• Title/Summary/Keyword: project effectiveness

Search Result 853, Processing Time 0.025 seconds

An Analysis of the Effect of the Pilot Project for the Management of the Elderly's Food Service in Cheongju City: Focused on improving hygiene control (청주시 노인급식 관리지원 시범사업의 효과분석 : 위생관리개선을 중심으로)

  • Lee, Joo-Eun
    • Journal of Digital Convergence
    • /
    • v.19 no.1
    • /
    • pp.431-441
    • /
    • 2021
  • In this study, the hygiene control status of meals for the elderly was investigated for the elderly care facilities, communal living families, and day care centers, which are members of the Cheongju Social Welfare Food Management Support Center, and the improvement of food hygiene management was compared and analyzed to find out the effectiveness of the pilot project after conducting management support such as hygiene education for the elderly and providing related supplies and information. The study found that after the first support, the average score of overall feeding hygiene control increased significantly from 63.13 points (out of 100) to 75.10 points (p<0.001) and from 75.10 points (out of 100) to 80.89 points (p<0.001). After primary support, 16 out of 29 items showed significant differences in average scores in the checklist, and 7 out of 29 after secondary visit support (p<0.05, p<0.01, p<0.001). Based on the effectiveness of the above-mentioned pilot project to support senior citizens' meal service management, more welfare facilities for senior citizens should be continuously supported by the Foodservice Management Support Center.

Application of Data Dictionary to BIM for Small and Medium Project (중소규모 사업용 BIM을 위한 데이터 사전의 활용)

  • Lee, Hwan Woo;Lee, Kyung Sub;Kim, Kwang Yang
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.6
    • /
    • pp.431-438
    • /
    • 2013
  • The systemization of construction information is required over whole life cycle of facilities to improve productivity of construction industry. BIM(Building Information Modeling) is a technology to manage information based on 3D information model. It has been actively suggested as one of the alternatives. However, it may be currently concentrated on the large project while the small and medium project based on BIM are slightly treated in indifference. In the case of small and medium project, the loss of information has been occurred more seriously than large project. However, it is hard to introduce BIM to the small and medium companies due to the lack of investment resources. This study has been performed to set up information management system based on BIM considering characteristics of small and medium project without excessive investment. In this study, pseudo BIM is defined as BIM for small and medium project. The concept of pseudo BIM has been suggested. The PLIB of ISO and construction information classification system of MOLIT in Korea are used to construct data dictionary for pseudo BIM. A pilot test is performed to verify the effectiveness of pseudo BIM.

A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims (해외 대형건설공사 공기지연클레임의 공기연장기간 입증방법)

  • Kim, Young-jae;Kim, Tae-kyoung;Jo, Duk-sang;Lee, Hwang-ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.165-176
    • /
    • 2015
  • Recently many Korean large-sized construction companies as well as specialty contractors have been expanding their business in the overseas market to mitigate impacts from long-term stagnation in the domestic market. Such as a result, it has been arisen as a major issue that contractors effectively manage the delays which have been commonly faced with in international mega-projects. Therefore it can be said that the ability of the delays management leads a success of project. This paper presents a review of literature for delay analysis methods such as time impact analysis(TIA) and raises practical problems to rationally substantiate the duration of extension of time(EoT) in international mega projects which have wide scope of works as well as complicated and detailed contract baseline programs by taking theoretical approaches. We suggest the two improvement concepts to substantiate the EoT claims which are effectively applicable to practical projects. The first is to sort out dominant delays among numerous delays in advance of applying a delay analysis. The second is to set up the delay sections with the advanced concept for analysing delays' effects by TIA. This study performed a case study on an actual international mega-project. to confirm the effectiveness of improvement concepts that this practical approach is applicable for the assessment of EoT. In conclusion, this paper supposes to provide practitioner in charge for an EoT claim with an advanced substantiation methodogy when they not only analyse the construction delays by using TIA, but also negotiate with stakeholders about with the assessment of EoT.

