Investigation of Key Factors to measure on-site Performance of a Construction firm

  • Lee, Young-Dai;Kim, Jung-Ki;Acharya, Nirmal Kumar
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.246-262
    • /
    • 2007
  • The performance of projects has always been an area of interest in the construction industry. Roles of all construction supply chain partners are necessary; however the role of a contractor firm in the construction project is pivotal. So, this research intended to explore a Construction Firm's performance criteria which could measure the level of performance of that firm in an ongoing project. Data was collected from construction professionals working in three principal project participant organizations, namely Owner, Consultant and Contractor. A total of 113 nos. of performance measuring items were sorted from literature review and used to collect data. Statistical tools processed by SPSS program was employed to analyze the data. Out of total 113 items, only 65 nos. of variables were found to be acceptable to every population group of this study. Factor analysis revealed 12 key performance predicting factors (KPPF) with 53 predictive indicators. 12 KPPFS with index weight are: work progress and smoothening (9.3%), change order management and work accuracy (9.1%), business relationship building (8.1%), adequacy of construction work procedure (8.6%), quality performance (8.0%), health and site safety adequacy (8.8%), Innovative contractor (8.0%), adequacy of construction site information (6.8%), compliance with contract plan/specification requirements (8.9%), creditworthiness and financial capability (8.3%), intra-agency relationship and responsiveness (7.0%) and resource management (9.2%). These results could be useful to project management body to evaluate performance of its contractor firm on site as well as the contractor itself to assess own performance and its subcontractors on-site.

IT 프로젝트 관리자의 리더십 유형별 역량이 프로젝트 성과에 미치는 영향

  • Kim, Hwa-Yeong;Gang, So-Ra
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.96-101
    • /
    • 2007
  • This study has examined the project managers' competency and suggests three competency factors, which are technical, human, and conceptual skills, for the success of IT projects. The study suggests that IT project managers should master three critical skills and knowledge requirements, and consider the proper leadership style for the successful implementation of IT projects. Especially this study has examined the effect of the fit between project managers' competency and leadership style on the performance of IT projects.

  • PDF

Project Experience and its Impact on Project Performance (프로젝트 경험이 프로젝트 성과에 미치는 영향)

  • Yu, Gun Jea
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.8
    • /
    • pp.365-373
    • /
    • 2014
  • The assignment of exploration on individuals provides challenging work environments, while it generates high levels of complexity. On the other hand, the assignment of exploitation on individuals offers less challenging work environments, while it makes low levels of complexity. Give the characteristics of exploration and exploitation, I argue that the assignments of both exploration and exploitation create the favorable work environments to individuals. Developed hypotheses were tested using a logit regression from a sample of 168 project managers in a R&D center. I found that a manager who experienced exploitation project(s) is positively related to higher performance in exploitation project(s). In addition, a manager who experienced both exploitation and exploration projects are found to be positively associated with higher project performance.

The Effect of Customers' Participation and Satisfaction on Performance of IT Project (IT 프로젝트의 고객참여 및 만족도가 성과에 미치는 영향)

  • Kang, Sora;Kim, Min Sun;Kim, Myung-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.12
    • /
    • pp.5721-5727
    • /
    • 2012
  • In this study, we examine the effect of customers's participation and satisfaction on performance of IT project. This study collected data from the project team members of the next-generation internet banking project in K Bank. We found that customers's participation has positive effect on their satisfaction of IT project and the satisfaction also has a positive influence on performance of IT project. Implications and directions for future research are discussed.

Quality Management Model for Process Performance Level and Development Technology (프로세스 이행 수준과 개발 기술 품질 관리 모델)

  • Park, J.H.;Park, Y.S.;Jung, H.T.;Kim, S.H.
    • Electronics and Telecommunications Trends
    • /
    • v.32 no.6
    • /
    • pp.105-115
    • /
    • 2017
  • This paper describes a project - based quality management model that identifies development technologies and codes while at the same time verifying the ability to implement processes that are essential in R & D projects. In order to verify the process implemented in the R & D project implementation, there are review, checking points, and evaluating methods the process performance levels for five processes such as defining requirements which is the beginning stage of system development, testing process which is the completion stage of system development, and project management and peer review process for project management and support in the proposed project-based quality management model. For development technology and code validation, the model included the documented test cases for each requirement by the developer in the requirements definition stage, debugging and testing in the design and implementation stages, static analysis and open source licence verification procedure, and system environment. After applying the model in SW development R&D project for evaluating the process performance, and verifying the development technology and the code, the developers responded that the improvement in the development technique and the code, and upgrade of process performance level for project are more than 10%.

