가상건설기법은 공사대상 시설물을 설계부터 시공까지 3차원 가상공간에서 시행하여, 가상건설과정에서 실제 공사의 문제점을 해결할 수 있는 기법이다. 본 연구에서는 철도연사 시설물을 가상건설기법으로 시공하는 방법론을 구축하였으며, 구축된 방법론에 근거하여 실제 시스템을 개발하여 호남고속철도의 역사 시공과정에 적용하여 실무 활용성을 검증하였다. 연구에서는 시퀀스다이어그램을 이용한 방법론을 통해 레이아웃 리뷰, 레이어 시뮬레이션 기능을 구축하였다. 이러한 기능은 건설프로젝트 정의의 이해를 돕고 3D 시뮬레이션의 효과를 증진시킬 수 있다. 이러한 가상건설기법은 철도역사 시설물의 시공단계 검증 도구로서 공정관리 시각화와 시공 적정성 판단 등의 도구로 활용될 수 있다.
The present study aims to monitor three of the community empowerment projects implemented as part of the community central revitalization projects in Yeongwol. We used an established indicator (i.e., quantitative evaluation) as well as an interview (i.e., qualitative evaluation) throughout the monitoring process. The PM (project manager) committee members, consisting of six interdisciplinary experts, carried out the monitoring from $24^{th}$ of October until the $26^{th}$ of November 2018. We categorized the results of the monitoring into the aspects of needs, software, and hardware, and analyzed them as follows: First, although the locals were willing to take part in programs, they were in overall not well informed about the ongoing programs and the program that suits their needs the most. The service organization should therefore actively publicize the program and provide sufficient information about it .Second, instead of a one-off program, the locals should be empowered to take over the program eventually and develop it as a local business model. Last, the locals from the center as well as the outskirts of Yeongwol should organize a learning net, collaboratively develop a further program, and assess its effectiveness by employing a thorough monitoring system.
This paper proposes a new numerical approach to model geocell reinforced soils, where the geocell is described as membrane elements and the complex interaction between geocell and soil is realized by coupling their degrees of freedom. The effectiveness and robustness of this approach are demonstrated using two examples, i.e., a geocell-reinforced foundation and a large scale retaining wall project. The first example validates the approach against established solutions through a comprehensive parametrical study to understand the influence of geocell on the improvement of bearing capacity of foundations. The study results show that reducing the geocell pocket size has a strong effect on improving the bearing capacity. In addition, when the aspect ratio maintains the same value, the bearing capacity improvement with increasing geocell height is insignificant. Comparing with the field monitoring and measurement in the project, the second example investigates the application of the approach to practical engineering projects. This paper provides a practically feasible and efficient modelling approach, where no explicit interface or contact is required. This allows geocell reinforced soils in large scale project can be effectively modelled where the mechanism for complex geocell-soil interaction can be explicitly observed.
The defense IT master plan is the plan for promoting defense informatization and is established by the Ministry of National Defense every five years. In addition, an implementation plan has been established in accordance with the master plan every year to promote the informatization project. However, since there is no systematic methodology to check and analyze the master plan comprehensively, it is difficult to judge whether the goals suggested in the master plan are achieved, and continuous monitoring of the project is limited. This study proposes a concept and framework for defense IT investment management and proposes a methodology for examining and analyzing the progress of the defense IT plan by referring to the U.S. Department of Defense's IT Plan and the performance management structure of the national IT master plan. As a methodology for managing defense IT investment, we propose an IT investment management code system from the perspective of an IT portfolio and verify its applicability through case studies. The results of this study are expected to improve the defense IT performance management system and improve the efficiency and effectiveness of the defense IT project.
International journal of advanced smart convergence
/
제10권2호
/
pp.187-193
/
2021
Data conversion refers to the process of extracting the data existing in the existing system, that is, the past data accumulated by the old information system or other methods and transferring it to the improved table of the new system. The person in charge of data conversion refers to the entire process of converting to the final destination table according to the rules designed/planned in advance. In most cases, data conversion design should be consider when the old system replace or the data of another existing system is converted and applied to a newly constructed information system. The goal of data conversion is to understand the current database system of operating environment, understand the characteristics of the DBMS in use, maintain the optimal database structure, and make the new system perform at its best. Data conversion methods are largely divide into a method using a tool and a conversion method using a program preparation. In this paper, we examine the advantages and disadvantages of the data conversion method, and try to derive the problems of the existing data conversion method. Based on this, an improved data conversion method for the system upgrade project was proposed, and verified through a questionnaire of an IT expert to prove its effectiveness
The 1th International Conference on Construction Engineering and Project Management
/
pp.845-848
/
2005
Technology transfer (TT) has been defined as the shared responsibility between the source and the destination for ensuring that technology is accepted and at least understood by someone with the knowledge and resources to apply and/or use the technology. The adoption of TT in construction industries is necessary for economic growth to occur in developing countries such as Thailand. This process should provide numerous benefits for the host sector in areas such as increased productivity, enhancement of product quality, cost savings, improvements in market share and entry to new markets. However, there are many factors, which may impact on the TT process and its subsequent outcomes for Thai construction firms and individuals, including, the transfer environment, learning environment, transferor characteristics and transferee characteristics. The performance and interaction of these enablers will influence the degree of value added to the local construction sectors in areas such as economic advancement, knowledge advancement and project performance. This paper presents a conceptual framework for international TT that accommodates the numerous factors believed to impact on the processes effectiveness. Through a Pilot Study, where 27 industry professionals from Thailand were interviewed, the significant factors which impact on the TT process have been identified along with the strength of interrelationship between individual and groups of factors. Future research seeks to target a greater sample of respondents with the view to validate the conceptual model and apply it on a number of large Thai projects where international TT was incorporated into the project agreement.
