Estimation of Construction Equipment Production Rates: Focus on Efficiency Rate (건설기계 시공능력 산정에 관한 연구 : 작업효율 중심으로)

  • Park, Hee-Sung;Han, Ye Lyeong;Huh, Youngki;Ahn, Bang Ryul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.67-72
    • /
    • 2008
  • Heavy equipment is a very important factor for successful construction implementation. Also, the cost for heavy equipment is a major part of construction cost. Therefore, the estimation of equipment cost is a critical job in the construction planning phase. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability per hour and cost. Although the performance of equipment has been improved, the efficiency rates in the formula are not updated lately. Therefore, this research performed several site visits to measure construction equipment working time and then calculates the efficiency rates for hydraulic backhoe, loader, and dump truck. The results show that the measured efficiencies of backhoe and loader are higher than current ones and vice versa for dump truck. This research proposes the needs for a standardized calculation formula and systematic and long-term data collection and measurement for updating efficiency rates for heavy equipment.

Preliminary design of a production automation framework for a pyroprocessing facility

  • Shin, Moonsoo;Ryu, Dongseok;Han, Jonghui;Kim, Kiho;Son, Young-Jun
    • Nuclear Engineering and Technology
    • /
    • v.50 no.3
    • /
    • pp.478-487
    • /
    • 2018
  • Pyroprocessing technology has been regarded as a promising solution for recycling spent fuel in nuclear power plants. The Korea Atomic Energy Research Institute has been studying the current status of equipment and facilities for pyroprocessing and found that existing facilities are manually operated; therefore, their applications have been limited to laboratory scale because of low productivity and safety concerns. To extend the pyroprocessing technology to a commercial scale, the facility, including all the processing equipment and the material-handling devices, should be enhanced in view of automation. In an automated pyroprocessing facility, a supervised control system is needed to handle and manage material flow and associated operations. This article provides a preliminary design of the supervising system for pyroprocessing. In particular, a manufacturing execution system intended for an automated pyroprocessing facility, named Pyroprocessing Execution System, is proposed, by which the overall production process is automated via systematic collaboration with a planning system and a control system. Moreover, a simulation-based prototype system is presented to illustrate the operability of the proposed Pyroprocessing Execution System, and a simulation study to demonstrate the interoperability of the material-handling equipment with processing equipment is also provided.

Development of Automatical Soybean Sprouting Equipment for Medium Amount Production by Using Multiple Siphons (복수 싸이펀을 이용한 중량생산용 콩나물 자동재배기 개발)

  • 김만중;백승화;최용배;김형욱
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.28 no.4
    • /
    • pp.886-889
    • /
    • 1999
  • To develope the soybean sprouting equipment(a type of cabinet) for medium amount(one bucket; 10~13kg) production of soybean sprouts, the watering system was made of four siphons and four the bottle necked water tank. Diameter of four siphons used for development of the watering system were 8, 13, 17 and 21mm, respectively and their water exhausting volumes were 40, 92, 154, 524ml/sec, respectively. The watering system can be automatically watered 524ml/sec without electric supply. The soybean sprouting equipment is consisted of four the bottle necked water tanks with the four siphons and six sprouting buckets with net shaped bottom for water draining. The soybean sprouting equipment with the watering system may be produced more than one box a day in the condition of 6~7 watering times a day at 25~30oC.

  • PDF

A Competitive Intensification Plan for Marine Leisure Equipment Industry in the Southeast Region

  • Lee, Jae-Hyung
    • Journal of Navigation and Port Research
    • /
    • v.36 no.2
    • /
    • pp.131-140
    • /
    • 2012
  • Since 2000, S. Korea is building yachts through government supported localization, cooperation between industry and educational organizations, or partnerships with foreign firms but the yacht building has yet only accomplished trial manufactured ships and one-time production. Because of a lack of mass production, the industry assesses the domestic technical skills to an average 50~60% of developed countries and its market share is less than 1% in the world. In addition, domestic marine equipment is heavily depending on imports and the industry is experiencing shortage of technology and experts, small-sized companies, insufficient industry and educational organizations' cooperation networks, inadequate legislation and policies, deficient domestic market vitalization, and scarce international information. Thus, this study focuses on the alternative plans to strengthen competitiveness and to cope with problems in the southeast marine leisure equipment industry.

A Study on IEEE 802.15.4 for wireless Communication of Data in the Factory Automation System (공장자동화시스템에서 데이터 송수신의 무선화를 위한 IEEE 802.15.4에 관한 연구)

  • Lee, Hye-Rim;Moon, Il-Young
    • Journal of Advanced Navigation Technology
    • /
    • v.13 no.2
    • /
    • pp.238-243
    • /
    • 2009
  • Now, the production process systems are largely based on automatic system using the wired network. The production process systems using wired network has disadvantage that it is expensive when the installed and replaced equipment. The each equipment happens to repair cost for control and management in production processes. And the replaced equipment has also the additional expense and breaks production process. These problems are solved through wireless communication between the industrial equipments. So, we propose wireless production process system based on IEEE 802.15.4 technology. It solves a complicated space and stops by replaced equipment in the factory. Then we simulated and analyzed IEEE 802.15.4 for Industrial Equipment based on Wireless Network.

