• Title/Summary/Keyword: project performance evaluation

Search Result 618, Processing Time 0.031 seconds

MAINTENANCE PERFORMANCE EVALUATION OF THE BUILDINGS IN THE DESIGN PHASE

  • Hakyu Baeck;Chansik Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1138-1143
    • /
    • 2005
  • As the importance of building maintenance is being emphasized, studies regarding the efficient building maintenance focus on the evaluation of the maintenance plan, implementation and its cost only while the evaluation of the maintenance performance is nearly ignored. At this point when the importance is placed on the performance design we need to have methods to improve maintenance performance of the buildings in Design Phase. The purpose of this study was to set the design evaluation items to improve the maintenance performance of the buildings. Through the review of the existing literature, we set the concept of the maintenance performance and suggested evaluation items to evaluate the maintenance performance through the analysis of domestic and overseas certification and design guidelines.

  • PDF

Preparatory Applications for Performance-based Regulatory System in Japanese Landscape Architecture Related Fields (일본 조경관련 분야의 성능규정화 대비방안)

  • Kim, Min-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.5
    • /
    • pp.37-45
    • /
    • 2007
  • WTO/TBT requires that, for technical regulations affecting trade, technical regulatory requirements must be specified where possible in terms of performance rather than design or descriptive characteristics. The movement which made "performance" a keyword in landscape architecture was activated in Japan, one of the leading counties in performance-based regulatory system(PBRS). The Japanese recent movement of systematization activity on performance-based standards and specifications was reviewed and operational applications for performance-based regulatory system in South Korea are summarized as follows: 1. The establishment of performance standards that can be properly evaluated by assessment indicators is necessary in cases when quantitative evaluation is difficult. 2. As a preparation for PBRS, a brief procurement system by technical proposal for the landscape design and construction is necessary. 3. As a preparation for PBRS, activation of an environmental performance evaluation on experimental construction is necessary. 4. As a preparation for PBRS, a certification system of environmental performance on various landscape construction methods is necessary. 5. The Private Finance Initiative Project is the most similar to PBRS therefore, activation of the Private Finance Initiative Project is necessary in landscape architecture projects for park rehabilitation.

A case study on improving the performance of R&D org. using software configuration method (소프트웨어 형상관리 기법을 이용한 R&D조직 성과향상 사례연구)

  • Kim, Byeong-Sam;Jang, Byeong-Man;Kim, Jeong-Han
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2007.11a
    • /
    • pp.408-412
    • /
    • 2007
  • This paper presents, with some actual cases of employing clear case, as a R&D project configuration management tool, a new methodology for the evaluation and enhancement of project performance in R&D organization. This methodology enables you to forecast future results of the project with story telling skill, to innovate R&D project execution using the concept of Technology Supply Chain with global R&D human resources, to improve the performance of each development stage based on the voices of customer, and to enhance the quality of output and to minimize risk of project with timely positioning of R&D human resources.

  • PDF

A Study on Operational Performance Evaluation of Marine Forest Creation project by BSC, AHP and IPA (BSC-AHP-IPA를 활용한 바다숲 조성사업의 운영성과 평가에 관한 연구)

  • Cho, Sun-Je;Hong, Jae-Bum
    • The Journal of Fisheries Business Administration
    • /
    • v.48 no.1
    • /
    • pp.31-49
    • /
    • 2017
  • This study focuses on developing a theoretical framework for evaluating Operational Performance of the Marine Forest Creation project on a balanced and comprehensive perspective by using BSC, AHP, and IPA. Also, the purpose of this study is empirically to analyze operational performance of the project and to suggest the future improvement plan. For this purpose, We will first determine the critical success factors(CSF) and key performance indicators(KPI) required for evaluating the performance of the Marine Forest Creation project from the four perspectives of BSC. And, After determining the weight for each of CSF, KPI, and four perspectives of BSC by using AHP, we will measure the project performance. We will also conduct IPA analysis to propose the direction of improvement of the Marine Forest Creation project. The results of this study are as follows. First, this study has drawn 8 critical success factors and 16 key performance indicators for four BSC perspectives based on the theoretical considerations and expert interview survey. Second, as a result of deriving relative importance of BSC perspectives using AHP, customer perspective was the highest, followed by financial perspective, learning and growth perspective, and internal process perspective. Third, as the results of analyzing the importance and performance of BSC perspectives using IPA, customer perspective was the maintenance reinforcement category, financial perspective was the key improvement category, internal process perspective and learning and growth perspective were gradual improvement category. This study has a great academic significance in terms of BSC first tried to evaluate the performance of the Marine Forest Creation project. The results of this study are expected to lead to various discussions for a balanced and comprehensive verification of Marine Forest Creation project performance.