A Study on the Improvement of Item for Discrimination Increasing in Post Evaluation of Public Building Construction Project (공공건축공사 사후평가 변별력 향상을 위한 항목개선 연구)

  • Yoon, Tai-Hyong;Lee, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.21-31
    • /
    • 2011
  • The Ministry of Land, Transport & Maritime Affairs(former-The Ministry of Construction and Transportation)establish & promulgated the guide line of The Law of Post Evaluation on May 10, 2001(Article 58824-318) to public construction project under the Operation Law of Construction Engineering Management the 18 clause of Article 38 in order to induce & collect useful data about construction project when plan new similar project in the future about the initial planning phase, former and past accomplished businesses to construction works, results, efficiency, effectiveness. Ever since The Ministry revised 5 times, the former contents are composed for SOC, big volume civil project, and revised contents Article 2010-14(Jan 15, 2010) included some architectural project, but that was not definite the evaluation contents, direction & objective standard. So evaluation index implements are ambiguous about accomplished project. This research arranged the correctness evaluation indicators, criterions for decide the grades in order to helpful informations for similar architectural project in the future.

The Study on Instructional Effect and Satisfaction of Project-based Learning (팀 기반 프로젝트 수업효과와 수업만족도에 관한 연구)

  • Shin, Yeon-Ha;Ryu, Ki-Sang
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.12
    • /
    • pp.1-12
    • /
    • 2020
  • The study is to analyze the value of satisfaction of instructional process to university students and to verify the relationship between the factors that how students make the team for class activity and instructional effect. According to this, the purpose of this study is to analyze the effect of lecture-based instruction and the project-based learning and verify the component factor of project-based learning so that this study can suggest various ways to participate in classes actively. For this study, the students participating in the classes from this researcher were selected and it was analyzed with quantitative and qualitative research. The qualitative research was in progress for 15 weeks class from September to December 2019 and the survey was done at the last day of 15 weeks class and project. Frequency, difference, correlation and regression analysis were conducted through SPSS 23.0 with 80 copies of the questionnaire. The result of this study, at first, the instructional effect and satisfaction of satisfaction on project-based learning is higher than teacher-centered instruction. Second, the team cohesion and team-work is giving a huge impact on instructional effect and satisfaction. At last, project-based leaning makes students participate in the class. Enjoy and satisfy in the course of class participation regardless of the result. Based on these findings, we are looking for the ways to use the project-based leaning and provide the objective data for the planning and production of class program to improve the effectiveness of the class. In addition, we discussed the implications and limitations of this study as well.

A Study on Development and Effectiveness of the Indicatives for Analysis of the Effects of a Book Sharing Project on pre-schoolers of Supporter' Reading Care in Gyeonggi-do (경기도 책꾸러미 사업을 통한 양육자의 독서육아 효과 분석을 위한 지표개발 및 효과성 연구)

  • Choi, In-Ja;Yoon, Sung-Une;Kim, Soo-Kyoung;Hoang, Gum-Sook;Lee, Sun-Ai
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.56 no.2
    • /
    • pp.133-155
    • /
    • 2022
  • The purpose of this study was to develop the indicatives for the analysis of the effects of Gyeonggi-do Book Sharing Project on pre-schoolers of supporter' reading care and thereby, suggest some data useful to the establishment of a reading culture promotion policy in Gyeonggi-do. Preceding studies and cases were reviewed to analyze the effects of the book-sharing project on pre-schoolers of supporter' reading care and thereby, develop some measurement indicatives, and thus, the indicatives were verified by professionals using the Delphi technique. Then, supporter of 3~5 year-old pre-schoolers were sampled from 7 cities and counties in Gyeonggi-do (Pocheon-si, Yangpyeong-gun, Yeoju-si, Dongducheon-si, Gapyeong-gun, Yeoncheon-gun and Yangju-si) to be divided into control and test groups and thereby, their reading care effect indicatives were compared before and after the test. The theoretical background is theory of family literacy, emergent literacy and parenting efficacy. As a result of developing the indicatives for analysis of pre-schoolers of supporter's reading care effects and comparing them for the sample pre-schoolers of supporter, before and after the test, the book-sharing project was found effective in improving reading care. The most difficult problem in pre-schoolers' earlier reading education involves acquisition of reading habit. So, it is deemed necessary to operate a regular book sharing project involving public organization and homes. As a result of developing the indicatives and analyzing the effects of the book-sharing project, it was confirmed that the project would serve to improve pre-schoolers of support's reading care and therefore, this study seems to provide some ground for the operation of a sustainable book-sharing project to narrow the education divide and promote a book reading culture in Gyeonggi-do.

