Applying Unit Modular In-Fill Construction Method for High-Rise Buildings

  • Moon, Sangdeok;Kim, Junyoung;Lee, Jaesung;Ock, Jongho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.132-137
    • /
    • 2015
  • A modular construction method includes factory-prefabricated room-sized volumetric units. Although low-rise buildings have been constructed worldwide using this method for more than 30 years, it is a relatively new technology in high-rise construction. There are three basic methods of constructing high-rise buildings using modular construction: the core method, the core-and-podium combination method, and the modular in-fill method. While the first two have been used in the USA and in several European countries, the third method, introduced in 2011 by an international cruise ship development firm, is a rather new approach for which there are few case histories. Therefore, its applicability and construction feasibility should be verified. As a pilot study to test the applicability of the modular in-fill method, a 12-story residential building was built in Korea. This paper describes a case study of the pilot project. The advantages and disadvantages of the method and its applicability in terms of cost effectiveness and construction schedule management were evaluated.

  • PDF

A Study on Economic Analysis of Improvement of High Accident Locations in Highway(Focused on Safety Facilities) (고속도로 사고다발지점 개선사례 경제성 분석에 관한 연구(안전시설물 중심으로))

  • Park, Je-Jin;Joo, Jae-Woong;Lee, Jong-Chul;Ha, Tae-Jun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.7 no.2
    • /
    • pp.92-99
    • /
    • 2008
  • The rapid economic growth in Korea raised the increase of transportation demands about the passengers and the goods, and caused the concentration on cities. By the rise of a nation's income level, a automobile is necessary in our modern life. However, the traffic delays and traffic accidents that are raised by automobiles decrease the evaluation about a nation's economy and then the government practices the traffic safety improvement project. In this study, by performing the improvement project, we expect to achieve the following objectives. First, this study analyses the degree of effectiveness whether or not success in the improvement. Second, to supply the data on the effectiveness of the improvement and to inform the necessity of improvement. Third, to supply the information on the improvement project to the parties concerned. In this paper, through the study about identification of high accident locations, the effectiveness for the number of accidents and accident rates before-after the improvement is analyzed. Also, the B/C analysis about this locations is performed. This study shows that the number of accident and accident rates are decreased after the improvement, and there is economic validity about improvement of high accident locations.

  • PDF

Changes in Water Quality, Flora and Vegetation of Cheonggye Stream Before, During and After its Restoration (청계천 복원공사 전.중.후의 수질과 식물 및 식생의 변화)

  • Kim Hyea-Ju;Kim Sung-Hwan;Kim Song-Yee
    • Korean Journal of Environment and Ecology
    • /
    • v.20 no.2
    • /
    • pp.235-258
    • /
    • 2006
  • The monitoring of vegetation and water quality before(2003), during(2004) and after(2005) the restoration work of Cheonggye Stream indicated that $BOD_5$ concentration before the project averaged 51.1mg/L and that both the inflow of water from Hang River and the funnel of subway station water into the stream lowered the $BOD_5$ to 3.3mg/L, improving its water quality to the third grade. Species of plants slightly increased from 121 to 132 after the restoration. Specifically, perennial plant comprised 35.6%, an increase from 24.8% recorded before the restoration. Phragmites communis and Zoysia japonica communities were observed as the introduction vegetation. However, Humulus japonicus and Erigeron canadensis communities, which were classified into the first grade according to the vegetation conservation classification, were found to be still prevailing though they were dominant community before the restoration, meaning that the ecological condition of plants had not changed very significantly. An the other hand the water quality of the reference reach was classified into the first grade based on $BOD_5$, which implies the water quality of the section was better than the project reaches. Besides the section had more diverse plant species which numbered 154, and furthermore, the rate of immigrated plants comprised 13% which was lower than 28.8% recorded by the project sections. The project reaches are considered to be inferior to the reference section in terms of ecological condition. The effectiveness of the stream restoration cannot be determined only by such short-term investigation as was conducted in this study, and it is considered that the effectiveness of the restoration of Cheonggye Stream can be determined only if investigations in other major factors are conducted over the long-term period.

