Duration Estimation Module (BIM기반 추계학적 공기 예측 모듈 프로토 타입 개발에 관한 연구)

  • Park, Jae-Hyun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.159-162
    • /
    • 2009
  • Today's construction is more various and more complex. Because of that, a lot of uncertain factors are occurred and they related uncertain construction duration. For management complex architecture project, importance of construction schedule management also increased. In previous studies, one of solutions to overcome those problems is suggested. It was BIM based construction simulation process which focused on construction schedule and construction schedule management. But latest process had limited point which has no duration estimation function. So this paper suggested duration estimation method and developed duration estimation module. Duration estimation module developed with current scheduling tool MS Project and their macro function. However, this module has just developed Reinforced Concrete Structure and has to do more development and research.

  • PDF

An Administration Model for Causation of the Schedule Delays in Construction Projects (건설공사 공기연장사유 관리모델)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.125-133
    • /
    • 2007
  • If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.

A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project (공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리)

  • Yang Yong-Cheol;Kim Sang-Hee;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.123-136
    • /
    • 2003
  • In multiple apartment construction project, BCWS is a critical management factor and has a great influence on the success of the project. Due to the many apartment buildings & facilities which produce numerous activities, there are several problems in making out a time schedule of work as well as production and management of precise BCWS from the allocation of resources. In this study, actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of BCWS through the analysis of the problems and standard schedule & progress curves.

Barriers of Last Planner System: A Survey in Vietnam Construction Industry

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.5-11
    • /
    • 2013
  • Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to 'owner - contractor' pair with 77.1% importance indices; whereas the lowest belongs to 'consultants - contractors' pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained.

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.