A Study on Awareness to Effectiveness of the Cost Estimation Guidelines for e-Learning Content Development in Era of Convergence (융합시대의 이러닝 콘텐츠 개발대가 산정 가이드라인의 실효성에 관한 인식 연구)

  • Noh, Kyoo-Sung
    • Journal of Digital Convergence
    • /
    • v.13 no.11
    • /
    • pp.7-14
    • /
    • 2015
  • The purpose of this study is to present the base for activation policy for cost estimation guidelines of e-Learning content development. To achieve this purpose, this study investigates the effectiveness of cost estimation guidelines of e-Learning content development through a survey about executives and employees in the e-Learning industry and analyses them statistically. According to an analysis, companies(which abandoned order because the amount of money (cost) of e-Learning contents ordering is low and suffered a loss after acquiring e-Learning contents project order) have a relatively negative awareness about the effectiveness of cost estimation guidelines of e-Learning contents. On the other hand, contents focused companies have a relatively positive awareness about the effectiveness of cost estimation guidelines of e-Learning contents. In conclusion, this study suggests that government should recommend and enact announce the use of cost estimation criteria(guidelines) of e-Learning content development and provide the institutional tools soon as possible.

The Effect of Research Autonomy's Factors on the Organizational Effectiveness : Focusing on Researcher of the Government-supported Research Institutes (연구자율성 구성요인에 따른 조직효과성 연구 : 공공연구기관 연구자를 중심으로)

  • Kim, Jong-Gyu
    • Journal of Digital Convergence
    • /
    • v.15 no.5
    • /
    • pp.161-172
    • /
    • 2017
  • The purpose of this research is to take a look at what are research autonomy's factors of the government-supported research institutes with a new angle and how these factors influence on organizational effectiveness at the same time. ultimately, this research will suggest what government should guarantee and support researcher of the government-supported research institutes. In the groundwork, this research divides the level of research autonomy individual and organizational level, and divides the type of research autonomy intrinsic and extrinsic autonomy and also organizational commitment, and measure job satisfaction for organizational effectiveness. consequently, intrinsic autonomy which is associated with 'selection of research project', 'freely and lively traffic in ideas', 'choice of research methodology', 'utilization of research's result' is much more important than extrinsic autonomy for researchers to improve organizational effectiveness.

Assessing the Construct Validity of PMIS Effectiveness Measurement - Focusing the Administration DB Construction Projects - (공공정보시스템 효과성 측정지표의 타당성 검증에 관한 연구 - 행정정보DB구축사업을 중심으로 -)

  • Kang, Dong-Seok;Yoo, Si-Hyeong
    • The KIPS Transactions:PartD
    • /
    • v.16D no.3
    • /
    • pp.417-422
    • /
    • 2009
  • It is important to verify the validity of indicators assessing PMIS(Public Management Information System) effectiveness in academic research as well as practical affairs. As people invest in the field of Information Technology(IT) or IT system, private corporations are interested in investment in IT and it's business value. Moreover, the need of evaluating effectiveness on the investment in IT with the limited national budget are on the increase in public sector. Therefore, it is necessary to define the construct of PMIS(Public Management Information System) effectiveness so that we systematically compare and measure performance of public informatization project processed by each public organizations. It needs to develop indicators and verify the construct validity of them. we verified the construct validity of indicators assessing PMIS(Public Management Information System) effectiveness on the Administration DB Construction Projects.

A Study of Qualitative Effects of Agricultural Water-Saving Education of Farmers (농업인 물절약 교육의 정성적 효과 연구)

  • Lee, Seul-Gi;Choi, Kyung-Sook
    • Journal of Korean Society of Rural Planning
    • /
    • v.28 no.1
    • /
    • pp.71-79
    • /
    • 2022
  • Recently, alarming rates of climate change have amplified the importance of water conservation in the agricultural sector; emphasizing the implementation of an integrated approach as the principal water management strategy. As part of comprehensive measures to cope with drought in the agricultural and rural sectors, water-saving education models and pilot projects for farmers' education have been implemented since 2016, but these activities were launched as a one-time project in limited areas. Therefore, systematic and extensive efforts are required to highlight the site-specific and tangible benefits of water-saving education and public relations projects. As part of this study, educational sessions and surveys were conducted in the Yeoju-Icheon, Seosan-Taean, and Gyeongju areas to reflect the on-site applicability of the water-saving education model. Based on the survey of previous studies, a total of 16 water-saving effectiveness factors were developed and the effectiveness was derived for each factor. As a result of farmer education, the overall effectiveness evaluation score of 1.13 increased to 3.34, and the effectiveness of each factor was also improved. These water-saving education effectiveness factors can be used as basic data for determining and launching future policies or systems to improve the water-saving education of farmers. In addition, this study raises the need to prepare feasible related systems that can lead farmers to actively participate in water management and conservation and to promote systematic and continuous water conservation education and promotion policies.