The purpose of this study is to propose a guideline to help the client and bidder operate the BIM project in the domestic road field. As BIM design is mandatory in the construction field, documents disclosed by the ordering agency must essentially include procedures and step-by-step requirements to support BIM. The purpose of this study is to propose the structure and components of the guidelines that practitioners need practically by utilizing the currently announced road field guidelines. The guidelines are analyzed based on the procurement documents that were pre-emptively shared overseas, and supplemented according to the domestic situation. Furthermore, the effectiveness of the revised guidelines is confirmed through expert consultation. This study aims to contribute to creating an environment in which construction practitioners who have no experience in BIM project can efficiently carry out BIM projects.
Today, risks created by uncertainty must be managed for successful project execution. From this perspective, applying a risk management process is very important for successful defense systems test works. This paper describes 'the implentation of risk management process for test work' carried out by DTERI's process improvement activities. In this study, the concept of risk management process, and details of the risk management process are examined through PMBOK and ISO/IEC/IEEE 15288, CMMI. After that, we defined 'Standard Process for Risk Management' of defence systems test works. And, we describe 'Risk Management Function' of DTERI's Project Management System(PMS) and the risk management process of DTERI. Finally, the effectiveness of the risk management standard process is verified through quantitative analysis.
본 기술의 진화는 역사상 유래 없는 속도로 사회와 기업의 변화를 가속하고 있고 요구되는 대응을 위해 대형 IT 프로젝트가 긴박하게 추진되고 있다. 고도의 기술과 대규모 업무를 다루고, 막대한 인력과 비용이 투입되는 대규모 프로젝트는 인간 심리와 복잡계 이론에 기반한 전략적 갈등관리가 요구되나, 기존의 관리방법은 이에 부응하는 실용적 기제를 제시하지 못하는 실정으로 프로젝트 실패가 증가하고 있다. 본 연구는 적절한 해법을 찾기 위해 프로젝트 실패 현황과 성과 요인, 프로젝트 리더십에 대해 관련 연구하였고, 대형 IT 프로젝트의 복잡성과 갈등구조에 주목하여 기존의 프로젝트 관리방안에서는 간과하였던 심리학적, 행동경제학적 접근을 접목하였다. 논문에서 제시한 프로젝트 행태관리 방안은 대규모 IT 프로젝트의 주요 실패 행태들을 근원적이고 선제적으로 해소할 수 있는 프로젝트 단계별 행태관리 전략과 실천적 프랙티스를 제시한다. 해당 현장 전문가 및 실무자 그룹의 설문조사를 통해 제안된 행태관리 방안의 유효성에 대한 기대를 검증하였고, 본 방안을 대형 프로젝트 관리에 도입함으로써 보다 안정적인 프로젝트 성공 기반을 확보할 수 있다.
Objectives: The purpose of this analysis was to assess the maternal and child health program in Lao PDR, which was implemented to reduce maternal and child mortality in Laos. Target areas for the project included 2 provinces (Xiengkhuang, Houaphan) with all 18 districts within them. The beneficiaries of this project included 121,000 childbearing women and 62,000 children under 5 years old (LSIS, 2012). Methods: In this study, it was done for efficiency evaluation of the assistance projects of the health sector of maternal and child health promotion program in Laos that took place from 2010 to 2013. We conducted a cost-benefit analysis for the evaluation of the effectiveness of that program was being carried out effectively. Results: This evaluation adopted the Cost-Benefit analysis approach. Key findings of the Cost-Benefit analysis are the following: The Benefit-Cost Ratio of 1.012, Net Present Value of 84,250,000 Korean Won, an estimated Internal Rate of Return of 10.12%. These findings suggest that project activities were efficiently implemented. Conclusion: As a result, maternal and child health project in Laos has been analyzed that there was economic efficiency. Therefore, It is considered necessary and continued support expansion of program in the future. The direction of maternal and child health project in Laos, approach and community policy support must be included. Integrated approach between the program approach and overall health should be performed for healthy life habit.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.