The Effectiveness of the Practice for the Arts and Crafts by machine for Project Based Learning upon Improving Industrial High School Students' Key Competency for Vocation (공업계 고등학교 기계공작실습에서 프로젝트 학습법의 적용이 학생들의 직업초능력 향상에 미치는 효과)

  • Lee, Young-Min
    • 대한공업교육학회지
    • /
    • v.35 no.2
    • /
    • pp.1-24
    • /
    • 2010
  • The purpose of this study is to investigate provedly the effectiveness of the practice for the arts and crafts by machine for project based learning upon improving industrial high school students' key competency for vocation, and to provide the incumbent teachers and future teachers who want to conduct research, a similar study with the basic reference materials. The vocational key competencies interested in this study are communication ability, information usage skills, team work skills, problem solving skills, tool usage skills, and responsibility and confidence areas. Because the result of pre and post testing over these six areas has insignificant differences statistically, we reach a conclusion which project based learning is more effective than traditional practice methods at improving the vocational key competencies of industrial students. On the basis of the results of this study, I would like to suggest some kinds of things needed to improve the vocational key competencies of industrial high school students. First, we require the diverse research to investigate the best teaching and learning methods to cultivate people of ability with the vocational key competencies Second, it is required that to measure the extent of the improvement of the vocational key competencies of industrial high school students, we have to develop a more objective test tool than that used in this study. Third, in the light of facts that project based learning influences on improving the vocational key competencies of the industrial high school student, we will have to make an effort actively to find the best teaching and learning methods, like project based learning. Therefore, we need to give diverse training opportunities and financial support so that teachers can conduct research to find the best teaching and learning method at improving the vocational key competencies for industrial high school students.

  • PDF

Improvement of Detailed Indicators and Application of Methodology for Post-Evaluation of National River Project (국가하천사업 사후 평가를 위한 세부지표 개선 및 방법론 적용)

  • Jang, Chorok;Jang, Moon Yup;Song, Juil;Kim, Han Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.188-196
    • /
    • 2021
  • Korea has invested heavily in projects related to national rivers, but there is no evaluation technique and system to manage river projects that can evaluate the effectiveness of the river projects after they are completed. Their absence leads to the inability of information on river construction sections, analysis of project effects, and benchmarking between projects. This may cause over-budget, overlapping investment problems due to the implementation of similar projects in the same section, and incorrect business elements may be repeatedly utilized. In order to solve this shortcoming, this study developed river project evaluation techniques and a river project (construction) management system. The development of evaluation techniques enables comparison and analysis between projects and can be utilized in establishing maintenance plans. The system can also provide inquiry of construction information, visualization of construction, and management of performance items. In this study, the evaluation techniques developed through prior research were modified and supplemented, and the effectiveness was verified by applying them to national river projects in A river and B river. It is expected that the evaluation techniques and system utilization measures presented will increase the work efficiency of river projects and enhance the efficiency of river projects.

The Construction Management Plan of Dong Myoung Service Area (동명휴게소 건설사업관리 수행계획)

  • In Chi-Sung;Kim Jeong-Won;Jung Soon-Gil;Park Gwon-su;Lee Sung-Gak;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.40-47
    • /
    • 2003
  • The main purpose of Construction Management(CM) is the improvement of efficiency and effectiveness of the project with construction methodologies systematically and technically. This pilot project Dong Myeong Service Area and Gas Station project among 5 projects designated and supervised by Ministry of Construction and transportation(MOCT), is to reduce cost, to maintain and control schedule, to keep proper quality, Claim and Risk through Partnering, Design Review, Constructability, Value Engineering and Project Management Information System(PMIS) and so on. Major factors of CM Plan are introduction of the phased and classified Construction Management Services from initiation of project to completion and adaptation of CM technologies and guide the implementation methodologies of the CM Pilot Project in CM construction market.

  • PDF

Applying rework indicator to control software development project (소프트웨어 개발 프로젝트 제어를 위한 재작업 지표의 적용)

  • Han Hyuk-Soo;Kim Han-Saem
    • The KIPS Transactions:PartD
    • /
    • v.13D no.1 s.104
    • /
    • pp.61-66
    • /
    • 2006
  • It is reported that the success ratio of software development projects has been only 30%. Many causes lower project's chance of success, particularly lack of systematic project management. Especially, moving on the next phase of project with unsatisfactory outputs can be very problematic because it can cause much waste of resource, time and even lead to the failure of the whole project. Peer review and inspection are some of the practices designed to prevent such waste and possible failure. When defects are identified through such progress, each developer has to work on the product component again and fix the problem. This process is called rework. In this paper, we propose a method for improving quality of reworked product component to prevent excessive cost and time consumed caused by moving on the next phase of a project with a problematic product component. More specifically, this paper suggests a rework indicator that measures the level of rework based on its complexity and severity and is used to choose appropriate checking method on reworked product component. The research also confirmed the method's usefulness and effectiveness by applying the suggested method on four projects.