  • PDF

A Case Study on the Improvement of Display FAB Production Capacity Prediction (디스플레이 FAB 생산능력 예측 개선 사례 연구)

  • Ghil, Joonpil;Choi, Jin Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.2
    • /
    • pp.137-145
    • /
    • 2020
  • Various elements of Fabrication (FAB), mass production of existing products, new product development and process improvement evaluation might increase the complexity of production process when products are produced at the same time. As a result, complex production operation makes it difficult to predict production capacity of facilities. In this environment, production forecasting is the basic information used for production plan, preventive maintenance, yield management, and new product development. In this paper, we tried to develop a multiple linear regression analysis model in order to improve the existing production capacity forecasting method, which is to estimate production capacity by using a simple trend analysis during short time periods. Specifically, we defined overall equipment effectiveness of facility as a performance measure to represent production capacity. Then, we considered the production capacities of interrelated facilities in the FAB production process during past several weeks as independent regression variables in order to reflect the impact of facility maintenance cycles and production sequences. By applying variable selection methods and selecting only some significant variables, we developed a multiple linear regression forecasting model. Through a numerical experiment, we showed the superiority of the proposed method by obtaining the mean residual error of 3.98%, and improving the previous one by 7.9%.

Development of Real-time Process Management System for improving safety of Shop Floor (생산현장의 안전성 향상을 위한 실시간 공정관리 시스템 개발)

  • Lee, Seung Woo;Nam, So Jeong;Lee, Jai Kyung;Lee, Hwa Ki
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.4
    • /
    • pp.171-178
    • /
    • 2013
  • Workers are avoiding production/manufacturing sites due to the poor working environment and concern over safety. Small and medium-sized businesses introduce new equipment to secure safety in the production site or ensure effective process management by introducing the real-time monitoring technique for existing equipment. The importance of real-time monitoring of equipment and process in the production site can also be found in the ANSI/ISA-195 model. Note, however, that most production sites still use paper-based work slip as a process management technique. Data reliability may deteriorate because information on the present condition of the production site cannot be collected/analyzed properly due to manual data writing by the worker. This paper introduces the monitoring and process management technique based on a direct facility interface to secure safety in the field by improving the poor working environment and enhance there liability and real-time characteristics of the production data. Since the data is collected from equipment in real-time directly through the SIB-based interface and PLC-based interface, problems associated with workers' manual data input are expected to be solved; safety can also be improved by enhancing workers' attention to work by minimizing workers' injuries and disruption.

The Operational Optimization of Semiconductor Research and Development Fabs by FAB-wide Scheduling (FAB-Wide 스케줄링을 통한 반도체 연구라인의 운용 최적화)

  • Kim, Young-Ho;Lee, Jee-Hyong;Sun, Dong-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.4
    • /
    • pp.692-699
    • /
    • 2008
  • Semiconductor research and development(R&D) fabs are very different than production fabs in many ways such as the scales of production, job priority, production methods, and performance measures. Efficient operations of R&D fabs are very important to the development of new product, process stability, high yield, and ultimately company competitiveness. This paper proposes the fab-wide scheduling method for operational optimization of the R&D fabs. Most scheduling systems of semiconductor fabs have only focused on maximizing throughput of each separated areas without considering WIP(works in process) flows of entire fab. In this paper, we proposes the a fab-wide scheduling system which schedules all lots to entire fab equipment at once. We develop the MIP(mixed integer programing) model which allocates the lots to production equipment considering many constraints of all processes and the CP(constraint programming) model which determines the sequences of the lots in the production equipment. The proposed FAB-wide scheduling model is applied to the newly constructed R&D fab. As a result, we have accomplished the system based automated job reservation, decrease of the hot lot delay, increase of the queue time satisfaction, the high throughput by maximizing the batch sizes, decrease of the WIP TAT(Turn Around Time).

A Study of JIT-GT Composite Plant Layout (JIT-GT 혼합설비 배치에 관한 연구)

  • Park Jin Hong;Yang Kwang Mo;Cho Jung Hyun;Kang Kyung Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.47-51
    • /
    • 2004
  • Facility layout for enterprise's competitive power strengthening and construction of offensive manufacture line and direction presentation for design of production management system that is new by operation improvement according to S company. In enterprise in JIT(Just in Time) system of leading persons affecting in productions among a lot of habitat factor analyze. It is that through equipment Layout among those factors enterprise my problem improve and serves enterprise's absolute ability cultivation. Even if it is JIT production main point that affect to apply the modular production to productive system among at equipment Layout, lot size, bottleneck session etc. worker's multi-function anger, change of demand factor and productive capacity add. 'S' Through enterprise's example, I wish to establish Korean medium and small enterprises' manufacturing industry style equipment Layout model by taken place effect interpretation.

  • PDF

Simulation of Block Logistics at a Big Shipyard (대형 조선소의 블록 물류 시뮬레이션)

  • Song, Chang-Sub;Kang, Yong-Woo
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.6
    • /
    • pp.374-381
    • /
    • 2009
  • To meet the soaring demand recently, South Korea big shipbuilders are examining two things. One is new investment in plant and equipment. The other is replacement of production resources. Considering plant & equipment investment and replacement of production resources, even if actual production ability would be enough, the real output could be affected by limitation of logistics with lack of analysis. As we set up big shipyard in virtual space, we could perform actual production by using confirm production plan in virtual space. We've analyzed the load of block stock, load of road and load of transporter for logistics effects are followed by production increase. This research is to determine the possible problems of those analyzed results and to present the resolution using the current layout. And then modified yard layout, we reanalyzed previous three logistics effects. This simulation model could help administrator to make rational decision for changing yard layout.