A study on the Project Process Management System (PPMS) for the effective management of R&D projects (연구개발(R&D) 프로젝트의 효과적 관리를 위한 과정모형에 관한 연구)

  • 김홍범
    • Korean Management Science Review
    • /
    • v.12 no.3
    • /
    • pp.45-60
    • /
    • 1995
  • This study examines a normative model of project management systems, PPMS, to provide information for directing R&D activity in order to increase R&D productivity. The PPMS (Project Process Management System) is a disciplined and systematic framework to manage R&D projects effectively and efficiently under the assumption of a strategic decision making and long-range planning. The purpose of PPMS is to provide for the management of research organization at different levels an effective management tool; first, for the planning system which deals with rational selection and authorization of R&D projects, second, for the control system which concerns monitoring and controlling the execution of R&D projects, and finally, for the evaluation system which attains evaluation of the performance results of R&D projects and determination of the necessary follow-up. A view for the future development of project management within the context of a project-performing organization is also elaborated to exhibit the progress and phase description of the project management system.

  • PDF

An Impact of Project Performance by Using Smart Construction Technology (스마트 건설기술 활용에 따른 프로젝트 성과 영향에 관한 연구)

  • Kim, Taehoon;Cho, Kyuman
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.291-292
    • /
    • 2023
  • In line with the advent of the 4th industrial revolution, project performance such as construction productivity and safety is being improved through the use of various smart technologies in construction projects. However, most studies focus on case analysis according to technology application, and research on performance impact and evaluation methods is insufficient. However, the performance impact of the use of smart construction technology can vary greatly depending on the capabilities and level of support of the organization using the technology. Therefore, this study aims to establish factors that affect the performance of smart construction technology utilization at the organizational level and analyze the performance impact relationship. The results of this study will provide the basis for establishing an organizational system and evaluating performance for the efficient use of smart construction technology in the future.

  • PDF

Evaluation on Performance Level of Design-Build and Design-Bid-Build (Focused on Bridge Construction Projects) (발주방식에 따른 성능수준 평가에 관한 연구)

  • Cho, Kyu-Man;Kim, Hee-Wook;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.75-83
    • /
    • 2007
  • Recently, the Design-Build (DB) delivery method in public sector makes some argument by reason of the initial cost which is more higher than those of Design-Bid-Build (DBB). According to the results of pervious researches related to the performance evaluation of delivery method, DB can lead the reduction of project cycle time and also is superior to the traditional DBB in terms of construction quality. The performance on each delivery method could be generally evaluated by a project cost and a project cycle time as one of quantitative analyses, and also by construction quality as one of qualitative analyses. In most researches, the evaluation of performance level based on delivery methods has been evaluated by the degree of their satisfaction through the interview with owners. Therefore, this paper analyzed the design documents of construction projects delivered by traditional DBB and DB in bridge construction projects in order to measure design quality, constructability, maintainability, and etc. As an above-mentioned analyses, finally, this research shown that how much the difference of performance level is by each delivery method.

Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase (대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석)

  • Ham, Nam-Hyuk;Yuh, Ok-Kyung;Ji, Kyu-Hyun
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

A Case Study on the Evaluation Framework of a New Service Model in the Public Sector: Focusing on the Mobile Application Project (공공기관 지원사업 선정평가 프레임워크 개발 및 적용: 모바일 앱 서비스 지원사업 선정사례 중심)

  • Bae, Junseong;Kim, Eunhee;Koh, Joon
    • Information Systems Review
    • /
    • v.14 no.2
    • /
    • pp.117-140
    • /
    • 2012
  • It is hard, but important to evaluate and select a new service model for the public sector, accompanying unexpectable risk. The purpose of this study is to build and develop the evaluation framework of public projects and to present a project evaluation system which is more rational and methodical. The evaluation framework has been developed by calculating the evaluation criteria and weights resulted from an interview with an expert group and Analytic Hierarchy Process(AHP). Moreover, market-oriented characteristics, technology-oriented characteristics, service development capabilities and policy-oriented characteristics were predominantly chosen as the evaluation items. The re-evaluation of the app development support programs was conducted to check the feasibility as an evaluation system influencing the performance of firms. The result of an evaluation system proposed by this study showed better evaluation performance than previous ones, better predicting the actual business performance. Currently, though the policies of the public sectors and support programs focus on the outcome and performance management, the result of this study shows the importance of project selections. Also, implications of the study are discussed.

  • PDF

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.