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

Analysis of Actual Condition of Innovative Sharing University Project for the Human Resource Development of Digital New Technology (디지털 신기술 인재양성 혁신공유대학 사업 실태 분석)

  • Han, Jiyoung;Lee, Seungyeop
    • Journal of Engineering Education Research
    • /
    • v.26 no.4
    • /
    • pp.66-78
    • /
    • 2023
  • The purpose of this study was to analyze the actual condition of the innovative sharing university project. To this end, a focus group interview was conducted by selecting officials participating in the innovative sharing university project as study participants. The collected data was analyzed using the content analysis method. The results of the study are as follows. First, in terms of the promotion system and operation dimension of project group, study participants presented difficulties and improvements in terms of the national promotion system and university-level project operation. Second, in terms of curriculum management dimension, study participants presented difficulties and improvements in content development and sharing, engagement support for professors and students participation, and securing and sharing educational infrastructure. Third, in terms of management of project performance indicators, study participants presented difficulties and improvements in managing core performance indicators, managing autonomy performance indicators, and sharing project performance. Based on these study results, suggestions for the use of research results were presented.

The Necessity of Performance Goal Setting Phase for Construction Project (건설사업 성과목표수립 단계의 필요성에 관한 연구)

  • Jeon, Me-Yeon;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.159-162
    • /
    • 2011
  • The goal setting and performance measurement is essential tool for performance management. If appropriate goal setting and performance measurement is not done, problems may arise in the management. Therefore, in order to improve the efficiency of building production that management is essential. In addition, the construction project objectives established at the planning phase give considerable influence on the success of the construction project. Therefore, objective of this paper is to suggest the necessity of performance goal setting phase. This paper analyzes problems of goal setting phase and suggests the way to improve about problems.

  • PDF

Exploring Control in Bottom-Up Information System Development Projects to Improve Software Development Performance

  • Cho, Donghwan
    • International Journal of Contents
    • /
    • v.15 no.2
    • /
    • pp.38-43
    • /
    • 2019
  • Recently, bottom-up information systems (BUIS), developed according to the requirements of individual user departments, have become popular. However, effective management of BUIS projects is not enough, with many organizations having experienced integration challenges with such individual projects. BUIS projects are relatively small and limited in scope, as opposed to the large, complex systems developed through traditional top-down information system development projects. Due to these differences in characteristics, the control modes as well as the aspects to improve development performance in each type of project are also different. Therefore, it is difficult to apply the results of prior research on control in system development projects to improve BUIS project performance. The purpose of this study is to derive a new theory of control to improve BUIS project performance. The results contribute to the improvement of firm performance through effective control of BUIS projects in modern enterprises.

Cost Normalization Procedure for Phase-Based Performance Measurement

  • Choi, Jiyong;Yun, Sungmin;Oliveira, Daniel;Mulva, Stephen;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.72-76
    • /
    • 2015
  • Capital project benchmarking requires an effective cost normalization process to compare cost performance of projects accomplished in different time and location. Existing cost normalization approaches have been established based on the assumption that all required information for cost normalization is fully identified once a project is completed. Cost normalization, however, is sometimes required to evaluate phase-level outcomes of an ongoing project where the required information is not fully available. This paper aims to provide a cost normalization procedure for phase-based performance assessment. The procedure consists of three normalization steps: currency conversion, location adjustment, and time adjustment considering various scenarios where the required information is not fully identified. This paper also presents how the cost normalization procedure has been applied to the 10-10 Performance Assessment Program, which is a phase-based performance assessment system developed by the Construction Industry Institute (CII). Both researchers and industrial professionals can apply the cost normalization procedure to studies and practices regarding to cost estimation, feasibility analysis, and performance assessment.

  • PDF