Suggestions for Resolving the Social Conflict in Affordable Housing

  • Park, Tae Soon;Lee, Mihong
    • Land and Housing Review
    • /
    • v.5 no.3
    • /
    • pp.179-191
    • /
    • 2014
  • The purpose of this study is to employ a method called 'conflict impact assessment' to analyze the progress, background, cause and relevant issues of conflicts related with affordable housing for youth (Happiness Housing Project), a project that has been implemented since last May 2013, thereby identifying the relevant problems and draw out objectives for improvement. The researchers expect that this study will contribute to solving the current issues regarding Happiness Housing, and contribute to improving the quality of the government's policies. For the above purpose, literatures on Happiness Housing produced from August to November 2013 were reviewed, in-depth telephone or face-to-face interviews were conducted with personnel associated with project implementation in the Ministry of Land, Infrastructure and Transportation and LH, etc., and major interested parties including Yangcheon-gu residents. Key issues identified regarding Happiness Housing construction include: the way that the project was implemented, living quality of residents, impact on educational environment, inconsistence with existing plans, relatively high construction cost, insolvency of public corporations, land use fee issue with Korail, need of preliminary feasibility survey, securing sufficient amount for supply and issue of additional designation, likelihood of finishing construction in time and issues related with actual source of demand, etc. Through analysis of conflict development and positions of interested parties, the main causes of the conflicts were identified as follows: lack of deliberation on pledges during election, lack of viability review on pledges, lack of conflict management plans, one-way implementation without consent of interested parties, project plans established with no regard to local circumstances, frequent project revision, underwehlming level of conflict management. In order to address issues above, the following measures need to be taken: selecting election pledges based on actual effectiveness, thorough assessment on pledges by relevant departments, gradual implementation based on consideration of the actual circumstances, participation of key interested parties, consistent policy and adopting conflict management techniques that reflect the reality.

A Study on Software Dev. Project Management System Acquisition and Implementing on project site (SW개발 프로젝트 관리시스템 도입 및 적용사례에 대한 연구)

  • Jeon, Hyeong-Kweon;Park, Koo-Rack;Jung, Jin-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.5
    • /
    • pp.91-98
    • /
    • 2015
  • In this paper, we introduce PMS's main function and main effect which implemented medium and large scale software development project site, and we propose importance and improvement nacessity of PMS implementation. PMS's main functions are developed based on best practices which CMMI model and PMBOK. Also, each PMS has specialized unique function according to it's target industry area or related I.T solutions which has infra dependency. The effectiveness of PMS implementation on project site is seperated two types, one is qualitative effect, the other quantitative effect. Representative qualitative effects are improvement of enterprise's image and competency. Also representative quantitative effect is reduction of project management cost as a financial effect. As far as project size is increase, PMS's needs and necessariness will be increase, so we need to improve PMS;s function according to project management's global trend and software customer's requisition.

Project Approach in the Organization of Scientific and Methodological Work by Applying Information Technology in Higher Education Institutions

  • Bieliaiev, Serhii;Ponomarova, Halyna;Repko, Inna;Stepanets, Ivan;Chagovets, Alla;Mykhailichenko, Mykola
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.12spc
    • /
    • pp.620-628
    • /
    • 2021
  • The article is devoted to studying the development of scientific and methodological work and its impact on the quality of students' vocational training in higher pedagogical education institutions by applying information technology. The article aim is to development of the organizational methodological support and pedagogical diagnostics of the effectiveness of the project «Modelling scientific and methodological work in a higher education pedagogical institution by applying information technology » realization in the framework of increasing the level of scientific and methodological work in a higher education pedagogical institution as a factor contributing to enhancing the quality of pedagogical education. The research program of the project activity envisages stating and substantiating the problem of scientific and methodological work by applying information technology in the framework of increasing the level and quality of educational activities in a higher pedagogical education institution through the implementation of the project approach, developing a model for the system of organizational and methodological support of the project implementation as well as monitoring the process and evaluating the results of the project implementation in terms of developing teachers' scientific, methodological, information competency and enhancing students' progress in studying. The set of criteria were developed to evaluate the level of formation of scientific and methodological competency as a result of implementing the project for the development of scientific and methodological work. The scientific and methodological work by applying information technology in the academy was carried out in accordance with the following principles: systematic character, consistent diagnostics, practical focus, scientific organizational and methodological support.